Contractor dossier
192 projects on file, including joint ventures this contractor is part of.
Total projects
192
Total budget
₱2B
Average progress
99.3%
Completion rate
97.4%
Average risk score
35.3
Medium risk on average, out of 100
Flagged as unusual
10
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 170 | ₱1.8B | 37.7 | 9 | 99.2% |
| Region XII | 22 | ₱149.1M | 17.0 | 1 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 107 | ₱702M | 28.8 | 0 | 99.8% |
| Roads | 61 | ₱774.7M | 35.5 | 0 | 100.0% |
| OTHER | 15 | ₱112.1M | 64.8 | 8 | 98.2% |
| Flood Control and Drainage | 4 | ₱318.2M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱14.8M | 92.4 | 2 | 93.3% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 86.2 | 0 | 32.0% |
| Bridges | 1 | ₱11.2M | 45.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.9M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 25HB0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SABO DAM, MALINAO IS, LUMBAY, PILAR, BOHOL STA.0+000.00 | Region VII | Bohol 3rd DEO | On-Going | ₱14.7M | 32% | High risk86 | —-0.001 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 19HB0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN - ANDA - BADIANG COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL STA.0+520 - STA.1+172.95 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk62 | —-0.030 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
| 24HB0008ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08 | Region VII | Bohol 3rd DEO | Completed | ₱139.4M | 100% | High risk61 | —-0.057 |
| 20HB0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX, BRGY. VILLAFLOR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20HB0005ASSET PRESERVATION PROGRAM - PRESERVATION MAINTENANCE- TERTIARY ROADS-ASPHALT OVERLAY - BALILIHAN- HANOPOL - BATUAN ROAD KO 049 + 005 - KO 049 + 205, BATUAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.6M | 100% | Low risk21 | —-0.093 |
| 127 | 20HB0131LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES - LOCAL ROADS CONCRETING OF ROADS AT BRGY. SUBAYON, BILAR, BOHOL STA. 0+000.00 -STA. 0+300.00 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk21 | —-0.097 |
| 128 | 20HB0155LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONCRETING OF ROADS FROM PUROK 3 TO PUROK 7, BRGY. SALVADOR, SIERRA BULLONES, BOHOL (STA 0+200.00 - STA. 0+636.43). (SECTION 1: STA. 0+200.00 - STA. 0+457.43 CONCRETE PAV | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.096 |
| 129 | 23HB0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM) JCT. (DIMIAO-BILAR) OAC-OMJON ROAD IN SUPPORT OF THE | Region VII | Bohol 3rd DEO | Completed | ₱3.4M | 100% | Low risk20 | —-0.092 |
| 130 | 23HB0016CONVERGENCE & SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM) JCT. (TER) DIMIAO-OAC-BILAR JCT. (LIR) IN SUPPORT OF | Region VII | Bohol 3rd DEO | Completed | ₱3.4M | 100% | Low risk20 | —-0.093 |
| 131 | 20HB0109LOCAL PROGRAM - LOCAL INFRA PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS AT BRGY. VILLAFUERTE, CARMEN, BOHOL, STA. 0+150.00 - STA. 0+420.00 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.098 |
| 132 | 21HB0031LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS, BRGY. ALEMANIA TO ANONANG, VALENCIA, DIMIAO, BOHOL, STA. 0+355.00 - STA. 0+491.00 | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.095 |
| 133 | 18HB0148CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROADS, PUROK 1,2 & 6, BRGY MAHANGIN, CANDIJAY, BOHOL,STA. 0+000-STA.0+207.71-SECTION 1,STA. 0+315.89-STA.0+423.00-SECTION 2, STA. 0+569.47-ST | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk20 | —-0.094 |
| 134 | 18HB0205CONCRETING OF ROAD SITIO ILAYA, POBLACION, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk20 | —-0.090 |
| 135 | 18HB0202CONCRETING OF DRIVEWAY LEADING TO CANDIJAY EVACUATION CENTER, POBLACION, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk20 | —-0.090 |
| 136 | 18HB0209CONCRETING OF ROAD, SITIO CUTAN, BOYOAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk20 | —-0.090 |
| 137 | 23HB0020CONVERGENCE & SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP) CABUNGAAN-LONOY ROAD LEADING TO KINAHUGAN FALLS & LONOY SPRING, BRGY. CABUNGAAN, JAGNA, B | Region VII | Bohol 3rd DEO | Completed | ₱3.4M | 100% | Low risk20 | —-0.090 |
| 138 | 22MB0046CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LIGAYA ELEMENTARY SCHOOL, BARANGAY LIGAYA, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk20 | —-0.081 |
| 139 | 22ME0003CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9.9M | 100% | Low risk19 | —-0.077 |
| 140 | 20HB0015LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES, CONSTRUCTION OF CAHAYAG MULTIPURPOSE BUILDING, BRGY. CAHAYAG, SIERRA BULLONES, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk19 | —-0.094 |
| 141 | 22MB0101CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY HALL COMPOUND, BRGY. LAGAO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk18 | —-0.081 |
| 142 | 19MB0074CONSTRUCTION OF MPB (BRGY. HEALTH CENTER) PUROK BULAONG PHASE 2, BRGY. LABANGAL, GEN. SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk18 | —-0.080 |
| 143 | 23MB0145CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SALUDIN ANAS ELEMENTARY SCHOOL, BRGY. LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk18 | —-0.081 |
| 144 | 19HB0150LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE / FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ALEGRIA SUR, LOAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk18 | —-0.094 |
| 145 | 21HA0064CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. CANSIBUAN, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱2.8M | 100% | Low risk18 | —-0.095 |
| 146 | 18MB0169CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL BUILDINGS 2 STY 8CL, TAMPAKAN NHS, TAMPAKAN, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱18.1M | 100% | Low risk17 | —-0.037 |
| 147 | 24MB0100CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING IN LOZANO HIGH SCHOOL, BARANGAY SINAWAL, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk17 | —-0.039 |
| 148 | 19HB0212LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, SHOULDERING OF BARANGAY GON-OB ROAD, GON-OB, LOBOC, BOHOL SECTION 1- STA.0+000-STA.0+114.85 WITH EXEMPTION, STA.0+089.77-STA.0+100.00; SECTION 2- STA.0+000.00-STA.0+402.00 WITH EXEMPTION, | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.095 |
| 149 | 18HB0198CONSTRUCTION OF MULTI-PURPOSE BUILDING, CADAPDAPAN, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk16 | —-0.093 |
| 150 | 18HB0196CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANHAWAY, GUINDULMAN, BOHOL, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk16 | —-0.093 |