Opening the dossier…
Opening the dossier…
Contractor dossier
61 projects on file, including joint ventures this contractor is part of.
Total projects
61
Total budget
₱6.2B
Average progress
76.9%
Completion rate
47.5%
Below 70%
Average risk score
65.8
High risk on average, out of 100
Flagged as unusual
3
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 52 | ₱4.8B | 66.6 | 1 | 77.4% |
| National Capital Region | 7 | ₱1.3B | 63.9 | 2 | 76.4% |
| Region VII | 2 | ₱97M | 50.8 | 0 | 65.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 32 | ₱3B | 66.2 | 0 | 81.9% |
| Roads | 20 | ₱1.9B | 66.7 | 0 | 82.9% |
| Buildings and Facilities | 8 | ₱1.4B | 65.6 | 3 | 39.0% |
| Water Provision and Storage | 1 | ₱3.3M | 34.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22F00008OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG YAWA RIVER, LEGAZPI CITY, ALBAY, LEGAZPI CITY, ALB | Region V | Region V | On-Going | ₱139.7M | 79% | High risk73 | —-0.015 |
| 23FB0227BIP - BASIC INFRASTRUCTURE PROGRAM/FACILITIES TO SUPPORT SOCIAL SERVICES REHABILITATION OF MULTI-PURPOSE FACILITY, OLD ALBAY DISTRICT, LEGASPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.8M | 41% | High risk73 | —-0.023 |
| 25FB0108CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE, BARANGAY MALOBAGO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 5% | High risk72 | —-0.019 |
| 25FB0117CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTINGMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE, BARANGAY SUA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 8% | High risk72 | —-0.020 |
| 25FB0026OO2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF DIKE ALONG SALUGAN RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 90% | High risk72 | —-0.047 |
| 25FB0039SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIKE, BARANGAY QUIRANGAY, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 48% | High risk72 | —-0.031 |
| 25FB0042CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BULDINGS/FACILITIES CONSTRUCTION OF DIKE, UPSTREAM, BARANGAY TAYSAN, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 20% | High risk72 | —-0.024 |
| 25FB0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY KILICAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.2M | 52% | High risk72 | —-0.032 |
| 23FK0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. BANUANG GURANG, DONSOL | Region V | Sorsogon DEO | On-Going | ₱142.8M | 100% | High risk72 | —-0.046 |
| 23F00401CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BLDG. (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERENCES FOR EDUCATION | Region V | Region V | On-Going | ₱96.3M | 52% | High risk72 | —-0.025 |
| 25FB0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY BONGA, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 73% | High risk72 | —-0.012 |
| 25FB0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE ALONG MANUMBALAY RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 48% | High risk71 | —-0.031 |
| 25FB0009OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BALASBAS RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 72% | High risk71 | —-0.038 |
| 22F00002OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL AT BASUD, BACACAY, ALBAY, BACACAY, ALBAY 1ST LEGISLATIVE | Region V | Region V | Completed | ₱138.4M | 100% | High risk71 | —-0.066 |
| 22FO0103CONSTRUCTION OF REVETMENT ALONG SAN FRANCISCO RIVER, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | Completed | ₱99M | 100% | High risk71 | —-0.074 |
| 23FB0153BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD MITIGATION STRUCTURE,BRGY. SALUGAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.076 |
| 24FB0197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALVACION-MIISI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 32% | High risk70 | —-0.043 |
| 23FB0156BIP: CONSTRUCTION OF ROAD, BRGY. 63-MARIAWA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱94.1M | 22% | High risk70 | —-0.030 |
| 24FG0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 3, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱144.8M | 100% | High risk70 | —-0.065 |
| 25FB0021SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, PUROK 3, BARIIS, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱93M | 20% | High risk70 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 24O00211COMPLETION OF STRUCTURAL AND ARCHITECTURAL WORK OF RIZAL HALL, UP-MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱97.3M | 35% | High risk63 | Flagged0.021 |
| 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22F00008OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG YAWA RIVER, LEGAZPI CITY, ALBAY, LEGAZPI CITY, ALB | Region V | Region V | On-Going | ₱139.7M | 79% | High risk73 | —-0.015 |
| 2 | 23FB0227BIP - BASIC INFRASTRUCTURE PROGRAM/FACILITIES TO SUPPORT SOCIAL SERVICES REHABILITATION OF MULTI-PURPOSE FACILITY, OLD ALBAY DISTRICT, LEGASPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.8M | 41% | High risk73 | —-0.023 |
| 3 | 25FB0108CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE, BARANGAY MALOBAGO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 5% | High risk72 | —-0.019 |
| 4 | 25FB0117CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTINGMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE, BARANGAY SUA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 8% | High risk72 | —-0.020 |
| 5 | 25FB0026OO2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF DIKE ALONG SALUGAN RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 90% | High risk72 | —-0.047 |
| 6 | 25FB0039SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIKE, BARANGAY QUIRANGAY, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 48% | High risk72 | —-0.031 |
| 7 | 25FB0042CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BULDINGS/FACILITIES CONSTRUCTION OF DIKE, UPSTREAM, BARANGAY TAYSAN, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 20% | High risk72 | —-0.024 |
| 8 | 25FB0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY KILICAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.2M | 52% | High risk72 | —-0.032 |
| 9 | 23FK0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. BANUANG GURANG, DONSOL | Region V | Sorsogon DEO | On-Going | ₱142.8M | 100% | High risk72 | —-0.046 |
| 10 | 23F00401CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BLDG. (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERENCES FOR EDUCATION | Region V | Region V | On-Going | ₱96.3M | 52% | High risk72 | —-0.025 |
| 11 | 25FB0035SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DIKE, PHASE 2, BARANGAY BONGA, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 73% | High risk72 | —-0.012 |
| 12 | 25FB0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE ALONG MANUMBALAY RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 48% | High risk71 | —-0.031 |
| 13 | 25FB0009OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BALASBAS RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 72% | High risk71 | —-0.038 |
| 14 | 22F00002OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL AT BASUD, BACACAY, ALBAY, BACACAY, ALBAY 1ST LEGISLATIVE | Region V | Region V | Completed | ₱138.4M | 100% | High risk71 | —-0.066 |
| 15 | 22FO0103CONSTRUCTION OF REVETMENT ALONG SAN FRANCISCO RIVER, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | Completed | ₱99M | 100% | High risk71 | —-0.074 |
| 16 | 23FB0153BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD MITIGATION STRUCTURE,BRGY. SALUGAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱98.9M | 100% | High risk71 | —-0.076 |
| 17 | 24FB0197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALVACION-MIISI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 32% | High risk70 | —-0.043 |
| 18 | 23FB0156BIP: CONSTRUCTION OF ROAD, BRGY. 63-MARIAWA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱94.1M | 22% | High risk70 | —-0.030 |
| 19 | 24FG0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 3, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱144.8M | 100% | High risk70 | —-0.065 |
| 20 | 25FB0021SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, PUROK 3, BARIIS, LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱93M | 20% | High risk70 | —-0.043 |
| 21 | 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 22 | 24FG0076CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 4, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱144.8M | 100% | High risk69 | —-0.065 |
| 23 | 24FB0132SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BONGA-SAN JOSE, NAGOTGOT, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱92.6M | 75% | High risk69 | —-0.054 |
| 24 | 24FB0077SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CAWALOG-BARIIS ROAD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 89% | High risk68 | —-0.056 |
| 25 | 22FO0102CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG CABANGAN RIVER (UPSTREAM RIGHT SIDE OF CABANGAN BRIDGE) BASUD POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱96M | 100% | High risk68 | —-0.076 |