Contractor dossier
126 projects on file, including joint ventures this contractor is part of.
Total projects
126
Total budget
₱6.5B
Average progress
89.9%
Completion rate
74.6%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
11
8.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 76 | ₱3.8B | 50.3 | 5 | 91.5% |
| Region IV-A | 42 | ₱1.8B | 51.4 | 5 | 86.8% |
| Region III | 8 | ₱821M | 59.5 | 1 | 90.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 57 | ₱2.2B | 46.6 | 5 | 89.9% |
| Flood Control and Drainage | 50 | ₱3B | 53.8 | 1 | 91.4% |
| Buildings and Facilities | 8 | ₱414.2M | 53.8 | 2 | 71.5% |
| OTHER | 5 | ₱459M | 69.3 | 3 | 92.2% |
| Roads | 5 | ₱260.8M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱59.9M | 93.6 | 0 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0218RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - C.P. GARCIA BR. (B01875LZ) ALONG C-5 ROAD | National Capital Region | Metro Manila 1st DEO | On-Going | ₱59.9M | 96% | High risk94 | —-0.018 |
| 23D00219REPLACEMENT OF PERMANENT WEAK BRIDGES BANTILAN BR. (B02946LZ) ALONG SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD | Region IV-A | Region IV-A | On-Going | ₱62.7M | 79% | High risk87 | Flagged0.048 |
| 25CD0186REPLACEMENT OF MARCOS BRIDGE (PHASE III), MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱140.4M | 30% | High risk75 | Flagged0.020 |
| 23DF0197ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD FLOOD MANAGEMENT PROGRAM CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST OF PUMPING STATION INCLUDING DRAINAGE SYSTEM ALONG IMUS R | Region IV-A | Cavite 1st DEO | On-Going | ₱48.5M | 10% | High risk72 | Flagged0.012 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 25DN0038CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAYTAY RIVER, BARANGAY SAN ISIDRO, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱47M | 30% | High risk71 | —-0.011 |
| 25CD0134CONSTRUCTION OF PINAGTULAYAN BRIDGE (PHASE II), NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱56.2M | 96% | High risk70 | —-0.015 |
| 25DF0138CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BYPASS ROAD (AGUINALDO HI | Region IV-A | Cavite 1st DEO | On-Going | ₱93.5M | 0% | High risk69 | Flagged0.019 |
| 24OH0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-CONSTRUCTION OF LOADING AND UNLOADING BAY AT ROXAS BOULEVARD CORNER EDSA, PASAY CITY PHASE II | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 82% | High risk68 | Flagged0.006 |
| 25OE0178CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱141.1M | 49% | High risk68 | —-0.027 |
| 25OE0061CONSTRUCTION OF RETARDING BASIN AT ESTERO DE MAGDALENA, PHASE I, TONDO, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱141.8M | 83% | High risk67 | —-0.034 |
| 24D00018CONSTRUCTION OF BY-PASS AND DIVERSION ROADSBACOOR DIVERSION ROAD, PACKAGE A, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.1M | 78% | High risk67 | —-0.005 |
| 23D00134CONSTRUCTION OF MALAGASANG FLYOVER, IMUS CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱149.6M | 70% | High risk67 | Flagged0.002 |
| 24OE0012CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXII), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.062 |
| 25OE0188REHABILITATION OF DRAINAGE SYSTEM ALONG DAPITAN ST. MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.7M | 28% | High risk65 | —-0.031 |
| 23OE0199CONSTRUCTION OF RETENTION BASIN AT ESTERO DELA REINA (PHASE XV), TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱94.8M | 100% | High risk65 | —-0.066 |
| 18OE0106ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF VALENCIA PUMPING STATION RETARDING BASIN, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.069 |
| 22D00091CONSTRUCTION OF MALAGASANG FLYOVER AT MALAGASANG SEGMENT 1, IMUS CITY | Region IV-A | Region IV-A | Completed | ₱119.2M | 100% | High risk65 | —-0.049 |
| 25OE0053REHABILITATION OF DRAINAGE ALONG ZONE 58 - 67, MANILA CITY (PHASE V) | National Capital Region | North Manila DEO | On-Going | ₱103.9M | 43% | High risk64 | —-0.035 |
| 24OE0028REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - LEGARDA FLY - OVER (B03350LZ) ALONG LEGARDA FLYOVER | National Capital Region | North Manila DEO | Completed | ₱115M | 100% | High risk64 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 23D00219REPLACEMENT OF PERMANENT WEAK BRIDGES BANTILAN BR. (B02946LZ) ALONG SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD | Region IV-A | Region IV-A | On-Going | ₱62.7M | 79% | High risk87 | Flagged0.048 |
| 22OG0140COMPLETION OF PROPOSED CONSTRUCTION OF THE UNIVERSITY OF THE PHILIPPINES DILIMAN SWIMMING POOL AND STADIUM, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱62.8M | 0% | Medium risk56 | Flagged0.033 |
| 21OG0149PROPOSED CONSTRUCTION OF THE UNIVERSITY OF THE PHILIPPINES DILIMAN SWIMMING POOL AND STADIUM, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱84.5M | 25% | Medium risk56 | Flagged0.031 |
| 25CD0186REPLACEMENT OF MARCOS BRIDGE (PHASE III), MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱140.4M | 30% | High risk75 | Flagged0.020 |
| 25DF0138CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BYPASS ROAD (AGUINALDO HI | Region IV-A | Cavite 1st DEO | On-Going | ₱93.5M | 0% | High risk69 | Flagged0.019 |
| 23DF0197ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD FLOOD MANAGEMENT PROGRAM CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST OF PUMPING STATION INCLUDING DRAINAGE SYSTEM ALONG IMUS R | Region IV-A | Cavite 1st DEO | On-Going | ₱48.5M | 10% | High risk72 | Flagged0.012 |
| 24OH0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-CONSTRUCTION OF LOADING AND UNLOADING BAY AT ROXAS BOULEVARD CORNER EDSA, PASAY CITY PHASE II | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 82% | High risk68 | Flagged0.006 |
| 24OE0027REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - DIMASALANG BR. (B01820LZ) ALONG DIMASALANG ST | National Capital Region | North Manila DEO | On-Going | ₱66M | 0% | Medium risk55 | Flagged0.003 |
| 23D00134CONSTRUCTION OF MALAGASANG FLYOVER, IMUS CITY, CAVITE | Region IV-A | Region IV-A | On-Going | ₱149.6M | 70% | High risk67 | Flagged0.002 |
| 24D00099FY 2024 DPWH INFRASTRUCTURE PROGRAM -ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - CALAMBA OVERPASS (B03132LZ) ALONG MANILA SOUTH ROAD | Region IV-A | Region IV-A | On-Going | ₱41.2M | 46% | Medium risk58 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24OB0079RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - C. P. GARCIA BR. (B01875LZ) ALONG C-5 ROAD | National Capital Region | Metro Manila 1st DEO | Completed | ₱38.4M | 100% | Medium risk48 | —-0.064 |
| 77 | 23OH0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF WALKWAY BRIDGE/HANGING BRIDGE OVER PASIG RIVER PHASE 3 AT STA. | National Capital Region | South Manila DEO | Completed | ₱29.1M | 100% | Medium risk48 | —-0.065 |
| 78 | 17OB0171IMPROVEMENT OF DRAINAGE SYSTEM ALONG COL. VER AND VICINITY BRGY. KABAYANAN, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱13.9M | 100% | Medium risk48 | —-0.064 |
| 79 | 24OI0025RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - PULANG LUPA BR. (B01814LZ) ALONG QUIRINO AVENUE, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱23.3M | 100% | Medium risk47 | —-0.028 |
| 80 | 17OB0200REHABILITATION/IMPROVEMENT OF DRAINAGE SYSTEM ALONG CLUB FILIPINO STREET, BRGY. GREENHILLS, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.2M | 100% | Medium risk47 | —-0.065 |
| 81 | 18OI0150WIDENING/RETROFITTING/STRENGTHENING OF MARCOS ALVAREZ BRIDGE 1 ALONG MARCOS ALVAREZ ROAD, LAS PIÑAS | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱24.1M | 100% | Medium risk47 | —-0.060 |
| 82 | 23OE0225REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - SABINO PADILLA BRIDGE, BINONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.065 |
| 83 | 19DJ0006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BOCOHAN BR. (B04791LZ) ALONG MSR DIVERSION RD., LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱7.4M | 100% | Medium risk47 | —-0.066 |
| 84 | 19DJ0004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DOMOIT BR. (B02934LZ) ALONG MSR DIVERSION ROAD, LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱7.4M | 100% | Medium risk47 | —-0.066 |
| 85 | 23DF0070ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHAB./ RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS DOCK JCT-AIRFIELD VIA SN JOSE PT RD - K0001 + (-191)-K0001+(-015) | Region IV-A | Cavite 1st DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.101 |
| 86 | 19DJ0057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DUMUKLONG BR. (B03071LZ) ALONG LUCENA - DALAHICAN PORT RD. LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱11M | 100% | Medium risk47 | —-0.068 |
| 87 | 19DJ0007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MAYAO BR. (B02939LZ) ALONG MSR DIVERSION RD., LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.066 |
| 88 | 19DJ0008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DUMUKLONG BR. (B02938LZ) ALONG MSR DIVERSION RD., LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.067 |
| 89 | 23OE0224REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - MEISIC BRIDGE, BINONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱7.7M | 100% | Medium risk47 | —-0.063 |
| 90 | 22DN0073CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ANGONO RIVER, BRGY. SAN VICENTE, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱27.3M | 100% | Medium risk47 | —-0.085 |
| 91 | 22DN0127REHABILITATION OF DRAINAGE AT GENERAL RICARTE ST., BARANGAY SAN JUAN CAINTA, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.8M | 87% | Medium risk47 | —-0.026 |
| 92 | 22DN0124DRAINAGE REHABILITATION, GENERAL RICARTE ST., BRGY. SAN JUAN CAINTA, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱9M | 100% | Medium risk47 | —-0.089 |
| 93 | 19DN0114REHABILITATION OF SLOPE PROTECTION OF CAINTA RIVER, CAINTA, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.089 |
| 94 | 19DN0141CONSTRUCTION/IMPROVEMENT OF PEDESTRIAN OVERPASS MANILA EAST ROAD (NEAR ROSARIO OCAMPO ES), K0021+497 - K0021+507, BRGY. SAN JUAN TAYTAY, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱16.8M | 100% | Medium risk47 | —-0.108 |
| 95 | 23DF0133CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. ANABU 1C, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱39M | 100% | Medium risk47 | —-0.087 |
| 96 | 22OH0152CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS)-CONST. OF TYPHOON SHELTER HANGAR FOR FIXED WING AIRCRAFT, COLONEL JESU | National Capital Region | South Manila DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.074 |
| 97 | 22DF0383REHABILITATION OF DISASTER - RELATED INFRASTRUCTURE AND OTHER FACILITIES, RELEASE OF FUNDS FOR THE CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. BACAO II, GENERAL TRIAS CITY, CAVITE WHICH WAS AFFECTED BY TYPHOON 'PAENG', | Region IV-A | Cavite 1st DEO | Completed | ₱39.6M | 100% | Medium risk46 | —-0.086 |
| 98 | 23DF0079HEHAB. OF DISASTER RELATED INFRASTRUCTURE & OTHER FACILITIES: REHAB.OF DAMAGED INFRASTRUCTURES WROUGHT BY TYPHOON PAENG, REHAB. OF REEVETMENT ALONG ILANG-ILANG RIVER, BRGY. BACAO II, GEN. TRIAS CITY, STA-0+000 - STA.0+200 | Region IV-A | Cavite 1st DEO | Completed | ₱36.5M | 100% | Medium risk46 | —-0.086 |
| 99 | 22DF0382REHAB. OF DISASTER - RELATED INFRASTRUCTURE AND OTHER FACILITIES, RELEASE OF FUNDS FOR THE CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF REVETMENT ALONG ILANG-ILANG RIVER BRGY. SAN ANTONIO, NOVELETA | Region IV-A | Cavite 1st DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.086 |
| 100 | 19OE0002ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT, ESTERO DE MAYPAJO, HERMOSA TO JUAN LUNA SECTION, STA. 0+438.76 TO STA. 0+483.5 | National Capital Region | North Manila DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.089 |