Contractor dossier
363 projects on file, including joint ventures this contractor is part of.
Total projects
363
Total budget
₱8B
Average progress
92.4%
Completion rate
85.1%
Average risk score
40.2
Medium risk on average, out of 100
Flagged as unusual
10
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| Region III | 93 | ₱3.3B | 37.8 | 4 | 99.1% |
| Region IV-B | 72 | ₱1.3B | 28.5 | 0 | 98.9% |
| Region XI | 8 | ₱275.9M | 50.9 | 1 | 94.2% |
| Region IV-A | 4 | ₱78.1M | 51.3 | 0 | 100.0% |
| Region I | 1 | ₱96.5M | 60.2 | 0 | 100.0% |
| Region X | 1 | ₱49.5M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 146 | ₱1.9B | 37.9 | 1 | 87.0% |
| Flood Control and Drainage | 86 | ₱3.6B | 42.5 | 1 | 97.2% |
| Roads | 86 | ₱1.9B | 40.4 | 0 | 95.0% |
| Water Provision and Storage | 24 | ₱30M | 18.2 | 0 | 100.0% |
| OTHER | 10 | ₱240.1M | 62.8 | 4 | 88.7% |
| GAA 2025 SSP | 7 | ₱34.5M | 78.7 | 2 | 97.9% |
| GAA 2025 OO-1 | 2 | ₱114.1M | 92.9 | 1 | 76.5% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 85.2 | 0 | 100.0% |
| Bridges | 1 | ₱35.2M | 47.6 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 25OD0129CONSTRUCTION OF VARIOUS ROADS AND DRAINAGE SYSTEMS ALONG BRGY. 133, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.6M | 100% | High risk89 | —-0.004 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 25CF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAANAN RIVER, LABI SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk85 | —-0.039 |
| 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 25OD0193CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | —-0.030 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 25OD0192CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), CIELITO ZAMORA, JR. HIGH SCHOOL, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.031 |
| 24CC0342CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 22CF0037: CONSTRUCTION OF MULTI-PURPOSE BUILDING, TABASACA CIS IRRIGATORS ASSOCIATION INC., BARANGAY BANTUG, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.074 |
| 25OD0260CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), REFORM 167 HOUSING, BRGY. 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | High risk69 | —-0.030 |
| 17DO0011MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-MARIKINA-INFANTA ROAD (SO1621LZ)-K0061+000-K0061+411 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.7M | 100% | High risk66 | —-0.070 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 21CC0010MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY & BANTAYAN ROAD IN SUPPORT OF ELECTRONIC MANUFACTURING, CHEMICALS, FURNITURE & GARMENTS & AGRI BUSINESS IND. IN BRGY. MALIS, PANGINAY, POBLACION, TABE & TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.042 |
| 15CC0331REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 21CF0184NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0095 + 400.00 - K0095+451.20 | Region III | Nueva Ecija 2nd DEO | Completed | ₱7M | 100% | High risk61 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 24OF0303CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 26% | Medium risk57 | Flagged0.024 |
| 16CF0224RESTORATION OF LABI BRIDGE APPROACH AND CHANNEL EXCAVATION ALONG DIGMALA RIVER, BONGABON, NUEVA ECIJA STA. 20+327.30, TO STA. 20+737.30, K0161+337 TO K0161+547.00, 210 L.M. | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk48 | Flagged0.009 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 23CI0061BASIC INFRA PROGRAM; BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES; CONSTRUCTION/REPAIR OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG QUITANGIL CREEK BRGY. SAN AGUSTIN TO BRGY STO NINO, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱69.2M | 100% | Medium risk34 | —-0.090 |
| 252 | 23CI0117BASIC INFRASTRUCTURE PROGRAM; BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION/REPAIR OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG SAPANGBALEN CREEK FROM BRGY, SAN ROQUE, MAGALANG TO BRGY PARALAYUNAN, | Region III | Pampanga 3rd DEO | Completed | ₱69.3M | 100% | Medium risk34 | —-0.088 |
| 253 | 23CI0118BASIC INFRASTRUCTURE PROGRAM; BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION/REPAIR OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG SAPANGBALEN CREEK FROM BRGY SAN ILDEFONSO TO BRGY STA MARIA, MAGALANG | Region III | Pampanga 3rd DEO | Completed | ₱69.2M | 100% | Medium risk34 | —-0.089 |
| 254 | 22ED0084CONSTRUCTION OF MPB (EVACUATION CENTER), CALUBAYAN, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.086 |
| 255 | 18CF0118CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER FLOOD CONTROL, LAUR, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.091 |
| 256 | 17OF0172CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT PAYATAS-B ANNEX E/S, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱19.8M | 100% | Medium risk34 | —-0.025 |
| 257 | 16OA0083EXPANSION/CONSTRUCTION OF LYING-IN AND TB DOTS NIUGAN HEALTH CENTER, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱5.7M | 100% | Medium risk34 | —-0.030 |
| 258 | 17OF0183CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM AT NORTH FAIRVIEW E/S, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱19.5M | 100% | Medium risk33 | —-0.025 |
| 259 | 20CF0098NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - NUEVA ECIJA - AURORA RD K0143+200.00 - K0144+078.00, K0145+(-746.00) - K0145+(-666.00) | Region III | Nueva Ecija 2nd DEO | Completed | ₱39.3M | 100% | Medium risk33 | —-0.103 |
| 260 | 18CF0120REHABILITATION / IMPROVEMENT OF PAMPANGA RIVER CONTROL, BRGY. SAN JOSEF, CABANATUAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱48.2M | 100% | Medium risk33 | —-0.091 |
| 261 | 23CF0034ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT TABLANG - GABALDON RD - K0136+000.00-K0136+960.00, K0140+029.00-K0140+140.00, K0141+000.00-K0141+471.40, K0141+478.30-K0141+835.00, K01 | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk33 | —-0.102 |
| 262 | 21CF0074REHABILITATION / IMPROVEMENT OF PAMPANGA RIVER FLOOD CONTROL STRUCTURE, STA. 4+489.72 - STA. 4+820.52 JULO, SAN ANTONIO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱52.5M | 100% | Medium risk33 | —-0.092 |
| 263 | 19CF0010ASSET PRESERVATION- PREVENTIVE MAINTENANCE-SECONDARY ROADS, JCT. TABLANG - GABALDON RD, K0140+038 - K0169+578 | Region III | Nueva Ecija 2nd DEO | Completed | ₱31.9M | 100% | Medium risk33 | —-0.103 |
| 264 | 18CF0038ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS - SUMACAB -SAN JOSEF - BONIFACIO ROAD | Region III | Nueva Ecija 2nd DEO | Completed | ₱38.8M | 100% | Medium risk33 | —-0.104 |
| 265 | 23CJ0044BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL RIGHT DIKE, AYSON TO DICOLOR SECTION (PACKAGE A), GERONA, TA | Region III | Tarlac DEO | Completed | ₱48.5M | 100% | Medium risk33 | —-0.087 |
| 266 | 23CF0030ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BANGAD-FORT MAGSAYSAY RD - K0126+817-K0127+000, K0127+495.00-K0128+848.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱22.4M | 100% | Medium risk33 | —-0.105 |
| 267 | 18CF0041ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE, BANGAD- FORT MAGSAYSAY ROAD, K0122+(-450) - K0122+405, K0122+450 - K0123+199, K0123+199 - K0123+226, K0123+226- K0123+258.13 | Region III | Nueva Ecija 2nd DEO | Completed | ₱22.4M | 100% | Medium risk32 | —-0.102 |
| 268 | 22CC0148CONSTRUCTION OF BULIHAN-LONGOS CREEK, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.090 |
| 269 | 21CF0177OFF CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DAANG MAHARLIKA(LZ) - K0101 + 020.00 - K0101 + 314.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱24M | 100% | Medium risk32 | —-0.105 |
| 270 | 20CF0006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - STA. ROSA - TARLAC RD - K0108+450.00 - K0108+996.00, K0110+000.00 - K0110+262.84 | Region III | Nueva Ecija 2nd DEO | Completed | ₱19.4M | 100% | Medium risk32 | —-0.104 |
| 271 | 18CF0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SUMACAB- SAN JOSEF - BONIFACIO ROAD, K0111+423.16 - K0114+733.50 | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.2M | 100% | Medium risk32 | —-0.104 |
| 272 | 17OA0031REHABILITATION OF ALLEYS, BRGY. IBABA, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱2.8M | 100% | Medium risk31 | —-0.065 |
| 273 | 21CF0173REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE. (JASA) - K0 108 +587.50 - K0 108 + 827.30, K0 112 + 000 - K0 112 + 848.80 | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.6M | 100% | Medium risk31 | —-0.106 |
| 274 | 19CF0087CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DIGMALA RIVER FLOOD CONTROL, TUGATOG SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱36.9M | 100% | Medium risk31 | —-0.085 |
| 275 | 18CF0113CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL AT BRGY. VEGA, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱17M | 100% | Medium risk31 | —-0.088 |