Opening the dossier…
Opening the dossier…
Contractor dossier
363 projects on file, including joint ventures this contractor is part of.
Total projects
363
Total budget
₱8B
Average progress
92.4%
Completion rate
85.1%
Average risk score
40.2
Medium risk on average, out of 100
Flagged as unusual
10
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| Region III | 93 | ₱3.3B | 37.8 | 4 | 99.1% |
| Region IV-B | 72 | ₱1.3B | 28.5 | 0 | 98.9% |
| Region XI | 8 | ₱275.9M | 50.9 | 1 | 94.2% |
| Region IV-A | 4 | ₱78.1M | 51.3 | 0 | 100.0% |
| Region I | 1 | ₱96.5M | 60.2 | 0 | 100.0% |
| Region X | 1 | ₱49.5M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 146 | ₱1.9B | 37.9 | 1 | 87.0% |
| Flood Control and Drainage | 86 | ₱3.6B | 42.5 | 1 | 97.2% |
| Roads | 86 | ₱1.9B | 40.4 | 0 | 95.0% |
| Water Provision and Storage | 24 | ₱30M | 18.2 | 0 | 100.0% |
| OTHER | 10 | ₱240.1M | 62.8 | 4 | 88.7% |
| GAA 2025 SSP | 7 | ₱34.5M | 78.7 | 2 | 97.9% |
| GAA 2025 OO-1 | 2 | ₱114.1M | 92.9 | 1 | 76.5% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 85.2 | 0 | 100.0% |
| Bridges | 1 | ₱35.2M | 47.6 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 25OD0129CONSTRUCTION OF VARIOUS ROADS AND DRAINAGE SYSTEMS ALONG BRGY. 133, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.6M | 100% | High risk89 | —-0.004 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 25CF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALAANAN RIVER, LABI SECTION, BONGABON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk85 | —-0.039 |
| 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 25OD0193CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | —-0.030 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 25OD0192CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), CIELITO ZAMORA, JR. HIGH SCHOOL, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | High risk76 | —-0.031 |
| 24CC0342CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 22CF0037: CONSTRUCTION OF MULTI-PURPOSE BUILDING, TABASACA CIS IRRIGATORS ASSOCIATION INC., BARANGAY BANTUG, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.074 |
| 25OD0260CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), REFORM 167 HOUSING, BRGY. 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱2.9M | 100% | High risk69 | —-0.030 |
| 17DO0011MFO1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-MARIKINA-INFANTA ROAD (SO1621LZ)-K0061+000-K0061+411 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.7M | 100% | High risk66 | —-0.070 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 21CC0010MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY & BANTAYAN ROAD IN SUPPORT OF ELECTRONIC MANUFACTURING, CHEMICALS, FURNITURE & GARMENTS & AGRI BUSINESS IND. IN BRGY. MALIS, PANGINAY, POBLACION, TABE & TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.042 |
| 15CC0331REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | High risk61 | —-0.012 |
| 21CF0184NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0095 + 400.00 - K0095+451.20 | Region III | Nueva Ecija 2nd DEO | Completed | ₱7M | 100% | High risk61 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00636DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITAL-ESCOLASTICA ROMERO DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 77% | High risk85 | Flagged0.040 |
| 24C00635DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, PAMPANGA PROVINCIAL HOSPITAL (MAIN), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱29.6M | 88% | High risk86 | Flagged0.037 |
| 24OE0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 184, ZONE 16, DISTRICT II, DAGUPAN EXT. GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱4.9M | 0% | Medium risk43 | Flagged0.029 |
| 24LA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) - PHASE 3, BARANGAY KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱73.5M | 69% | High risk76 | Flagged0.028 |
| 24OF0303CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 26% | Medium risk57 | Flagged0.024 |
| 16CF0224RESTORATION OF LABI BRIDGE APPROACH AND CHANNEL EXCAVATION ALONG DIGMALA RIVER, BONGABON, NUEVA ECIJA STA. 20+327.30, TO STA. 20+737.30, K0161+337 TO K0161+547.00, 210 L.M. | Region III | Nueva Ecija 2nd DEO | Completed | ₱35.2M | 100% | Medium risk48 | Flagged0.009 |
| 24OD0266CONSTRUCTION OF DRAINAGE STRUCTURE ALONG LANGARAY STREET LEADING TO PERIPHERAL CANAL, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48M | 54% | High risk63 | Flagged0.004 |
| 25OD0278CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, GRAND WALNUT GROVE, BARANGAY 167, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.9M | 92% | High risk75 | Flagged0.003 |
| 25CF0062ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - STA. ROSA - FORT MAGSAYSAY RD - K0 111+000 - K0 111+063.60, K0 111+424.60 - K0 112+000, K0 113+048 - K0 114+000, K0 115+000 - K0 116+000, K0 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱89.9M | 71% | High risk94 | Flagged0.002 |
| 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20ED0073CONSTRUCTION OF TWO - STOREY BUILDING (DPWH STANDARD DESIGN) OF MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE, MASIPIT, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱32.4M | 100% | Medium risk40 | —-0.083 |
| 202 | 20ED0135CONSTRUCTION OF EVACUATION CENTER IN BARANGAY GUINOBATAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱34.7M | 100% | Medium risk40 | —-0.081 |
| 203 | 17CF0129CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) NUEVA ECIJA 2ND DEO | Region III | Nueva Ecija 2nd DEO | Completed | ₱3.2M | 100% | Medium risk40 | —-0.042 |
| 204 | 18ED0038CONSTRUCTION OF DRAINAGE STRUCTURE ALONG CALAPAN NORTH ROAD K0019+511 - K0020+850 (B/S) AND K0008+023 - K0008+692 (L/S), STA. ROSA BACO AND STA. ISABEL CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱39.3M | 100% | Medium risk39 | —-0.091 |
| 205 | 23ED0028CONSTRUCTION OF MAG-ASAWANG TUBIG RIVER CONTROL STRUCTURE, STA. 0+000 - STA. 0+200, BRGY. TIGKAN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱33.8M | 100% | Medium risk39 | —-0.076 |
| 206 | 22ED0142CONCRETING OF VARIOUS DRAINAGE, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱43.1M | 100% | Medium risk39 | —-0.075 |
| 207 | 18ED0039CONSTRUCTION OF MAG - ASAWANG TUBIG RC STRUCTURE, DEL PILAR - NAUJAN TO BUCAYAO - CALAPAN CITY, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱23.4M | 100% | Medium risk39 | —-0.076 |
| 208 | 18CB0075FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION AT TALISAY RIVER, ALA-ULI SECTION, PILAR, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱23.5M | 100% | Medium risk39 | —-0.089 |
| 209 | 20ED0079CONSTRUCTION OF BUCAYAO RIVER CONTROL, BRGY. BUCAYAO, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱33.3M | 100% | Medium risk38 | —-0.076 |
| 210 | 22ED0139CONSTRUCTION/IMPROVEMENT/REHABILITATION/COMPLETION OF VARIOUS MULTI - PURPOSE BUILDINGS (COVERED COURT, BRGY. HALL, EVACUATION CENTER), BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱25.5M | 100% | Medium risk38 | —-0.084 |
| 211 | 23ED0112CONSTRUCTION OF MULTI-PURPOSE FACILITY (OMNHS MANGROVE & BIODIVERSITY AND ECO PARK), CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱19.8M | 100% | Medium risk38 | —-0.086 |
| 212 | 18ED0073CONSTRUCTION OF DRAINAGE STRUCTURE ALONG CALAPAN SOUTH ROAD K0059+857 - K0061+144, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱33.8M | 100% | Medium risk38 | —-0.094 |
| 213 | 18ED0121CONSTRUCTION OF 2 UNITS 2 STOREY - 6 CLASSROOMS AT ORIENTAL MINDORO NATIONAL HIGH SCHOOL, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱24.1M | 100% | Medium risk38 | —-0.044 |
| 214 | 18ED0112CONSTRUCTION OF 1 UNIT 2 STOREY ICT LAB, 2 STOREY SCI LAB AT SAN TEODORO NHS, SAN TEODORO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱17M | 100% | Medium risk38 | —-0.042 |
| 215 | 19CB0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALISAY RIVER (PTO. RIVAS SECTION) BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.089 |
| 216 | 18ED0113CONSTRUCTION OF 2 UNITS 2 STOREY ICT LAB, 2 STOREY SCI LAB AT INARAWAN NHS, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱17.6M | 100% | Medium risk38 | —-0.046 |
| 217 | 19CF0023ASSET PRESERVATION -PREVENTIVE MAINTENANCE - PRIMARY ROADS, STA. ROSA- TARLAC RD, K0113+837.00 - K0117+723.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱61.9M | 100% | Medium risk38 | —-0.100 |
| 218 | 18ED0157CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱19.1M | 100% | Medium risk38 | —-0.085 |
| 219 | 18ED0077CONSTRUCTION OF FLOOD CONTROL/DRAINAGE SYSTEM, MAG-ASAWANG TUBIG RIS, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱23.4M | 100% | Medium risk38 | —-0.076 |
| 220 | 19ED0054CONSTRUCTION OF FLOOD CONTROL/DRAINAGE SYSTEM, BUCAYAO CONCRETE REVETMENT ARMOURING BBRIS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱37.6M | 100% | Medium risk37 | —-0.076 |
| 221 | 18ED0033REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS CALAPAN NORTH ROAD K0009+000 - K0010+000, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱27.8M | 100% | Medium risk37 | —-0.093 |
| 222 | 23ED0027CONSTRUCTION OF ABATON FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+141.68, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱33.8M | 100% | Medium risk37 | —-0.075 |
| 223 | 18ED0060CONSTRUCTION OF PULA RIVER CONTROL STRUCTURE, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱23.5M | 100% | Medium risk37 | —-0.076 |
| 224 | 18ED0130CONSTRUCTION OF 2 UNITS 2 STOREY ICT LAB, 2 STOREY SCI LAB AT AURORA NHS, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱17.8M | 100% | Medium risk37 | —-0.045 |
| 225 | 18ED0108CONSTRUCTION OF 2 UNITS 2 STOREY ICT LAB, 2 STOREY SCI LAB AT NAUJAN MUNICIPAL HIGH SCHOOL, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱17.7M | 100% | Medium risk37 | —-0.046 |