32 projects on file, including joint ventures this contractor is part of.
Total projects
32
Total budget
₱1.2B
Average progress
98.1%
Completion rate
84.4%
Average risk score
39.7
Medium risk on average, out of 100
Flagged as unusual
1
3.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 31 | ₱1.2B | 39.5 | 1 | 98.1% |
| Region II | 1 | ₱8.3M | 45.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 20 | ₱1.1B | 43.7 | 1 | 97.0% |
| Roads | 7 | ₱57.6M | 28.0 | 0 | 100.0% |
| Bridges | 5 | ₱68.5M | 39.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0001CONSTRUCTION OF TANGUAY RIVER FLOOD MITIGATION STRUCTURE, PHASE 3, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk82 | —-0.015 |
| 24CL0154CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 5) | Region III | Zambales 1st DEO | On-Going | ₱92.9M | 100% | High risk81 | —-0.015 |
| 24CL0171CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 6) | Region III | Zambales 1st DEO | On-Going | ₱138.6M | 96% | High risk81 | —-0.005 |
| 24CL0166CONSTRUCTION OF SLOPE PROTECTION PACKAGE 15 AT BOTOLAN-CAPAZ RD., BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.3M | 100% | High risk81 | —-0.045 |
| 25CL0163CONSTRUCTION OF BANK PROTECTION/FLOOD STABILIZATION STRUCTURES ALONG BUCAO RIVER, UPSTREAM, BOTOLAN, ZAMBALES (PHASE 10) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 90% | High risk81 | —-0.018 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19C00051REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, RESTORATION OF SLOPE PROTECTION ALONG PAMATAWAN RIVER, CASTILLEJOS, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | On-Going | ₱37.4M | 54% | Medium risk44 | Flagged0.046 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24CL0001CONSTRUCTION OF TANGUAY RIVER FLOOD MITIGATION STRUCTURE, PHASE 3, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk82 | —-0.015 |
| 2 | 24CL0154CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 5) | Region III | Zambales 1st DEO | On-Going | ₱92.9M | 100% | High risk81 | —-0.015 |
| 3 | 24CL0171CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 6) | Region III | Zambales 1st DEO | On-Going | ₱138.6M | 96% | High risk81 | —-0.005 |
| 4 | 24CL0166CONSTRUCTION OF SLOPE PROTECTION PACKAGE 15 AT BOTOLAN-CAPAZ RD., BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.3M | 100% | High risk81 | —-0.045 |
| 5 | 25CL0163CONSTRUCTION OF BANK PROTECTION/FLOOD STABILIZATION STRUCTURES ALONG BUCAO RIVER, UPSTREAM, BOTOLAN, ZAMBALES (PHASE 10) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 90% | High risk81 | —-0.018 |
| 6 | 17CL0078WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, LINORON BR. 2 (B02812LZ) ALONG SN MARCELINO- SN ANTONI | Region III | Zambales 1st DEO | Completed | ₱16.1M | 100% | Medium risk54 | —-0.035 |
| 7 | 19BH0009RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGE, SAN LUIS BRIDGE (B01408LZ) ALONG DAANG MAHARLIKA (LZ) | Region II | Isabela 4th DEO | Completed | ₱8.3M | 100% | Medium risk45 | —-0.048 |
| 8 | 19C00051REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, RESTORATION OF SLOPE PROTECTION ALONG PAMATAWAN RIVER, CASTILLEJOS, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | On-Going | ₱37.4M | 54% | Medium risk44 | Flagged0.046 |
| 9 | 18CA0043REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CALAGUIMAN BRIDGE (B01701LZ) ALONG ROMAN EXPRESSWAYSAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱15.3M | 100% | Medium risk38 | —-0.064 |
| 10 | 21CF0090REHABILITATION OF PEÑARANDA RIVER CONTROL, STA. 0+000.00 - STA. 0+452.40, BRGY. CALLOS, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱72.1M | 100% | Medium risk36 | —-0.089 |
| 11 | 20CM0072CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT ELICANO ST., EAST BAJAC-BAJAC, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱17.3M | 100% | Medium risk36 | —-0.100 |
| 12 | 20CM0073CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT FONTAINE ST., OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱13.4M | 100% | Medium risk34 | —-0.100 |
| 13 | 22CM0057FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE STRUCTURE ALONG KALAKLAN RIVER, STA. 2+670 TO STA. 2+920, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱48.2M | 100% | Medium risk34 | —-0.089 |
| 14 | 22CM0060FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE STRUCTURE ALONG STA. RITA RIVER, STA. 8+150 TO STA. 8+550, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱48.2M | 100% | Medium risk33 | —-0.087 |
| 15 | 22CM0059FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE STRUCTURE ALONG STA. RITA RIVER, STA. 8+550 TO STA. 8+950, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱48.2M | 100% | Medium risk33 | —-0.087 |
| 16 | 20CM0071LOCAL ROADS - CONCRETING OF SITIO ROADS, IRAM, NEW CABALAN, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱4.8M | 100% | Medium risk32 | —-0.101 |
| 17 | 23CI0100FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONSTRUCTION OF GROUNDSILL WITH SLOPE PROTECTION ALONG ABACAN RIVER, DOWNSTREAM OF NLEX BRIDGE, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.092 |
| 18 | 18CL0059WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, MABANGCAL BR. (B01439LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱21.3M | 100% | Medium risk31 | —-0.060 |
| 19 | 19CL0074CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL STRUCTURE AT BALILI RIVER, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱28.2M | 100% | Medium risk31 | —-0.086 |
| 20 | 20CL0018CONSTRUCTION OF SLOPE PROTECTION AT BALILI RIVER, NORTH APPROACH, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱29.1M | 100% | Medium risk31 | —-0.086 |
| 21 | 20CL0008CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BANCAL RIVER (CABATUHAN PHASE 3) UPSTREAM, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱32.1M | 100% | Medium risk31 | —-0.086 |
| 22 | 19CM0065CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (LEFT SIDE), OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱36.2M | 100% | Medium risk30 | —-0.090 |
| 23 | 19CM0066CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (RIGHT SIDE), OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱36.2M | 100% | Medium risk30 | —-0.090 |
| 24 | 22CM0067CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF MABAYUAN RIVER, STA. 8+520.60 - STA. 8+920.00 (RIGHT SIDE), OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱38.6M | 100% | Medium risk30 | —-0.090 |
| 25 | 18CL0049WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, CASANTACRUZAN BR. (B01440LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱7.5M | 100% | Low risk30 | —-0.061 |