Opening the dossier…
Opening the dossier…
Contractor dossier
192 projects on file, including joint ventures this contractor is part of.
Total projects
192
Total budget
₱2B
Average progress
99.3%
Completion rate
97.4%
Average risk score
35.3
Medium risk on average, out of 100
Flagged as unusual
10
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 170 | ₱1.8B | 37.7 | 9 | 99.2% |
| Region XII | 22 | ₱149.1M | 17.0 | 1 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 107 | ₱702M | 28.8 | 0 | 99.8% |
| Roads | 61 | ₱774.7M | 35.5 | 0 | 100.0% |
| OTHER | 15 | ₱112.1M | 64.8 | 8 | 98.2% |
| Flood Control and Drainage | 4 | ₱318.2M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱14.8M | 92.4 | 2 | 93.3% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 86.2 | 0 | 32.0% |
| Bridges | 1 | ₱11.2M | 45.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.9M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 25HB0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SABO DAM, MALINAO IS, LUMBAY, PILAR, BOHOL STA.0+000.00 | Region VII | Bohol 3rd DEO | On-Going | ₱14.7M | 32% | High risk86 | —-0.001 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 19HB0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN - ANDA - BADIANG COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL STA.0+520 - STA.1+172.95 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk62 | —-0.030 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
| 24HB0008ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08 | Region VII | Bohol 3rd DEO | Completed | ₱139.4M | 100% | High risk61 | —-0.057 |
| 20HB0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX, BRGY. VILLAFLOR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 2 | 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 3 | 25HB0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SABO DAM, MALINAO IS, LUMBAY, PILAR, BOHOL STA.0+000.00 | Region VII | Bohol 3rd DEO | On-Going | ₱14.7M | 32% | High risk86 | —-0.001 |
| 4 | 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 5 | 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 6 | 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 7 | 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 8 | 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 9 | 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 10 | 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 11 | 19HB0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN - ANDA - BADIANG COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL STA.0+520 - STA.1+172.95 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk62 | —-0.030 |
| 12 | 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
| 13 | 24HB0008ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08 | Region VII | Bohol 3rd DEO | Completed | ₱139.4M | 100% | High risk61 | —-0.057 |
| 14 | 20HB0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX, BRGY. VILLAFLOR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk61 | —-0.030 |
| 15 | 18HB0208CONCRETING OF ROAD LEADING TO TOURISM PORT, PANAS, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.2M | 100% | Medium risk60 | —-0.030 |
| 16 | 18HB0211CONCRETING OF BOX CULVERT LEADING TO CAN-UMANTAD FALLS, BRGY. CADAPDAPAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.2M | 100% | Medium risk60 | —-0.030 |
| 17 | 20HB0017CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CORBADA-INAHAGAN-CABAHIS-LA HACIENDA (ALICIA) LEADING TO BIRHEN SA NATURE RESORT AND CAGONGCAGONG, BRGY. LA HACIENDA, ALICIA, BOHOL, STA. 1+570 - STA. 1+970 | Region VII | Bohol 3rd DEO | Completed | ₱9.3M | 100% | Medium risk60 | —-0.031 |
| 18 | 20HB0152LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS AT BRGY. BUENOS AIRES, (STA. 0+070.00 - STA. 0+282.78, STA. 0+523.57 - STA. 0+577.63), CARMEN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk58 | —-0.033 |
| 19 | 23HB0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES REHABILITATION OF MULTI-PURPOSE BUILDING, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱61.7M | 100% | Medium risk52 | —-0.084 |
| 20 | 22HB0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS- JCT. (TER)-JAGNA-SIERRA BULLONES RD - K0069 + 661 - K | Region VII | Bohol 3rd DEO | Completed | ₱58.8M | 100% | Medium risk51 | —-0.088 |
| 21 | 23HB0042ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS REHABILITATION OF MANABA RIVER CONTROL (UPST | Region VII | Bohol 3rd DEO | Completed | ₱86.8M | 100% | Medium risk51 | —-0.067 |
| 22 | 22HB0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONSTRUCTION OF SLOPE PROTECTION ALONG JCT. (TER) GUIDULMAN - ANDA - BADIANG - | Region VII | Bohol 3rd DEO | Completed | ₱77.2M | 100% | Medium risk50 | —-0.071 |
| 23 | 21HB0195LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD PROTECTION ALONG JCT. (TER) GUINDULMAN - ANDA - BADIANG - COGTONG ROAD, ANDA, BOHOL STA. 20+4 | Region VII | Bohol 3rd DEO | Completed | ₱53.8M | 100% | Medium risk50 | —-0.090 |
| 24 | 22HB0149CONCRETING OF BRGY. WEST LUNGSODAAN FMR, BRGY. WEST LUNGSODAAN, GARCIA HERNANDEZ, BOHOL SECTION 1: STA. 2+360.00 - STA. 2+895.20; SECTION 2: STA. 2+949.70 - STA. 3+006.10; SECTION 3: STA. 3+859.10 - STA. 3+890.00 | Region VII | Bohol 3rd DEO | Completed | ₱11.8M | 100% | Medium risk50 | —-0.010 |
| 25 | 24HB0016OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LOAY INTERIOR ROAD-K0167+337 - K0168+839 | Region VII | Bohol 3rd DEO | Completed | ₱48.8M | 100% | Medium risk49 | —-0.091 |