Opening the dossier…
Opening the dossier…
Contractor dossier
290 projects on file, including joint ventures this contractor is part of.
Total projects
290
Total budget
₱28.6B
Average progress
90.4%
Completion rate
68.6%
Below 70%
Average risk score
62.4
High risk on average, out of 100
Flagged as unusual
24
8.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 238 | ₱24.3B | 63.8 | 22 | 88.7% |
| Region IV-A | 48 | ₱3.9B | 56.4 | 1 | 100.0% |
| Region IV-B | 2 | ₱426.6M | 65.6 | 1 | 54.5% |
| National Capital Region | 2 | ₱73.7M | 48.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 152 | ₱15.6B | 61.0 | 1 | 94.3% |
| Flood Control and Drainage | 85 | ₱8.1B | 58.9 | 5 | 93.4% |
| Bridges | 16 | ₱1.4B | 62.6 | 3 | 74.8% |
| OTHER | 13 | ₱1.7B | 80.2 | 6 | 83.8% |
| Buildings and Facilities | 10 | ₱448.2M | 57.2 | 2 | 89.0% |
| GAA 2025 OO-1 | 5 | ₱556.8M | 95.1 | 4 | 50.3% |
| GAA 2025 OO-2 | 5 | ₱528.3M | 93.5 | 2 | 59.3% |
| Water Provision and Storage | 2 | ₱14.7M | 51.8 | 0 | 92.4% |
| GAA 2025 SSP | 1 | ₱48.5M | 95.6 | 1 | 12.8% |
| Bridges, Roads | 1 | ₱146.8M | 73.1 | 0 | 11.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FE0020OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MILAOR-PILI BYPASS ROAD, ALIMBUYOG BRIDGE, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱94.6M | 54% | High risk96 | Flagged0.011 |
| 25FE0021CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PASACAO SIGNATURE PARK, BRGY. STA ROSA DELA NORTE, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱48.5M | 13% | High risk96 | Flagged0.023 |
| 25F00223ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 18, CAMARINES SUR, MINALABAC, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.1M | 9% | High risk96 | Flagged0.041 |
| 25F00375ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY (BULA-BALATAN SECTION), CAMARINES SUR, BALATAN, CAMARINES SUR (5TH LEGISLAT | Region V | Region V | On-Going | ₱120.6M | 85% | High risk95 | Flagged0.002 |
| 25F00262ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/ NEW ROADS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY LEADING TO PASACAO PORT TO WHITE SAND BEACHES, CAMARINES SUR 2ND LD, PACKA | Region V | Region V | On-Going | ₱120M | 16% | High risk95 | Flagged0.024 |
| 25FN0002OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DOWNSTREAM OF SAN ROQUE MADAWON SPILLWAY, BRGY. SAN ROQUE MADAWON, NABUA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱93.6M | 95% | High risk94 | —-0.016 |
| 25FE0015OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CUT-OFF CHANNEL, BICOL RIVER, BARANGAY FLORDELIZ, MILAOR, CAMARIN | Region V | Camarines Sur 2nd DEO | On-Going | ₱95.5M | 51% | High risk94 | —-0.006 |
| 25FN0020OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PAWILI RIVER, BARANGAY CAUSIP, BULA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱149.6M | 60% | High risk94 | Flagged0.003 |
| 25FN0037OO2:PROTECTLIVESANDPROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE UPSTREAM OF MAMPUAG BRIDGE,BRGY. SANTIAGO YOUNG,NABUA,CAM.SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱93.1M | 69% | High risk94 | —-0.009 |
| 25FE0019OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - NAGA-JCT. MAGARAO-CANAMAN-LIBMANAN JCT. PPH ROAD (SKYBRIDGE), PACKAGE 1, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱31.4M | 88% | High risk93 | —-0.009 |
| 25FN0036OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BICOL RIVER FLOOD MITIGATION STRUCTURE, BRGY. STA. EULALIA, BAAO, CAM. SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱96.5M | 22% | High risk93 | Flagged0.002 |
| 24FN0060CLUSTER III: REPAIR/REHABILITATION & CONSTRUCTION OF FARM-TO-MARKET ROADS (BATO CAMARINES SUR & NABUA CAMARINES SUR) | Region V | Camarines Sur 5th DEO | On-Going | ₱104.5M | 100% | High risk91 | Flagged0.047 |
| 24F00128ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 20, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.1M | 50% | High risk83 | Flagged0.027 |
| 24F00051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-NAGA-JCT. MAGARAO-CANAMAN-LIBMANAN JCT. PPH ROAD (SKYBRIDGE), PACKAGE 1, CAMARINES SUR, LIBMANAN, CAMARINES SUR | Region V | Region V | On-Going | ₱147.3M | 29% | High risk83 | Flagged0.030 |
| 17DD0193DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0119+760 - K0121+635; K0121+635 - K0122 + 236; K0125 + 500 - K0126 +774 | Region IV-A | Batangas 4th DEO | Completed | ₱97M | 100% | High risk83 | Flagged0.021 |
| 17F00045MFO3-MAINTENANCE & CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS,GUINOBATAN-JOVELLAR-DONSOL ROAD LEADING TO PILAR PORT, INCLUDING ROW AND BRIDGE, ALBAY 3RD LD | Region V | Region V | Completed | ₱143.7M | 100% | High risk82 | —-0.008 |
| 22F00040CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, PACKAGE 2, PASACAO, CAMARI | Region V | Region V | Completed | ₱115.8M | 100% | High risk82 | —-0.011 |
| 24F00013CLUSTER XIII-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-XIII-I: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIG | Region V | Region V | On-Going | ₱204.5M | 65% | High risk82 | Flagged0.028 |
| 25FE0003CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE D | Region V | Camarines Sur 2nd DEO | On-Going | ₱115.2M | 86% | High risk82 | —-0.001 |
| 24F00001CLUSTER I-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-I-I-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY POBLACIO | Region V | Region V | On-Going | ₱283.1M | 59% | High risk81 | Flagged0.035 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00147RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: BOX CULVERT AND SLOPE PROTECTION, PARARAO, BALATAN, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱83M | 99% | High risk72 | Flagged0.058 |
| 18F00141REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT, STA. LUCIA-SAN ANTONIO SECTION, NABUA, CAMARINES SUR | Region V | Region V | On-Going | ₱176.4M | 100% | High risk78 | Flagged0.053 |
| 24FN0060CLUSTER III: REPAIR/REHABILITATION & CONSTRUCTION OF FARM-TO-MARKET ROADS (BATO CAMARINES SUR & NABUA CAMARINES SUR) | Region V | Camarines Sur 5th DEO | On-Going | ₱104.5M | 100% | High risk91 | Flagged0.047 |
| 19F00134CONSTRUCTION OF EVACUATION CENTERS INCLUDING SITE DEVELOPMENT IN REGION V, SALVACION, BAAO, CAMARINES SUR | Region V | Region V | On-Going | ₱34.7M | 0% | Medium risk57 | Flagged0.046 |
| 16F00150RECONSTRUCTION/REHABILITATION/RESTORATION OF FISH PORT AND STAIRS AT LAKE BUHI, BUHI, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱80.6M | 98% | Medium risk56 | Flagged0.043 |
| 25F00223ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 18, CAMARINES SUR, MINALABAC, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.1M | 9% | High risk96 | Flagged0.041 |
| 25F00180ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SIPOCOT BR. (B00380LZ) ALONG MAHARLIKA HIGHWAY, SIPOCOT, CAMARINES SUR (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.3M | 0% | High risk73 | Flagged0.036 |
| 24F00001CLUSTER I-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-I-I-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY POBLACIO | Region V | Region V | On-Going | ₱283.1M | 59% | High risk81 | Flagged0.035 |
| 25F00222ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR EXPRESSWAY PACKAGE 17, CAMARINES SUR, MINALABAC, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.1M | 11% | High risk70 | Flagged0.034 |
| 25FH0060CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCT | Region V | Catanduanes DEO | On-Going | ₱235.3M | 0% | High risk69 | Flagged0.031 |
| 24F00051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-NAGA-JCT. MAGARAO-CANAMAN-LIBMANAN JCT. PPH ROAD (SKYBRIDGE), PACKAGE 1, CAMARINES SUR, LIBMANAN, CAMARINES SUR | Region V | Region V | On-Going | ₱147.3M | 29% | High risk83 | Flagged0.030 |
| 24F00013CLUSTER XIII-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-XIII-I: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIG | Region V | Region V | On-Going | ₱204.5M | 65% | High risk82 | Flagged0.028 |
| 24F00128ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 20, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱190.1M | 50% | High risk83 | Flagged0.027 |
| 25F00262ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/ NEW ROADS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY LEADING TO PASACAO PORT TO WHITE SAND BEACHES, CAMARINES SUR 2ND LD, PACKA | Region V | Region V | On-Going | ₱120M | 16% | High risk95 | Flagged0.024 |
| 25FE0021CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PASACAO SIGNATURE PARK, BRGY. STA ROSA DELA NORTE, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱48.5M | 13% | High risk96 | Flagged0.023 |
| 23E00123SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG CARATAO RIVER, BULALACAO, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱209.5M | 9% | High risk66 | Flagged0.022 |
| 17DD0193DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0119+760 - K0121+635; K0121+635 - K0122 + 236; K0125 + 500 - K0126 +774 | Region IV-A | Batangas 4th DEO | Completed | ₱97M | 100% | High risk83 | Flagged0.021 |
| 25FE0020OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MILAOR-PILI BYPASS ROAD, ALIMBUYOG BRIDGE, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱94.6M | 54% | High risk96 | Flagged0.011 |
| 23FD0071CLUSTER 6: REHABILITATION OF BRIDGES, ALONG DAANG MAHARLIKA, ROLANDO ANDAYA HIGHWAY, SIPOCOT-CABUSAO ROAD, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱141.5M | 0% | High risk70 | Flagged0.009 |
| 25FN0020OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PAWILI RIVER, BARANGAY CAUSIP, BULA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱149.6M | 60% | High risk94 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23FN0089CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY SAN JOSE SALAY, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.051 |
| 152 | 24FD0011REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, ROLANDO A ANDAYA HIGHWAY, K0324+472 - K0325+000, K0325+562 - K0326+000, ROLANDO A ANDAYA HIGHWAY | Region V | Camarines Sur 1st DEO | Completed | ₱89.6M | 100% | High risk62 | —-0.088 |
| 153 | 23F00086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CATANDUANES CIR RD-K0013+000.00-K0013+100.00, K0013+450.00-K0013+580.00, CATANDUA | Region V | Region V | On-Going | ₱97.8M | 100% | High risk62 | —-0.052 |
| 154 | 24FE0021OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIKE (ALONG BICOL RIVER) WITHIN BICOL RIVER BASIN, BARANGAY DEL CARMEN - DEL ROSARIO, MINALABAC, C | Region V | Camarines Sur 2nd DEO | Completed | ₱133.2M | 100% | High risk62 | —-0.068 |
| 155 | 21F00037CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), IMELDA BOULEVARD, VIRAC, CATANDUANES,PACKAGE I, VIRAC, CATANDUANES (LONE DISTRICT) | Region V | Region V | Completed | ₱101.3M | 100% | High risk62 | —-0.087 |
| 156 | 22F00067OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-BARAS-GIGMOTO-VIGA RD.-K0031+603-K0031+627, K0046+676-K0046+700, K0049+491-K0049+ | Region V | Region V | Completed | ₱101.3M | 100% | High risk62 | —-0.086 |
| 157 | 23FE0072CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CUT-OFF CHANNEL (DOWNSTREAM), BRGY. BORONGBORONGAN, MILAOR, CAMAR | Region V | Camarines Sur 2nd DEO | Completed | ₱120.6M | 100% | High risk61 | —-0.071 |
| 158 | 23FE0064CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CUT-OFF CHANNEL (DOWNSTREAM) PHASE II, BRGY. SAN JUAN-SAN LORENZO | Region V | Camarines Sur 2nd DEO | Completed | ₱120.6M | 100% | High risk61 | —-0.071 |
| 159 | 18DB0088NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS ALONG PALICO-BALAYAN-BATANGAS RD - K0099+711-K0100+553, K0103+262-K0104+713 | Region IV-A | Batangas 1st DEO | Completed | ₱93.8M | 100% | High risk61 | —-0.095 |
| 160 | 21FG0007CONSTRUCTION OF MISSING/NEW ROAD, MANAGNAG (TIGAON-GOA-SAN JOSE-LAGONOY-GUIAJLO VIA SAN VICENTE ROAD)STA.3+800.00 - STA.6+300.00HIMANAG ROAD, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱91.7M | 100% | High risk61 | —-0.082 |
| 161 | 19DB0008NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS,PALICO-BALAYAN-BATANGAS RD-K0104+713-K0104+857,K0106+328.3-K0106+343.3,K0106+508-K0106+828,K0114+468-K0114+820,K0115+645-K0115+956,K0118+500-K0118+580,K0118+640-K0119+160,K0123+044.5-K0123+062.7 | Region IV-A | Batangas 1st DEO | Completed | ₱93.3M | 100% | High risk61 | —-0.093 |
| 162 | 23FN0031CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CAMANGAHAN-PARARAO SUBURBAN ROAD, BALATAN, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱77.2M | 100% | High risk61 | —-0.095 |
| 163 | 18FD0089REHABILITATION AND UPGRADING OF BUSAK-BAHAY BYPASS ROAD WITH DRAINAGE AND SLOPE PROTECTION, LIBMANAN, CAMARINES SUR | Region V | Region V | Completed | ₱47.3M | 100% | High risk60 | —-0.005 |
| 164 | 24FD0008INSTALLATION OF SOLAR STREET LIGHTS ALONG ROLANDO A ANDAYA HIGHWAY - K0286+000 - K0286+760, K0288+525 - K0292+554, K0293+000 - K0293+792, DEL GALLEGO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱76.6M | 100% | High risk60 | —-0.093 |
| 165 | 25DB0001ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0124 + 200 - K0124 + 612, K0124 + 632 - K0125 + 650 | Region IV-A | Batangas 1st DEO | Completed | ₱116.2M | 100% | High risk60 | —-0.088 |
| 166 | 25FD0027INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS, ROADWAY LIGHTING) ALONG ROLANDO R. ANDAYA HIGHWAY - K0297+560 - K0326+000, RAGAY, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱56.1M | 98% | High risk60 | —-0.071 |
| 167 | 17FD0036CONSTRUCTION OF BRIDGE, BARANGAY LOOB, GAINZA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱46.5M | 100% | Medium risk60 | —-0.035 |
| 168 | 17FD0037CONSTRUCTION OF BRIDGE, BARANGAY SAMPALOC, GAINZA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱46.5M | 100% | Medium risk60 | —-0.035 |
| 169 | 23DB0065ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECONDARY ROADS TAGAYTAY-NASUGBU RD - K0072 + (-240) - K072 + 000, K0076 + 730 - K0077 + 160 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 170 | 25DB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS - TERNATE-NASUGBU RD - K0083 + 800 - K0086 + 000, K0090 + 500 - K0091 + 100 | Region IV-A | Batangas 1st DEO | Completed | ₱107.9M | 100% | Medium risk60 | —-0.087 |
| 171 | 23DB0066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECONDARY ROADS TAGAYTAY-NAGSUGBU RD - K0079 + 000 - K0079 + 670 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 172 | 23DB0082ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGAYTAY-NAGSUGBU RD - K0092 + 000 - K0093 + 670 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.091 |
| 173 | 23DB0081ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGAYTAY-NAGSUGBU RD - K0089 + 000 - K0090 + 670 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.091 |
| 174 | 23DB0073ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECONDARY ROADS TAGAYTAY-NAGSUGBU RD - K0082 + 000 - K0082 + 670 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.093 |
| 175 | 21F00076LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECT, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF LICTIN-PALAWIG-PALTA BY-PASS ROAD, SAN ANDRES, CATANDUANES, SAN ANDRES, CATANDUANES (CATA | Region V | Region V | On-Going | ₱83.6M | 95% | Medium risk59 | —-0.031 |