Contractor dossier
192 projects on file, including joint ventures this contractor is part of.
Total projects
192
Total budget
₱2B
Average progress
99.3%
Completion rate
97.4%
Average risk score
35.3
Medium risk on average, out of 100
Flagged as unusual
10
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 170 | ₱1.8B | 37.7 | 9 | 99.2% |
| Region XII | 22 | ₱149.1M | 17.0 | 1 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 107 | ₱702M | 28.8 | 0 | 99.8% |
| Roads | 61 | ₱774.7M | 35.5 | 0 | 100.0% |
| OTHER | 15 | ₱112.1M | 64.8 | 8 | 98.2% |
| Flood Control and Drainage | 4 | ₱318.2M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱14.8M | 92.4 | 2 | 93.3% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 86.2 | 0 | 32.0% |
| Bridges | 1 | ₱11.2M | 45.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.9M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 25HB0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SABO DAM, MALINAO IS, LUMBAY, PILAR, BOHOL STA.0+000.00 | Region VII | Bohol 3rd DEO | On-Going | ₱14.7M | 32% | High risk86 | —-0.001 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 19HB0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN - ANDA - BADIANG COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL STA.0+520 - STA.1+172.95 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk62 | —-0.030 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
| 24HB0008ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08 | Region VII | Bohol 3rd DEO | Completed | ₱139.4M | 100% | High risk61 | —-0.057 |
| 20HB0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX, BRGY. VILLAFLOR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19HB0194LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TAMBONGAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.094 |
| 102 | 19HB0187LOCAL INFRASTRUCTURE PROGRAM BUILDING AND OTHER STRUCTURES MULTIPURPOSE / FACILITIES CONSTRUCTION OF COGTONG AQUA MARINE RESOURCE PARK BLDG., BRGY. COGTONG, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk40 | —-0.093 |
| 103 | 24HB0152CONCRETING OF SITIO BIL-ISAN TAMPE, BRGY. POBLACION FMR. BRGY. POBLACION, SEVILLA, BOHOL STA. 0+000.00 - STA. 0+220.00; STA. 0+275.40 - STA. 0+600.91 | Region VII | Bohol 3rd DEO | Completed | ₱9.9M | 100% | Medium risk39 | —-0.041 |
| 104 | 18HB0184CONSTRUCTION OF MULTI-PURPOSE BUILDING , BOYOAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.093 |
| 105 | 18HB0125CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY ANOLING, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.093 |
| 106 | 23HB0130CONCRETING OF BRGY. GUADALUPE FMR, BRGY. GUADALUPE, CARMEN, BOHOL STA.0+000.00-STA.0+610.63 | Region VII | Bohol 3rd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.041 |
| 107 | 24HB0163CONSTRUCTION OF 2STY4CL, CANDULAO ES, GARCIA HERNANDEZ, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.7M | 100% | Medium risk39 | —-0.047 |
| 108 | 19HB0227CONCRETING OF BRGY. ABACA FMR, MABINI, BOHOL STA. 0+000 - STA. 0+113.00; STA. 0+140.00 - STA. 0+747.50 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | Medium risk39 | —-0.039 |
| 109 | 23HB0128CONCRETING OF BRGY. KATIPUNAN FMR, BRGY. KATIPUNAN, ALICIA, BOHOL STA.0+000.00-STA.0+640.00 | Region VII | Bohol 3rd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.041 |
| 110 | 19HB0224CONCRETING OF BRGY. BUYOG, JAGNA-BRGY. ABIJILAN, GARCIA HERNANDEZ FMR, BRGY. BUYOG, JAGNA AND BRGY. ABIJILAN, GARCIA HERNANDEZ, BOHOL STA. 0+000.00 STA. 1+000.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.1M | 100% | Medium risk39 | —-0.040 |
| 111 | 19HB0228CONCRETING OF BRGY. BUGSOC-SAN ISIDRO-LA UNION-SAN JUAN FARM TO MARKET ROAD, BRGY. BUGSOC-SAN ISIDRO-LA UNION, SIERRA BULLONES, BOHOL STA. 0+000.00 - STA. 0+491.24; STA. 0+ 698.24 - STA. 1+014.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.1M | 100% | Medium risk39 | —-0.041 |
| 112 | 23HB0131CONCRETING OF BRGY. LARAPAN FMR, BRGY. LARAPAN, JAGNA, BOHOL STA.0+000.00-STA.0+250.00 | Region VII | Bohol 3rd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.038 |
| 113 | 18HB0117CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANADTARAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.093 |
| 114 | 18HB0114CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CANAWA, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk39 | —-0.093 |
| 115 | 24HB0154CONCRETING OF BRGY. TUBOD FMR, BRGY. TUBOD, CANDIJAY, BOHOL STA. 0+474.00 - STA. 0+646.00 | Region VII | Bohol 3rd DEO | Completed | ₱5M | 100% | Medium risk39 | —-0.037 |
| 116 | 19HB0230CONCRETING OF PUROK 1-7, BRGY. CANLANGIT FARM TO MARKET ROAD, BRGY. CANLANGIT, SIERRA BULLONES, BOHOL STA. 0+000.00 - STA. 0+440.00 | Region VII | Bohol 3rd DEO | Completed | ₱5.7M | 100% | Medium risk39 | —-0.042 |
| 117 | 18HB0123CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY TAWID, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk38 | —-0.093 |
| 118 | 18HB0118CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY CAN-OLIN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.093 |
| 119 | 18HB0111CONSTRUCTION OF MULTI-PURPOSE BUILDING LA UNION, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.093 |
| 120 | 18HB0183CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. SAN ISIDRO, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.093 |
| 121 | 18HB0115CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ABIHILAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk37 | —-0.093 |
| 122 | 18HB0124CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY PANAS, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk36 | —-0.092 |
| 123 | 18HB0113CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY PAGAHAT, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Medium risk34 | —-0.093 |
| 124 | 21MB0104ROAD CONCRETING WITH DRAINAGE AT PUROK BALUNTO, BRGY. LABANGAL, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱7.9M | 100% | Low risk26 | —-0.084 |
| 125 | 22ME0017REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DIGOS-MAKAR ROAD (S00200MN) - K1592+(-322) - K1592+(-188.05), MALUNGON GAMAY; MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱8.6M | 100% | Low risk26 | —-0.086 |