Contractor dossier
192 projects on file, including joint ventures this contractor is part of.
Total projects
192
Total budget
₱2B
Average progress
99.3%
Completion rate
97.4%
Average risk score
35.3
Medium risk on average, out of 100
Flagged as unusual
10
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 170 | ₱1.8B | 37.7 | 9 | 99.2% |
| Region XII | 22 | ₱149.1M | 17.0 | 1 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 107 | ₱702M | 28.8 | 0 | 99.8% |
| Roads | 61 | ₱774.7M | 35.5 | 0 | 100.0% |
| OTHER | 15 | ₱112.1M | 64.8 | 8 | 98.2% |
| Flood Control and Drainage | 4 | ₱318.2M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱14.8M | 92.4 | 2 | 93.3% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 86.2 | 0 | 32.0% |
| Bridges | 1 | ₱11.2M | 45.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.9M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 25HB0063ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SABO DAM, MALINAO IS, LUMBAY, PILAR, BOHOL STA.0+000.00 | Region VII | Bohol 3rd DEO | On-Going | ₱14.7M | 32% | High risk86 | —-0.001 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 19HB0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN - ANDA - BADIANG COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL STA.0+520 - STA.1+172.95 | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk62 | —-0.030 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
| 24HB0008ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08 | Region VII | Bohol 3rd DEO | Completed | ₱139.4M | 100% | High risk61 | —-0.057 |
| 20HB0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX, BRGY. VILLAFLOR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HB0148CONSTRUCTION OF SCHOOL BUILDING, BILAR NATIONAL HIGH SCHOOL, BRGY. YANAYA, BILAR, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.5M | 72% | High risk62 | Flagged0.052 |
| 25MB0020CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱9.9M | 96% | High risk92 | Flagged0.018 |
| 18HB0158CONCRETING OF SITIO LAZONES, BRGY. ALEGRIA-BRGY. CANDASAG FMR, BRGY. ALEGRIA AND BRGY. CANDASAG , LOBOC, BOHOL, STA. 0+000.00 - STA. 0+097.17 (SECTION 1), STA. 0+000.00 - STA. 0+345.95 (SECTION 2) | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk68 | Flagged0.013 |
| 25HB0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | On-Going | ₱4.9M | 91% | High risk92 | Flagged0.012 |
| 19HB0225CONCRETING OF BRGY. JAMBAWAN FMR, BRGY. JAMBAWAN, LILA, BOHOL, STA. 0+000.00 - STA. 0+415.37, STA. 0+512.30 - STA. 0+800.00 | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk75 | Flagged0.012 |
| 20HB0168CONCRETING OF BRGY. CAYACAY, ALICIA FMR (LEADING TO BRGY. ABACA, MABINI) BRGY. CAYACAY, ALICIA, BOHOL STA.1+460.00 - STA.1+578.02, STA.1+940.00 -STA.2 +460.00, BRGY. CAYACAY, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱12.5M | 100% | High risk79 | Flagged0.012 |
| 19HB0216CONCRETING OF BRGY. LA HACIENDA PROPER - BRGY. INAHANGAN FMR, BRGY. LA HACIENDA, ALICIA, BOHOL STA. 0+000.00 - STA.0+200; STA. 0+220.00 - STA. 0+383.00 | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | High risk79 | Flagged0.011 |
| 19HB0209CONCRETING OF BRGY. EWON FMR, BRGY. EWON, SEVILLA, BOHOL STA. 0+143.60 - STA. 0+251.59, STA. 0+300- STA.0+462.50 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk78 | Flagged0.011 |
| 19HB0223CONCRETING OF BRGY. LONOY FARM TO MARKET ROAD, BRGY. LONOY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+193.70 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk63 | Flagged0.010 |
| 19HB0220CONCRETING OF BARANGAY CALABACITA FMR, BRGY. CALABACITA, JAGNA, BOHOL SECTION 1: STA. 0+000 - 0 + 016.46 SECTION 2: STA. 0+020 - 0+330.54 | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | High risk61 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18HB0197CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BASDIO, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk16 | —-0.093 |
| 152 | 19HB0153LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF SITIO OLONG ANINO TO SITIO ILAYA, BARANGAY LICOLICO, SEVILLA, BOHOL STA. 0+000.00 -STA. 0+150.00 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.095 |
| 153 | 19MB0147CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS 2 STY 4CL, IRINEO SANTIAGO ES, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱10.1M | 100% | Low risk16 | —-0.037 |
| 154 | 18HB0199CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABAJAN, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.7M | 100% | Low risk16 | —-0.093 |
| 155 | 21HB0124LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONST. OF MULTI-PURPOSE BUILDING , SEVILLA CENTRAL ELEM. SCHOOL, POBLACION, SEVILLA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk16 | —-0.094 |
| 156 | 18MB0140CONSTRUCTION AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS 3STY 6CL, GENERAL SANTOS CITY NATIONAL HIGH SCHOOL (MAIN), GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱13.3M | 100% | Low risk16 | —-0.037 |
| 157 | 18MB0141CONSTRUCTION AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS 3STY 6CL, GENERAL SANTOS CITY NATIONAL HIGH SCHOOL (MAIN), GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱13.3M | 100% | Low risk16 | —-0.037 |
| 158 | 19HB0161LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BRGY. NUEVA FUERZA RD., CARMEN, BOHOL STA. 0+414.50 -STA. 0+610.00 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.096 |
| 159 | 19HB0158LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BRGY. NUEVA FUERZA ROAD, CARMEN, BOHOL STA. 0+000 -STA. 0+189.50 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.096 |
| 160 | 19HB0154LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BARANGAY ROAD, MAYUGA, GUINDULMAN, BOHOL STA. 0+000 - STA. 0+138 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.094 |
| 161 | 20MB0125CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL BUILDING, 2 STY 4 CL AT DOLE CANNERY CES, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱13.3M | 100% | Low risk16 | —-0.039 |
| 162 | 23HB0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱3.9M | 100% | Low risk16 | —-0.093 |
| 163 | 21HB0008LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTI-PURPOSE/FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING AT DANICOP, SIERRA BULLONES BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱3.9M | 100% | Low risk16 | —-0.094 |
| 164 | 21HB0092LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAUG, LILA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱3.5M | 100% | Low risk16 | —-0.094 |
| 165 | 20HB0090LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES- MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANTAGAY, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk16 | —-0.092 |
| 166 | 21HB0149LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. EL SALVADOR, CARMEN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4M | 100% | Low risk16 | —-0.093 |
| 167 | 18HB0200CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAYUGA, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.5M | 100% | Low risk16 | —-0.093 |
| 168 | 19HB0156LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF STA. CRUZ-ANIBONGAN ROAD, SIERRA BULLONES, BOHOL STA. 0+000 - STA. 0+157.30; STA. 0+238.18 - STA. 242.68 | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.095 |
| 169 | 19HB0151LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE /FACILITIES CONSTRUCTION OF COVERED COURT, BRGY. CANSIWANG, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk16 | —-0.093 |
| 170 | 18HB0195CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABUNOK, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4M | 100% | Low risk16 | —-0.093 |
| 171 | 21HB0103LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACULITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, ECO-TOURISM SITE, BARANGAY LUNDAG, ANDA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.9M | 100% | Low risk15 | —-0.092 |
| 172 | 18HB0136CONSTRUCTION OF MULTI-PURPOSE BUILDING, CENTRAL ELEMENTARY SCHOOL, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.6M | 100% | Low risk15 | —-0.093 |
| 173 | 19HB0163CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS BUILDING AND OTHER STRUCTURES MULTIPURPOSE / FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANGDAN, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.4M | 100% | Low risk15 | —-0.093 |
| 174 | 21HB0114LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), BRGY. POBLACION, SIERRA BULLONES, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱2.1M | 100% | Low risk15 | —-0.093 |
| 175 | 19HB0148LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE / FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN CANDIJAY NATIONAL HIGH SCHOOL, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱1.9M | 100% | Low risk14 | —-0.093 |