Contractor dossier
68 projects on file, including joint ventures this contractor is part of.
Total projects
68
Total budget
₱2.2B
Average progress
90.4%
Completion rate
75.0%
Average risk score
55.6
Medium risk on average, out of 100
Flagged as unusual
4
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 66 | ₱2.2B | 57.0 | 4 | 90.1% |
| Region III | 2 | ₱3.3M | 9.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 30 | ₱408.3M | 51.2 | 0 | 93.8% |
| Flood Control and Drainage | 16 | ₱861.8M | 55.1 | 0 | 99.1% |
| Roads | 13 | ₱610.8M | 58.4 | 1 | 69.3% |
| OTHER | 5 | ₱165.1M | 77.7 | 3 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱191.1M | 92.9 | 0 | 73.0% |
| Water Provision and Storage | 1 | ₱1.4M | 18.2 | 0 | 100.0% |
| Bridges | 1 | ₱1.9M | 11.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0066ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY MALAGASANG I-B, IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 61% | High risk93 | —-0.015 |
| 25DF0035ORGANIZATIONAL OUTCOME 2 :PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS CONST OF REVETMENT ALONG JULIAN RIVER PHASE 1, BRGY. ANABU I-B IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 85% | High risk93 | —-0.022 |
| 20DF0201CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE AT MEDICION IIC, IMUS AND CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE AT BUHAY NA TUBIG, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk83 | Flagged0.005 |
| 20DF0202CONSTRUCTION OF BRIDGE AT ANABU 1G, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱29M | 100% | High risk83 | Flagged0.007 |
| 20DF0198CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT GREEN MARK, MALAGASANG II B, IMUS; REPAIR/REHAB/COMPLETION OF MULTI-PURPOSED BUILDING (COVERED COURT) AT GREENGATE MALAGASANG II B, IMUS; REPAIR/REHAB/COMPLETION OF MULTI | Region IV-A | Cavite 1st DEO | Completed | ₱12.5M | 100% | High risk82 | Flagged0.003 |
| 25DF0065ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY ANABU I-D, IMUS, CAV | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 86% | High risk79 | —-0.019 |
| 24DF0185ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG ILANG-ILANG RIVER BRGY.ALAPAN SEC PHASE IV | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 100% | High risk78 | —-0.018 |
| 20DF0103LOCAL PROGRAM CONST./REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION/REPAIR/ REHABILITATION/ROAD WIDENING OF DON PLACIDO CAMPOS AVE., BRGY. MALAGASANG, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱95.8M | 100% | High risk73 | —-0.029 |
| 25DF0206CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI PURPOSE BLDG. AT GREEN GATE HOMES PHASE 2, BRGY, MALAGASANG, CITY OF IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.7M | 90% | High risk73 | —-0.041 |
| 24DF0259CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT MALAGASANG, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | High risk73 | —-0.074 |
| 25DF0145CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI PURPOSE BLDG. AT ANABU 1G, CITY OF IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.6M | 90% | High risk72 | —-0.041 |
| 24DF0069CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TANZANG LUMA I, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | High risk72 | —-0.074 |
| 25DF0183CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PASONG KAWAYAN II, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱14.4M | 0% | High risk72 | —-0.008 |
| 23DF0203CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIESCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. PASONG BUAYA, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱57.9M | 100% | High risk72 | —-0.007 |
| 24DF0260CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. MALAGASANG 1G, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.8M | 100% | High risk71 | —-0.074 |
| 24DF0218CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIESREHAB OF MALAGASANG-BUCANDALA-ALAPAN RD | Region IV-A | Cavite 1st DEO | On-Going | ₱48.5M | 31% | High risk70 | —-0.018 |
| 25DF0137CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF ROAD ALONG JULIAN RIVER, | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk70 | —-0.020 |
| 25DF0116CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF RD CONNECTING TO NAVARRO BRIDGE, IMUS | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 29% | High risk70 | —-0.028 |
| 25DF0025ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONST OF REVETMENT ALONG ILANG-ILANG RIVER BRGY. TAPIA | Region IV-A | Cavite 1st DEO | Completed | ₱19.4M | 100% | High risk68 | —-0.059 |
| 20DF0068LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, LA TERRAZA PHASE 2, BRGY. BUHAY NA TUBIG, IMUS CITY; CONSTRUCTION OF MULTI-PURPOSE BUILDING, TANZANG LUMA ELEMENTA | Region IV-A | Cavite 1st DEO | Completed | ₱13.4M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0202CONSTRUCTION OF BRIDGE AT ANABU 1G, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱29M | 100% | High risk83 | Flagged0.007 |
| 20DF0201CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE AT MEDICION IIC, IMUS AND CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE AT BUHAY NA TUBIG, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk83 | Flagged0.005 |
| 25DF0146CONCRETING OF BRGY. BANCOD FMR, BRGY. BANCOD, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱9.6M | 100% | High risk62 | Flagged0.004 |
| 20DF0198CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT GREEN MARK, MALAGASANG II B, IMUS; REPAIR/REHAB/COMPLETION OF MULTI-PURPOSED BUILDING (COVERED COURT) AT GREENGATE MALAGASANG II B, IMUS; REPAIR/REHAB/COMPLETION OF MULTI | Region IV-A | Cavite 1st DEO | Completed | ₱12.5M | 100% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18DF0043ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIESWITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,BRGY. | Region IV-A | Cavite 1st DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.087 |
| 52 | 20DF0097ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.087 |
| 53 | 21DF0195ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCESECONDARY ROADSCAVITE - BATANGAS RD - K0021+385 - K0021+781 | Region IV-A | Cavite 1st DEO | Completed | ₱20.8M | 100% | Medium risk46 | —-0.104 |
| 54 | 19DF0126CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT MALAGASANG I ELEMENTARY SCHOOL, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱26.5M | 100% | Medium risk46 | —-0.052 |
| 55 | 20DF0011ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.089 |
| 56 | 20DF0193CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT ALAPAN II ELEMENTARY SCHOOL, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱25M | 100% | Medium risk46 | —-0.054 |
| 57 | 19DF0103ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, B | Region IV-A | Cavite 1st DEO | Completed | ₱18.2M | 100% | Medium risk46 | —-0.089 |
| 58 | 21DF0066ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG SAN JUAN RI | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.087 |
| 59 | 21DF0150ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSMANILA-CAVITE (NCR BDRY-JCT CAVITE CITY SECT) - K0021 + 546 - K0021 + 605, K0021 + 691 - K0021 + 744, K0021 + 779 | Region IV-A | Cavite 1st DEO | On-Going | ₱13.7M | 0% | Medium risk46 | —-0.013 |
| 60 | 20DF0153LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS - CONSTRUCTION OF MISSING GAPS/ROAD AT MALAGASANG BUCANDALA ALAPAN ROAD, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.108 |
| 61 | 19DF0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, M. GREGORIO ROAD, K0035+329 - K0035+720, CAVITE CITY | Region IV-A | Cavite 1st DEO | Completed | ₱11.7M | 100% | Medium risk46 | —-0.106 |
| 62 | 23DF0148CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY BUCANDALA I, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱2.9M | 100% | Low risk26 | —-0.103 |
| 63 | 23DF0051CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY MEDICION I-D, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱2M | 100% | Low risk25 | —-0.103 |
| 64 | 22DF0067CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY MALAGASANG II-A, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱2M | 100% | Low risk25 | —-0.103 |
| 65 | 22DF0183CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIESCONSTRUCTION (COMPLETION) OF DRAINAGE AT BARANGAY MEDICION II-C TO KAW | Region IV-A | Cavite 1st DEO | Completed | ₱1.9M | 100% | Low risk18 | —-0.081 |
| 66 | 19DF0074LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, WATER MANAGEMENT FACILITIES, WATER SUPPLY - CONSTRUCTION OF WATER SUPPLY, BRGY. MUZON I (DREAMLAND) I, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱1.4M | 100% | Low risk18 | —-0.068 |
| 67 | 18CG0326REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES MUSON BR. (B01460LZ) ALONG APALIT - MACABEBE - MASANTOL RD., MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱1.9M | 100% | Low risk11 | —-0.063 |
| 68 | 18CG0059LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF BULAC MULTI-PURPOSE BUILDING, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱1.4M | 100% | Low risk7 | —-0.103 |