Contractor dossier
64 projects on file, including joint ventures this contractor is part of.
Total projects
64
Total budget
₱4.1B
Average progress
87.2%
Completion rate
78.1%
Average risk score
55.7
Medium risk on average, out of 100
Flagged as unusual
8
12.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 51 | ₱3.5B | 54.4 | 6 | 83.9% |
| Region I | 11 | ₱481.2M | 65.1 | 2 | 100.0% |
| Region III | 2 | ₱98.5M | 36.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 48 | ₱3.5B | 58.4 | 6 | 86.1% |
| Roads | 14 | ₱551.5M | 48.1 | 1 | 96.1% |
| Bridges | 2 | ₱14.7M | 45.7 | 1 | 50.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23BH0265SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF BRGY. QUIMALABASA NORTE FLOOD CONTROL PROJECT, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 0% | High risk71 | Flagged0.055 |
| 23BH0259SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 77% | High risk71 | Flagged0.040 |
| 17AB0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.037 |
| 17AB0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 17AB0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TIBANGRAN RIVER, BRGY. BARANGUBONG , NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk68 | —-0.038 |
| 17BG0024ASSET PRESERVATION OF NATIONAL ROADS- REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)-PRIMARY- SANTIAGO-TUGUEGARAO RD. K0346+751-K0348+421.80 SAN MATEO, | Region II | Isabela 3rd DEO | Completed | ₱16.6M | 100% | High risk66 | —-0.055 |
| 17AB0003CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.038 |
| 17AB0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. ACNAM, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.039 |
| 17AB0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GADGADAOAN RIVER, BRGY. BARIKIR, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.039 |
| 17AB0048REHABILITATION OF DIKE SYSTEM ALONG PAPA RIVER (BREACHED & ERRODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL & SABO PROJECT, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱24.5M | 100% | High risk66 | —-0.040 |
| 17AB0045PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)-TERTIARY ROADS- ILOCOS NORTE-ABRA ROAD, KO529+000 - KO531+000,KO531+000 -K0532+000 | Region I | Ilocos Norte 2nd DEO | Completed | ₱41.1M | 100% | High risk65 | —-0.048 |
| 17AB0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, SITIO BONOANG EAST AND WEST, BRGY. UGUIS, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk65 | —-0.038 |
| 25BH0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NEMMATAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS | Region II | Isabela 4th DEO | On-Going | ₱106.1M | 66% | High risk62 | —-0.021 |
| 24BH0217SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.2M | 31% | High risk62 | —-0.007 |
| 24BH0192SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE,SECTION 1,JONES,ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 30% | High risk62 | —-0.007 |
| 24BH0185SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 30% | High risk62 | —-0.007 |
| 24BH0297SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BUCAL NORTE FLOOD CONTROL STRUCTURE, SECTION 3, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 94% | High risk62 | —-0.025 |
| 24BH0294SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIMALUADE FLOOD CONTROL STRUCTURE, SECTION 2, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.054 |
| 24BH0296SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIMALUADE FLOOD CONTROL STRUCTURE, SECTION 1, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.055 |
| 24BH0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NAPALIONG FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23BH0265SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF BRGY. QUIMALABASA NORTE FLOOD CONTROL PROJECT, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 0% | High risk71 | Flagged0.055 |
| 23BH0262SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. SINAOANGAN NORTE FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱79.5M | 0% | Medium risk56 | Flagged0.052 |
| 23BH0259SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 77% | High risk71 | Flagged0.040 |
| 17AB0243REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) RIGHT BANK, BRGY. STO. CRISTO, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱46.1M | 100% | Medium risk59 | Flagged0.016 |
| 17AB0240REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) RIGHT BANK, BRGY. SAN MARCELINO, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱46.1M | 100% | Medium risk59 | Flagged0.016 |
| 24BH0312SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - REHABILITATION OF MASAYA SUR BRIDGE, MASAYA SUR, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.8M | 0% | Medium risk46 | Flagged0.007 |
| 25BH0212REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS, CONCRETING OF DALIBUBON TO PAYAC FMR, BRGY. DALIBUBON, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.7M | 59% | Medium risk40 | Flagged0.004 |
| 24BH0208SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF VIRGONEZA FLOOD CONTROL STRUCTURE, SECTION 4, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 0% | High risk61 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23BH0265SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF BRGY. QUIMALABASA NORTE FLOOD CONTROL PROJECT, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 0% | High risk71 | Flagged0.055 |
| 2 | 23BH0259SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 77% | High risk71 | Flagged0.040 |
| 3 | 17AB0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.037 |
| 4 | 17AB0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 5 | 17AB0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TIBANGRAN RIVER, BRGY. BARANGUBONG , NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk68 | —-0.038 |
| 6 | 17BG0024ASSET PRESERVATION OF NATIONAL ROADS- REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)-PRIMARY- SANTIAGO-TUGUEGARAO RD. K0346+751-K0348+421.80 SAN MATEO, | Region II | Isabela 3rd DEO | Completed | ₱16.6M | 100% | High risk66 | —-0.055 |
| 7 | 17AB0003CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.038 |
| 8 | 17AB0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. ACNAM, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.039 |
| 9 | 17AB0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GADGADAOAN RIVER, BRGY. BARIKIR, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk66 | —-0.039 |
| 10 | 17AB0048REHABILITATION OF DIKE SYSTEM ALONG PAPA RIVER (BREACHED & ERRODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL & SABO PROJECT, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱24.5M | 100% | High risk66 | —-0.040 |
| 11 | 17AB0045PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)-TERTIARY ROADS- ILOCOS NORTE-ABRA ROAD, KO529+000 - KO531+000,KO531+000 -K0532+000 | Region I | Ilocos Norte 2nd DEO | Completed | ₱41.1M | 100% | High risk65 | —-0.048 |
| 12 | 17AB0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, SITIO BONOANG EAST AND WEST, BRGY. UGUIS, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.1M | 100% | High risk65 | —-0.038 |
| 13 | 25BH0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NEMMATAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS | Region II | Isabela 4th DEO | On-Going | ₱106.1M | 66% | High risk62 | —-0.021 |
| 14 | 24BH0217SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.2M | 31% | High risk62 | —-0.007 |
| 15 | 24BH0192SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE,SECTION 1,JONES,ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 30% | High risk62 | —-0.007 |
| 16 | 24BH0185SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PAYAC FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 30% | High risk62 | —-0.007 |
| 17 | 24BH0297SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BUCAL NORTE FLOOD CONTROL STRUCTURE, SECTION 3, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96.3M | 94% | High risk62 | —-0.025 |
| 18 | 24BH0294SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIMALUADE FLOOD CONTROL STRUCTURE, SECTION 2, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.054 |
| 19 | 24BH0296SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIMALUADE FLOOD CONTROL STRUCTURE, SECTION 1, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.055 |
| 20 | 24BH0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NAPALIONG FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.055 |
| 21 | 24BH0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NAPALIONG FLOOD CONTROL STRUCTURE SECTION 3,JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.055 |
| 22 | 24BH0110SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BAUTISTA FLOOD CONTROL STRUCTURE, SECTION 2, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.055 |
| 23 | 25BH0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PALACIAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS | Region II | Isabela 4th DEO | Completed | ₱106M | 100% | High risk61 | —-0.052 |
| 24 | 21BG0123LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL STRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER BANK - BRGY. PAPPAT, ANGADANAN, ISA | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 25 | 25BH0293BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF CAQUILINAN FLOOD CONTROL STRUCTURE, SECTION 1, CORDON, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱96M | 6% | High risk61 | —-0.006 |