Contractor dossier
68 projects on file, including joint ventures this contractor is part of.
Total projects
68
Total budget
₱2.4B
Average progress
94.8%
Completion rate
79.4%
Average risk score
48.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 66 | ₱2.3B | 48.2 | 0 | 94.9% |
| Region III | 2 | ₱82.4M | 50.3 | 0 | 93.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 27 | ₱928.1M | 48.8 | 0 | 93.5% |
| Flood Control and Drainage | 15 | ₱959.5M | 50.6 | 0 | 92.1% |
| Roads | 13 | ₱326.6M | 46.1 | 0 | 100.0% |
| Water Provision and Storage | 6 | ₱30.9M | 47.8 | 0 | 96.5% |
| Buildings and Facilities | 6 | ₱23M | 37.5 | 0 | 99.1% |
| GAA 2025 OO-2 | 1 | ₱93.6M | 93.4 | 0 | 68.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0034ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MANAGEMENT PROG-CONST/REHAB OF FLOOD MITIGATION FAC W/ IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PANSIPIT RIVER,LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 69% | High risk93 | —-0.016 |
| 24CD0043ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - NORZAGARAY BIGTE RD K0072+572 K0073+000, K0076+000 K0076+520 | Region III | Bulacan 2nd DEO | Completed | ₱44.4M | 100% | High risk69 | —-0.068 |
| 25DB0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 39% | High risk65 | —-0.026 |
| 22D00015FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk65 | —-0.074 |
| 23DB0016FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA. 0 + 000 - STA. 0 + 536 (UPSTREAM L/S) AT BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.077 |
| 23DD0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE, IBAAN, | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.054 |
| 23DD0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE WITH ROA | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.054 |
| 23DB0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - WAWA BR. 2 (B04377LZ) ALONG TERNATE-NASUGBU RD | Region IV-A | Batangas 1st DEO | Completed | ₱92.6M | 100% | High risk62 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DB0034ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MANAGEMENT PROG-CONST/REHAB OF FLOOD MITIGATION FAC W/ IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PANSIPIT RIVER,LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 69% | High risk93 | —-0.016 |
| 2 | 24CD0043ASSET PRESERVATION PROGRAM REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS - NORZAGARAY BIGTE RD K0072+572 K0073+000, K0076+000 K0076+520 | Region III | Bulacan 2nd DEO | Completed | ₱44.4M | 100% | High risk69 | —-0.068 |
| 3 | 25DB0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 39% | High risk65 | —-0.026 |
| 4 | 22D00015FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk65 | —-0.074 |
| 5 | 23DB0016FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA. 0 + 000 - STA. 0 + 536 (UPSTREAM L/S) AT BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.077 |
| 6 | 23DD0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE, IBAAN, | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.054 |
| 7 | 23DD0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE WITH ROA | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.054 |
| 8 | 23DB0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - WAWA BR. 2 (B04377LZ) ALONG TERNATE-NASUGBU RD | Region IV-A | Batangas 1st DEO | Completed | ₱92.6M | 100% | High risk62 | —-0.051 |
| 9 | 24DB0148ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-BINAMBANG BR. (B03048LZ) ALONG BALAYAN-BALIBAGO RD | Region IV-A | Batangas 1st DEO | On-Going | ₱70.4M | 96% | Medium risk54 | —-0.026 |
| 10 | 19DB0014BRIDGE-WIDENING OF PERMANENT BRIDGES-BINAMBANG BR. (B03048LZ) ALONG BALAYAN-BALIBAGO RD. - K0107+008.40 | Region IV-A | Batangas 1st DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.059 |
| 11 | 23DD0070ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIVE | Region IV-A | Batangas 4th DEO | Completed | ₱76.2M | 100% | Medium risk53 | —-0.083 |
| 12 | 24DB0028ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+173.60 - STA.1+492.40 (UPSTREAM R/S) AT BALAYAN,BATA | Region IV-A | Batangas 1st DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.074 |
| 13 | 24DB0026ORG OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA.0+854.80-STA.1+173.60(UPSTREAM R/S) AT BALAYAN,BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.076 |
| 14 | 24DB0029ORG OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROG-CONST/ MAINTOF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+390.80 - STA.1+709.60 (UPSTREAM L/S)AT BALAYAN,BATS | Region IV-A | Batangas 1st DEO | On-Going | ₱86.4M | 94% | Medium risk52 | —-0.031 |
| 15 | 24DB0027ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+072.00 - STA.1+390.80 (UPSTREAM L/S) AT BALAYAN,BAT | Region IV-A | Batangas 1st DEO | On-Going | ₱84.2M | 97% | Medium risk52 | —-0.035 |
| 16 | 24DB0025ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROGM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA. 0+536 -STA.0+854.80 (UPSTREAM R/S) AT BALAYAN, BATS | Region IV-A | Batangas 1st DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.076 |
| 17 | 23DB0017FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA. 0 + 000 - STA. 0 + 536 (UPSTREAM R/S) AT BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.082 |
| 18 | 22DD0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, IMPROVEMENT OF CAPACITY OF PROVINCIAL BRIDGES ALONG PROVINCIAL ROADS (PROVINCIAL BRIDGES FOR ECONOMIC DEVELOPMENT - PROBRED), CONSTRUCTION OF CATANDALA BRIDGE, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.066 |
| 19 | 24DB0017ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-TANGGOY BRIDGE 2 ALONG BALAYAN-BALIBAGO ROAD | Region IV-A | Batangas 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.062 |
| 20 | 20DD0221LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. MASAYA, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.105 |
| 21 | 22DD0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MPB IN BRGY. SICO 2, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk49 | —-0.104 |
| 22 | 24DB0024ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CALACA BRIDGE,CALACA RIVER,CITY OF CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱49.1M | 100% | Medium risk49 | —-0.085 |
| 23 | 25DB0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM IN BARANGAY 5, CITY OF CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 100% | Medium risk49 | —-0.042 |
| 24 | 22DD0340OPENING AND CONCRETING OF BRGY. BAGONG POOK FMR, BRGY. BAGONG POOK, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱14.5M | 100% | Medium risk49 | —-0.057 |
| 25 | 23DB0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) - CONSTRUCTION OF WATER SYSTEM BARANGAY UTOD, NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.071 |