Contractor dossier
363 projects on file, including joint ventures this contractor is part of.
Total projects
363
Total budget
₱8B
Average progress
92.4%
Completion rate
85.1%
Average risk score
40.2
Medium risk on average, out of 100
Flagged as unusual
10
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| Region III | 93 | ₱3.3B | 37.8 | 4 | 99.1% |
| Region IV-B | 72 | ₱1.3B | 28.5 | 0 | 98.9% |
| Region XI | 8 | ₱275.9M | 50.9 | 1 | 94.2% |
| Region IV-A | 4 | ₱78.1M | 51.3 | 0 | 100.0% |
| Region I | 1 | ₱96.5M | 60.2 | 0 | 100.0% |
| Region X | 1 | ₱49.5M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 146 | ₱1.9B | 37.9 | 1 | 87.0% |
| Flood Control and Drainage | 86 | ₱3.6B | 42.5 | 1 | 97.2% |
| Roads | 86 | ₱1.9B | 40.4 | 0 | 95.0% |
| Water Provision and Storage | 24 | ₱30M | 18.2 | 0 | 100.0% |
| OTHER | 10 | ₱240.1M | 62.8 | 4 | 88.7% |
| GAA 2025 SSP | 7 | ₱34.5M | 78.7 | 2 | 97.9% |
| GAA 2025 OO-1 | 2 | ₱114.1M | 92.9 | 1 | 76.5% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 85.2 | 0 | 100.0% |
| Bridges | 1 | ₱35.2M | 47.6 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 25OD0129CONSTRUCTION OF VARIOUS ROADS AND DRAINAGE SYSTEMS ALONG BRGY. 133, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.6M | 100% | High risk89 | —-0.004 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 25CF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAANAN RIVER, LABI SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk85 | —-0.039 |
| 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 25OD0193CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | —-0.030 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 25OD0192CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), CIELITO ZAMORA, JR. HIGH SCHOOL, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.031 |
| 24CC0342CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 22CF0037: CONSTRUCTION OF MULTI-PURPOSE BUILDING, TABASACA CIS IRRIGATORS ASSOCIATION INC., BARANGAY BANTUG, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.074 |
| 25OD0260CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), REFORM 167 HOUSING, BRGY. 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | High risk69 | —-0.030 |
| 17DO0011MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-MARIKINA-INFANTA ROAD (SO1621LZ)-K0061+000-K0061+411 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.7M | 100% | High risk66 | —-0.070 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 21CC0010MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY & BANTAYAN ROAD IN SUPPORT OF ELECTRONIC MANUFACTURING, CHEMICALS, FURNITURE & GARMENTS & AGRI BUSINESS IND. IN BRGY. MALIS, PANGINAY, POBLACION, TABE & TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.042 |
| 15CC0331REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 21CF0184NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0095 + 400.00 - K0095+451.20 | Region III | Nueva Ecija 2nd DEO | Completed | ₱7M | 100% | High risk61 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 24OF0303CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 26% | Medium risk57 | Flagged0.024 |
| 16CF0224RESTORATION OF LABI BRIDGE APPROACH AND CHANNEL EXCAVATION ALONG DIGMALA RIVER, BONGABON, NUEVA ECIJA STA. 20+327.30, TO STA. 20+737.30, K0161+337 TO K0161+547.00, 210 L.M. | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk48 | Flagged0.009 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18OF0119ROAD IMPROVEMENT OF SEMINARY ROAD, BRGY. BAHAY TORO, QC | National Capital Region | Quezon City 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.101 |
| 152 | 21OF0033REHABILITATION OF GASAN STREET, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱17.1M | 100% | Medium risk46 | —-0.101 |
| 153 | 22OG0108REHABILITATION OF SAN JUAN RIVER (PHASE VII), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱28.9M | 100% | Medium risk46 | —-0.083 |
| 154 | 25OD0078REHABILITATION/ RECONSRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0021 + 954 - K0022 + 126 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱15M | 100% | Medium risk46 | —-0.069 |
| 155 | 21OF0058CONCRETING AND DRAINAGE IMPROVEMENT AT BRGY. CULIAT, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.100 |
| 156 | 21OF0039CONCRETING AND DRAINAGE IMPROVEMENT AT BRGY. BAESA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.101 |
| 157 | 18OF0118REHABILITATION/IMPROVEMENT OF DRAINAGE SYSTEM MAXIMO VIOLA ST., Q.C | National Capital Region | Quezon City 1st DEO | Completed | ₱32.5M | 100% | Medium risk46 | —-0.084 |
| 158 | 20OF0055CONCRETING OF ROAD LIANO & AURIQUE STREET BRGY. SANGANDAAN (000.0000 TO 000.1750), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.097 |
| 159 | 20OF0053CONSTRUCTION OF ROAD MACARIA STREET, BRGY. TALIPAPA (000.0000 TO 000.1750) QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.097 |
| 160 | 18OF0048CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL STRUCTURE, TRIBUTARIES AND DRAINAGE SYSTEM AT BRGY. PAYATAS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.074 |
| 161 | 19OF0032CONSTRUCTION FLOOD CONTROL STRUCTURE, BRGY. HOLY SPIRIT(PHASE 5), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱46.6M | 100% | Medium risk46 | —-0.074 |
| 162 | 25OD0287CONSTRUCTION/ REHABILITATION OF ROADS AND DRAINAGE SYSTEMS ALONG MATRIX LOOP, NORTH MATRIX VILLE, BRGY. 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱18.9M | 35% | Medium risk46 | —-0.049 |
| 163 | 18OD0240CONSTRUCTION OF 4 STOREY 8 CLASSROOM SCHOOL BUILDING BAGONG SILANG RESETTLEMENT PROJECT, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.6M | 100% | Medium risk46 | —-0.039 |
| 164 | 24OD0269PREVENTIVE MAINTENANCE - PRIMARY ROADS - EPIFANIO DELOS SANTOS AVE (EDSA) - K0010 + (-920) - K0010 + (-844), K0010 + (-942) - K0010 + (-920) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.099 |
| 165 | 24OF0034REHABILITATION OF FLOOD CONTROL STRUCTURE AT TULLAHAN RIVER AT BARANGAY NAGKAISANG NAYON, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19.4M | 100% | Medium risk46 | —-0.087 |
| 166 | 24OD0146CONSTRUCTION OF DRAINAGE SYSTEM ALONG TAGAYTAY STREET, BARANGAY 126, 127, 128, 129 AND 130, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.084 |
| 167 | 20OF0031REHABILITATION OF DRAINAGE MALAMBO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.090 |
| 168 | 25OD0020CONSTRUCTION OF ROAD AND DRAINAGE, SAMAT STREET, MOUNTAIN HEIGHTS, BARANGAY 183, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.097 |
| 169 | 18OF0039REHABILITATION IMPROVEMENT OF DRAINAGE SYSTEM OF BACO ST., Q,C, | National Capital Region | Quezon City 1st DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.083 |
| 170 | 24OD0147CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG 10TH AVENUE (11TH ST. - KAMANTIGUE ST.), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.084 |
| 171 | 19OF0202CONSTRUCTION OF DRAINAGE FEEDER LINES CONNECTING TO BLUMENTRITT INTERSECTORS (ALIGNMENT ALONG MA. CLARA STREET), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱13.2M | 100% | Medium risk46 | —-0.085 |
| 172 | 20OF0172REHABILITATION OF DRAINAGE, CALAMBA ST., QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.089 |
| 173 | 25OF0177REHABILITATION OF ROAD AT VETERANS, BRGY. HOLY SPIRIT, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱9.7M | 0% | Medium risk46 | —-0.037 |
| 174 | 23OF0067REHABILITATION / IMPROVEMENT OF DRAINAGE SYSTEM, BARANGAY GULOD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.097 |
| 175 | 20OF0068IMPROVEMENT/ CONCRETING OF RADO STREET BRGY. FAIRVIEW, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.098 |