Contractor dossier
363 projects on file, including joint ventures this contractor is part of.
Total projects
363
Total budget
₱8B
Average progress
92.4%
Completion rate
85.1%
Average risk score
40.2
Medium risk on average, out of 100
Flagged as unusual
10
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| Region III | 93 | ₱3.3B | 37.8 | 4 | 99.1% |
| Region IV-B | 72 | ₱1.3B | 28.5 | 0 | 98.9% |
| Region XI | 8 | ₱275.9M | 50.9 | 1 | 94.2% |
| Region IV-A | 4 | ₱78.1M | 51.3 | 0 | 100.0% |
| Region I | 1 | ₱96.5M | 60.2 | 0 | 100.0% |
| Region X | 1 | ₱49.5M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 146 | ₱1.9B | 37.9 | 1 | 87.0% |
| Flood Control and Drainage | 86 | ₱3.6B | 42.5 | 1 | 97.2% |
| Roads | 86 | ₱1.9B | 40.4 | 0 | 95.0% |
| Water Provision and Storage | 24 | ₱30M | 18.2 | 0 | 100.0% |
| OTHER | 10 | ₱240.1M | 62.8 | 4 | 88.7% |
| GAA 2025 SSP | 7 | ₱34.5M | 78.7 | 2 | 97.9% |
| GAA 2025 OO-1 | 2 | ₱114.1M | 92.9 | 1 | 76.5% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 85.2 | 0 | 100.0% |
| Bridges | 1 | ₱35.2M | 47.6 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 25OD0129CONSTRUCTION OF VARIOUS ROADS AND DRAINAGE SYSTEMS ALONG BRGY. 133, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.6M | 100% | High risk89 | —-0.004 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 25CF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAANAN RIVER, LABI SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk85 | —-0.039 |
| 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 25OD0193CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | —-0.030 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 25OD0192CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), CIELITO ZAMORA, JR. HIGH SCHOOL, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.031 |
| 24CC0342CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 22CF0037: CONSTRUCTION OF MULTI-PURPOSE BUILDING, TABASACA CIS IRRIGATORS ASSOCIATION INC., BARANGAY BANTUG, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.074 |
| 25OD0260CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), REFORM 167 HOUSING, BRGY. 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | High risk69 | —-0.030 |
| 17DO0011MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-MARIKINA-INFANTA ROAD (SO1621LZ)-K0061+000-K0061+411 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.7M | 100% | High risk66 | —-0.070 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 21CC0010MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY & BANTAYAN ROAD IN SUPPORT OF ELECTRONIC MANUFACTURING, CHEMICALS, FURNITURE & GARMENTS & AGRI BUSINESS IND. IN BRGY. MALIS, PANGINAY, POBLACION, TABE & TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.042 |
| 15CC0331REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 21CF0184NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0095 + 400.00 - K0095+451.20 | Region III | Nueva Ecija 2nd DEO | Completed | ₱7M | 100% | High risk61 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 24OF0303CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 26% | Medium risk57 | Flagged0.024 |
| 16CF0224RESTORATION OF LABI BRIDGE APPROACH AND CHANNEL EXCAVATION ALONG DIGMALA RIVER, BONGABON, NUEVA ECIJA STA. 20+327.30, TO STA. 20+737.30, K0161+337 TO K0161+547.00, 210 L.M. | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk48 | Flagged0.009 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23OF0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND TRIBUTARIES ALONG CULIAT CREEK, BARANGAY BAHAY TORO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.087 |
| 52 | 24OF0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY NOVALICHES PROPER, QUEZON CITY (PHASE II) | National Capital Region | Quezon City 1st DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.085 |
| 53 | 24OD0191CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH COVERED COURT, NORTH TRIANGLE SUBDIVISION, BARANGAY CAMARIN, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.6M | 100% | Medium risk49 | —-0.101 |
| 54 | 25OF0105CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GULOD, QUEZON CITY (PHASE 3) | National Capital Region | Quezon City 1st DEO | On-Going | ₱14.6M | 9% | Medium risk49 | —-0.033 |
| 55 | 25OF0098CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STA. LUCIA, QUEZON CITY (PHASE 3) | National Capital Region | Quezon City 1st DEO | On-Going | ₱14.6M | 10% | Medium risk49 | —-0.033 |
| 56 | 23KH0042CONSTRUCTION OF DRAINAGE SYSTEM ZONE 2 CANITO-AN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.093 |
| 57 | 24OD0245CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT ALMAR, BRGY. 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.101 |
| 58 | 23OF0031REHABILITATION OF FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY STA. MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 59 | 24OD0236CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. 159, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.099 |
| 60 | 24OD0275CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 183, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.101 |
| 61 | 24OF0252CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. TALIPAPA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱12.7M | 0% | Medium risk49 | —-0.026 |
| 62 | 18OF0189CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. BATASAN HILLS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱14.1M | 100% | Medium risk49 | —-0.082 |
| 63 | 21OF0154REHABILITATION OF MULTI-PURPOSE BUILDING (PHASE 2), BARANGAY SAN AGUSTIN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱11.5M | 100% | Medium risk49 | —-0.100 |
| 64 | 23OF0040CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY GULOD, NOVALICHES, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.101 |
| 65 | 22OF0169CONSTRUCTION OF MULTI-PURPOSE BUILDING, PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.101 |
| 66 | 24OD0033CONSTRUCTION OF FLOOD CONTROL WALL ALONG SAMPAGUITA CREEK, BARANGAY 171, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.087 |
| 67 | 25OF0070CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY BALONBATO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱9.8M | 7% | Medium risk49 | —-0.034 |
| 68 | 24OG0106CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN DR. JOSEFA JARA MARTINEZ HIGH SCHOOL, BARANGAY TATALON, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱39.7M | 95% | Medium risk49 | —-0.007 |
| 69 | 20OF0008CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND TRIBUTARIES, BRGY. HOLY SPIRIT (PHASE 5), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱47M | 100% | Medium risk49 | —-0.084 |
| 70 | 20LA0350CONSTRUCTION OF TWO (2) UNITS, TWO (2) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT KINGKING CES, PANTUKAN, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱66.3M | 100% | Medium risk49 | —-0.027 |
| 71 | 24OD0223CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA REFORM III, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱6.8M | 100% | Medium risk48 | —-0.101 |
| 72 | 19OF0185CONSTRUCTION OF MPB, BRGY. TANDANG SORA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.100 |
| 73 | 20OF0116CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.092 |
| 74 | 22OF0174CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 3) BARANGAY SAN AGUSTIN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.101 |
| 75 | 25OD0276CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), NATIVIDAD PHASE 1, BARANGAY 168, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱6.8M | 29% | Medium risk48 | —-0.045 |