322 projects on file, including joint ventures this contractor is part of.
Total projects
322
Total budget
₱20B
Average progress
89.9%
Completion rate
78.9%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
20
6.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 188 | ₱12.7B | 50.5 | 13 | 86.9% |
| National Capital Region | 120 | ₱6.2B | 48.8 | 7 | 93.4% |
| Region IV-A | 11 | ₱846.4M | 58.6 | 0 | 98.5% |
| Region I | 3 | ₱185M | 52.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 162 | ₱10.4B | 52.5 | 11 | 91.2% |
| Roads | 78 | ₱4.7B | 45.5 | 0 | 88.7% |
| Buildings and Facilities | 46 | ₱2.8B | 45.3 | 5 | 85.9% |
| OTHER | 18 | ₱1B | 58.2 | 2 | 93.3% |
| Bridges | 12 | ₱633.3M | 42.4 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱191.3M | 95.0 | 2 | 54.1% |
| Bridges, Roads | 2 | ₱260.5M | 54.5 | 0 | 65.0% |
| GAA 2025 OO-1 | 1 | ₱7.6M | 86.0 | 0 | 85.5% |
| GAA 2025 OO-2 | 1 | ₱15M | 79.1 | 0 | 85.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 25C00034ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱7.6M | 85% | High risk86 | —-0.010 |
| 25C00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK (PHASE 11), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.3M | 61% | High risk81 | —-0.010 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 24C00085CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRAS. PROG.-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM),PHASE 13,BARANGAY BARDIAS,SAN MIGUEL,BULACAN | Region III | Region III | On-Going | ₱97.5M | 39% | High risk80 | —-0.001 |
| 25CP0145CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13) | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 28% | High risk80 | —-0.003 |
| 24C00088FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER, BARANGAY AKLE, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0049CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MANATAL, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CJ0108CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG RIO CHICO AT PRIS SDC, VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱15M | 86% | High risk79 | —-0.020 |
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CP0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III,SITIO PELON,BRGY. CAMACHI | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0079CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE IV, SITIO PELON, BRGY. CAMACHILE | Region III | Bulacan 3rd DEO | On-Going | ₱142.4M | 31% | High risk77 | —-0.007 |
| 25CP0065CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST.OF ROAD, PHASE I, SITIO PELON, BARANGAY CAMACH | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 39% | High risk77 | —-0.010 |
| 25CP0071CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO PELON, BARANGAY CAMAC | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 26% | High risk77 | —-0.004 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 24O00224ESTABLISHMENT OF THE DOST-NCR SCIENCE AND TECHNOLOGY RESOURCE AND INCUBATION CENTER (STRIC) | National Capital Region | National Capital Region | On-Going | ₱140.4M | 0% | High risk64 | Flagged0.038 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 24OD0322CONSTRUCTION OF FLOOD CONTROL WALL ALONG DULONG TANGKE CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 60% | High risk74 | Flagged0.032 |
| 24OD0321CONSTRUCTION OF FLOOD CONTROL WALL ALONG MALINTA CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 67% | High risk73 | Flagged0.031 |
| 24CJ0405CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 5), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 72% | High risk70 | Flagged0.027 |
| 24OE0184CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN G. SANTIAGO ELEMENTARY SCHOOL, BARANGAY 646, SAN MIGUEL, MANILA | National Capital Region | North Manila DEO | On-Going | ₱39M | 20% | Medium risk49 | Flagged0.019 |
| 24C00013NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD (PACKAGE 2), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱96.5M | 65% | High risk74 | Flagged0.012 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 24CC0393CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, SITIO DULO, BARANGAY CANALATE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 0% | High risk76 | Flagged0.006 |
| 24CC0558CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTA ELENA (PUMPING STATION NO. 2), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱86.8M | 0% | High risk76 | Flagged0.006 |
| 22O00100CONSTRUCTION OF PUBLIC ATTORNEY'S OFFICE (PAO) BUILDING, PHASE II, COMMONWEALTH AVENUE, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱289.5M | 30% | High risk65 | Flagged0.005 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 20O00012CONSTRUCTION OF HHSG PA ADMINISTRATION BUILDING PHASE I WITH PARKING AND GROUND DEVELOPMENT, FORT ANDRES BONIFACIO, TAGUIG CITY | National Capital Region | National Capital Region | On-Going | ₱335.3M | 87% | High risk65 | Flagged0.002 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24O00051CONSTRUCTION OF PUBLIC ATTORNEYS OFFICE (PAO) BUILDING, PHASE IV, COMMONWEALTH, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱238.6M | 0% | High risk65 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22AI0147CONSTRUCTION OF SLOPE PROTECTION ALONG BANILA RIVER, BALUNGAO-ROSALES, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | Completed | ₱43M | 100% | Medium risk48 | —-0.069 |
| 177 | 22AI0146CONSTRUCTION OF SLOPE PROTECTION ALONG BANILA RIVER, BALUNGAO-ROSALES, PANGASINAN (PACKAGE 4) | Region I | Pangasinan 3rd DEO | Completed | ₱43.2M | 100% | Medium risk48 | —-0.069 |
| 178 | 21OE0086CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 601, STA. MESA, MANILA | National Capital Region | North Manila DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.095 |
| 179 | 18OE0093ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-J. RIZAL AVE.-K0004+228.90-K0004+890.0, K0003+166.60-K0003+209.70, K0005+495. | National Capital Region | North Manila DEO | Completed | ₱43.5M | 100% | Medium risk47 | —-0.099 |
| 180 | 17OE0024LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF DRAINAGE SYSTEM BRGY. 311, ZONE 31, STRA CRUZ, MANILA | National Capital Region | North Manila DEO | Completed | ₱5.6M | 100% | Medium risk47 | —-0.062 |
| 181 | 21OE0090CONSTRUCTION OF RETENTION BASIN ALONG ESTERO DE SAMPALOC PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱46.7M | 100% | Medium risk47 | —-0.082 |
| 182 | 20OE0203CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT P. GUEVARRA ELEMENTARY SCHOOL, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱32.8M | 100% | Medium risk47 | —-0.047 |
| 183 | 19OE0142ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - ARLEGUI BR. 1 ALONG ARLEGUI ST. | National Capital Region | North Manila DEO | Completed | ₱11.3M | 100% | Medium risk47 | —-0.065 |
| 184 | 23OE0229CONSTRUCTION OF 3STY6CL, ELPIDIO QUIRINO HIGH SCHOOL, CITY OF MANILA | National Capital Region | North Manila DEO | Completed | ₱30M | 100% | Medium risk47 | —-0.042 |
| 185 | 19OG0109IMPROVEMENT OF MALAKAS ST., QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱19.4M | 100% | Medium risk46 | —-0.099 |
| 186 | 23OE0124REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - H LOPEZ BLVD -K0006 + (-526) - K0006 + (-062) | National Capital Region | North Manila DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.099 |
| 187 | 18OD0189REHABILITAITON OF ROADS AND DRAINAGE IN MAKIPOT ST. BRGY. MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.3M | 100% | Medium risk46 | —-0.097 |
| 188 | 19OE0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - C. PALANCA ST. - K0003 + (-906.25) - K0003 + (-548.80), K0003 + (-548.80) - K0003 (-478) | National Capital Region | North Manila DEO | Completed | ₱17.1M | 100% | Medium risk46 | —-0.100 |
| 189 | 21OC0102CONSTRUCTION OF REVETMENT WALL ALONG MAKATI-PATEROS RIVER (PHASE II), BRGY. COMEMBO,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱33.5M | 100% | Medium risk46 | —-0.085 |
| 190 | 18OE0117ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-MCARTHUR BRIDGE-K0002+-236-K0002+126, (SO2346LZ) CHAINAGE 000-CHAINAGE 368, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.099 |
| 191 | 19OD0193CONSTRUCTION/ REHABILITATION OF RIVERWALL ALONG TULLAHAN RIVER, BRGY. MARULAS, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱45.5M | 100% | Medium risk46 | —-0.081 |
| 192 | 18OD0045CONSTRUCTION / REHABILITATION OF RIVERWALL ALONG TULLAHAN RIVER, STA. 6+024 - 6+128, BRGY. MARULAS, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱36.4M | 100% | Medium risk46 | —-0.087 |
| 193 | 23OE0044CONSTRUCTION OF RETENTION BASIN ALONG ESTERO DE SAMPALOC, PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱34.8M | 100% | Medium risk46 | —-0.088 |
| 194 | 20OE0101BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE SAN MIGUEL, STA. 1+897.80 TO STA. 1+989.00, MANILA | National Capital Region | North Manila DEO | Completed | ₱29.8M | 100% | Medium risk46 | —-0.088 |
| 195 | 18OE0065ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DELA REINA (RS) STA. 0+846.40 TO ST | National Capital Region | North Manila DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.089 |
| 196 | 18OE0062ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DELA REINA; (RS) STA. 0+526.80 TO | National Capital Region | North Manila DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.089 |
| 197 | 18OE0044ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DELA REINA (RS) STA. 0+435.55 TO ST | National Capital Region | North Manila DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.089 |
| 198 | 19OE0007ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT ALONG ESTERO DE LA REINA, (LS) STA. 0+412.35 TO STA. 0+460.35; STA. 0+640.05 TO | National Capital Region | North Manila DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.089 |
| 199 | 20OC0097REHABILITATION/UPGRADING AND DRAINAGE IMPROVEMENT ALONG 19TH AVENUE (ZONE-4) AND ITS VICINITY,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.085 |
| 200 | 21OE0004BANK IMPROVEMENT (STEEL SHEET PILE), ESTERO DE ULI-ULI, STA. 0+062.40 TO STA. 0+168.40, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.087 |