Opening the dossier…
Opening the dossier…
Contractor dossier
363 projects on file, including joint ventures this contractor is part of.
Total projects
363
Total budget
₱8B
Average progress
92.4%
Completion rate
85.1%
Average risk score
40.2
Medium risk on average, out of 100
Flagged as unusual
10
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| Region III | 93 | ₱3.3B | 37.8 | 4 | 99.1% |
| Region IV-B | 72 | ₱1.3B | 28.5 | 0 | 98.9% |
| Region XI | 8 | ₱275.9M | 50.9 | 1 | 94.2% |
| Region IV-A | 4 | ₱78.1M | 51.3 | 0 | 100.0% |
| Region I | 1 | ₱96.5M | 60.2 | 0 | 100.0% |
| Region X | 1 | ₱49.5M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 146 | ₱1.9B | 37.9 | 1 | 87.0% |
| Flood Control and Drainage | 86 | ₱3.6B | 42.5 | 1 | 97.2% |
| Roads | 86 | ₱1.9B | 40.4 | 0 | 95.0% |
| Water Provision and Storage | 24 | ₱30M | 18.2 | 0 | 100.0% |
| OTHER | 10 | ₱240.1M | 62.8 | 4 | 88.7% |
| GAA 2025 SSP | 7 | ₱34.5M | 78.7 | 2 | 97.9% |
| GAA 2025 OO-1 | 2 | ₱114.1M | 92.9 | 1 | 76.5% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 85.2 | 0 | 100.0% |
| Bridges | 1 | ₱35.2M | 47.6 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 25OD0129CONSTRUCTION OF VARIOUS ROADS AND DRAINAGE SYSTEMS ALONG BRGY. 133, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.6M | 100% | High risk89 | —-0.004 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 25CF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAANAN RIVER, LABI SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk85 | —-0.039 |
| 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 25OD0193CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | —-0.030 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 25OD0192CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), CIELITO ZAMORA, JR. HIGH SCHOOL, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.031 |
| 24CC0342CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 22CF0037: CONSTRUCTION OF MULTI-PURPOSE BUILDING, TABASACA CIS IRRIGATORS ASSOCIATION INC., BARANGAY BANTUG, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.074 |
| 25OD0260CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), REFORM 167 HOUSING, BRGY. 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | High risk69 | —-0.030 |
| 17DO0011MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-MARIKINA-INFANTA ROAD (SO1621LZ)-K0061+000-K0061+411 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.7M | 100% | High risk66 | —-0.070 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 21CC0010MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY & BANTAYAN ROAD IN SUPPORT OF ELECTRONIC MANUFACTURING, CHEMICALS, FURNITURE & GARMENTS & AGRI BUSINESS IND. IN BRGY. MALIS, PANGINAY, POBLACION, TABE & TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.042 |
| 15CC0331REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 21CF0184NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0095 + 400.00 - K0095+451.20 | Region III | Nueva Ecija 2nd DEO | Completed | ₱7M | 100% | High risk61 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 24OF0303CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 26% | Medium risk57 | Flagged0.024 |
| 16CF0224RESTORATION OF LABI BRIDGE APPROACH AND CHANNEL EXCAVATION ALONG DIGMALA RIVER, BONGABON, NUEVA ECIJA STA. 20+327.30, TO STA. 20+737.30, K0161+337 TO K0161+547.00, 210 L.M. | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk48 | Flagged0.009 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22OF0043REHABILITATION OF ROAD INCLUDING DRAINAGE, BARANGAY GREATER FAIRVIEW, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.098 |
| 177 | 22OF0011REHABILITATION OF ROAD INCLUDING DRAINAGE AT BRGY. GULOD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.098 |
| 178 | 22OF0032REHABILITATION OF ROAD INCLUDING DRAINAGE AT BARANGAY NOTH FAIRVIEW, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.098 |
| 179 | 22OF0012REHABILITATION OF ROAD INCLUDING DRAINAGE AT BRGY. GREATER LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.098 |
| 180 | 20OF0066CONSTRUCTION OF ROAD MALIBU STREET, BRGY. FAIRVIEW (000.000 TO 000.3500), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.098 |
| 181 | 18OF0013ROAD IMPROVEMENT OF SOLIVEN ST., BRGY. COMMONWEALTH, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱13.8M | 100% | Medium risk46 | —-0.099 |
| 182 | 18OF0077IMPROVEMENT/ CONCRETING ROAD BRGY. PHILAM, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱7.6M | 100% | Medium risk46 | —-0.100 |
| 183 | 25OD0067REHABILITATION OF ROAD AND DRAINAGE ALONG BARANGAY 1 AND BARANGAY 2 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.096 |
| 184 | 24OD0196REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, GEN SAN MIGUEL ST - K0011 + (-732) - K0011 + (-556) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱13.9M | 100% | Medium risk46 | —-0.098 |
| 185 | 23OF0175CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PHASE 4), BARANGAY SAN AGUSTIN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱19.1M | 100% | Medium risk45 | —-0.010 |
| 186 | 22ED0057CONSTRUCTION OF REGIONAL GOVERNMENT CENTER (RGC), CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱48.3M | 100% | Medium risk45 | —-0.080 |
| 187 | 24OD0292CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING, BAESA ELEMENTARY SCHOOL, BRGY. 161, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱19.7M | 84% | Medium risk45 | —-0.008 |
| 188 | 18OF0267CONST. OF FENCE, DRAINAGE SYSTEM & PAVEMENT AT HOLY SPIRIT NALT. H/S ANNEX, CONST. OF COVERED WALK WAY AND ELECT. SERVICE ENTRANCE POST AT PRES. CORAZON C. AQUINO E/S, COMPLETION OF FOUR (4) TWELVE (12) CLASSROOM S/B AT HOLY SPIRIT NALT. H/S, SAN AGUSTIN | National Capital Region | Quezon City 1st DEO | Completed | ₱11.9M | 100% | Medium risk43 | —-0.055 |
| 189 | 23OF0155CONSTRUCTION OF SCHOOL BUILDING, WEST FAIRVIEW HIGH SCHOOL, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱5M | 100% | Medium risk43 | —-0.010 |
| 190 | 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 191 | 22CF0045ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - NUEVA ECIJA - AURORA RD. K0126+000 - K0126+134, K0126+184 - K0126+190, K0126+241 - K0126+247 | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.6M | 100% | Medium risk43 | —-0.042 |
| 192 | 19ED0147REPAIR/REHABILITATION OF ALAG FLOOD CONTROL, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱44.8M | 100% | Medium risk43 | —-0.023 |
| 193 | 21CF0171OFF CARRIAGEWAY IMPROVEMENT- PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0101 + 314.00 - K0102 + 483.70 | Region III | Nueva Ecija 2nd DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.092 |
| 194 | 18ED0103CONSTRUCTION OF 1 UNIT 3 STOREY - 12 CLASSROOMS REG. WORKSHOP AT LEUTEBORO NHS, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱29.6M | 100% | Medium risk42 | —-0.042 |
| 195 | 20CF0086CONSTRUCTION OF HANGAR, ARMY AVIATION, FORT RAMON MAGSAYSAY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱63.1M | 100% | Medium risk41 | —-0.098 |
| 196 | 24CF0069ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - STA. ROSA - TARLAC RD - K0108 + (-881) - K0108 + (-803), K0111 + 100 - K0111 + 832, K0112 + 576.50 - K0113 + 082, K0116 + 000 - K0117 + 724 | Region III | Nueva Ecija 2nd DEO | Completed | ₱89.6M | 100% | Medium risk41 | —-0.093 |
| 197 | 22CB0098CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR SYSTEM, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱4.3M | 100% | Medium risk41 | —-0.041 |
| 198 | 22CB0095CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱3.2M | 100% | Medium risk40 | —-0.038 |
| 199 | 24ED0018CONSTRUCTION OF ABATON RIVER CONTROL, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.073 |
| 200 | 25ED0164CONSTRUCTION OF ABATON RIVER CONTROL AT CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.074 |