Opening the dossier…
Opening the dossier…
Contractor dossier
283 projects on file, including joint ventures this contractor is part of.
Total projects
283
Total budget
₱29.4B
Average progress
97.1%
Completion rate
82.0%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
35
12.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 186 | ₱16.9B | 42.6 | 14 | 99.1% |
| Region XI | 84 | ₱11B | 58.5 | 20 | 92.2% |
| Region XIII | 5 | ₱611.8M | 47.0 | 0 | 100.0% |
| Region I | 4 | ₱587.6M | 62.1 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱329.9M | 64.2 | 1 | 100.0% |
| Region VII | 1 | ₱83.7M | 53.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱14B | 43.3 | 13 | 97.3% |
| Flood Control and Drainage | 59 | ₱4.9B | 51.1 | 2 | 99.4% |
| Bridges | 26 | ₱2.9B | 43.0 | 5 | 97.1% |
| Buildings and Facilities | 21 | ₱1.3B | 36.9 | 0 | 96.2% |
| OTHER | 19 | ₱4.2B | 74.6 | 7 | 95.9% |
| Bridges, Roads | 9 | ₱1.3B | 55.4 | 2 | 94.9% |
| GAA 2025 OO-1 | 5 | ₱663.9M | 93.6 | 5 | 75.7% |
| GAA 2025 OO-2 | 1 | ₱112.3M | 89.9 | 1 | 91.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00050PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (COTABATO-MARBEL RD) - K1738 + 462 - K1740 + 000, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱205.8M | 81% | High risk94 | Flagged0.034 |
| 25L00002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA, DAVAO DE ORO K1382+337 - K1383+942, MONKAYO DAVAO DE ORO | Region XI | Region XI | On-Going | ₱140.6M | 39% | High risk94 | Flagged0.040 |
| 25ME0118ASPHALT OVERLAY - SARANGANI - SULTAN KUDARAT COASTAL RD K1717+506 - K1720+000, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱102.8M | 80% | High risk94 | Flagged0.022 |
| 25MF0001PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY - KIDAPAWAN - ALLAH JUNCTION RD - K1680 + 2362 - K1680 + 3012 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱74.4M | 100% | High risk93 | Flagged0.001 |
| 25MD0002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT), ALEOSAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 79% | High risk93 | Flagged0.021 |
| 25M00181CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, PHASE II, STA 0+000 - STA 0+307 (RIGHT BANK); STA 0+000 - STA 0+300 (LEFT BANK), BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱112.3M | 91% | High risk90 | Flagged0.003 |
| 24M00311PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1592+339 - K1593+000, K1594+000 - K1595+000, K1601+000 - K1601+394, K1604+000 - K1605+000, MALUNGON, SARANGANI | Region XII | Region XII | On-Going | ₱241M | 100% | High risk86 | Flagged0.074 |
| 22M00090REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT), K1690+000 - K1696+301, MIDSAYAP, NORTH COTABATO | Region XII | Region XII | Completed | ₱102.3M | 100% | High risk81 | —-0.022 |
| 21L00148CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT) (PARTIAL SUBSTRUCTURE), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱513M | 82% | High risk80 | Flagged0.065 |
| 22L00017CONSTRUCTION OF FLYOVER ALONG DAVAO CITY DIVERSION ROAD (JCT. MAGTUOD/MAA SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱1.4B | 84% | High risk80 | Flagged0.061 |
| 22L00002CONSTRUCTION OF VIADUCT (PARTIAL SUBSTRUCTURE) - DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 2, DAVAO CITY | Region XI | Region XI | On-Going | ₱200M | 57% | High risk79 | Flagged0.061 |
| 24M00208PREVENTIVE MAINTENANCE - MARBEL-MAKAR RD - K1696 + 271 - K1697 + 690, KORONADAL CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 100% | High risk78 | Flagged0.026 |
| 24M00171PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD - K1734 + 015- K1736 + 136, SURALLAH, SOUTH COTABATO | Region XII | Region XII | Completed | ₱287.5M | 100% | High risk77 | Flagged0.002 |
| 20LB0188REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS (ASPHALT TO CONCRETE) ALONG DAVAO-BUKIDNON RD - K1698+(-629) - K1701+200 | Region XI | Davao City DEO | Completed | ₱86.9M | 100% | High risk76 | —-0.006 |
| 22M00107IMPROVEMENT AT BARANGAY POBLACION, STA. 0+000-STA. 2+862, NURO, UPI, NORTH UPI, MAGUINDANAO | Region XII | Region XII | Completed | ₱102.8M | 100% | High risk76 | —-0.020 |
| 20LB0255ALTERNATE RD. FROM REGION XI TO REGION X, (JCT DAVAO CITY DIVERSION RD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), DAVAO CITY | Region XI | Davao City DEO | Completed | ₱46.9M | 100% | High risk73 | —-0.015 |
| 20M00048CONSTRUCTION OF MISSING LINKS/NEW ROADS - DATU PAGLAS - COLUMBIO MATANAO ROAD, PACKAGE 3, STA. 11+315-STA 13+026 BRIDGE I - STA. 8+090-STA. 8+150BRIDGE II STA. 17+182-STA. 17+217 | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk73 | —-0.003 |
| 18LB0172IMPROVEMENT/REHABILITATION OF DRAINAGE ALONG ABS-CBN QUIMPO BOULEVARD DIVERSION ROAD (JCT. TULIP DRIVE-JCT. ECOLAND TERMINAL)DAVAO CITY | Region XI | Davao City DEO | Completed | ₱59M | 100% | High risk72 | —-0.028 |
| 18M00033ROAD WIDENING DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION), MIDSAYAP-LIBUNGAN-AND PIGCAWAYAN, NORTH COTABATO KM 1692+770 KM 1693+370, KM1697+078 KM1697+540, KM1697+KM1697+820, KM1703+456-KM1703+552, KM1703+573 KM1703+669, KM1705+876 KM1705+ | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk72 | Flagged0.005 |
| 20LB0260REHABILITATION OF PAVED ALTERNATE ROAD FROM REGION XI TO REGION X, JCT. DAVAO CITY DIVERSION RD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PANALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱39.2M | 100% | High risk72 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24M00311PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1592+339 - K1593+000, K1594+000 - K1595+000, K1601+000 - K1601+394, K1604+000 - K1605+000, MALUNGON, SARANGANI | Region XII | Region XII | On-Going | ₱241M | 100% | High risk86 | Flagged0.074 |
| 21L00148CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT) (PARTIAL SUBSTRUCTURE), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱513M | 82% | High risk80 | Flagged0.065 |
| 22L00002CONSTRUCTION OF VIADUCT (PARTIAL SUBSTRUCTURE) - DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 2, DAVAO CITY | Region XI | Region XI | On-Going | ₱200M | 57% | High risk79 | Flagged0.061 |
| 22L00017CONSTRUCTION OF FLYOVER ALONG DAVAO CITY DIVERSION ROAD (JCT. MAGTUOD/MAA SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱1.4B | 84% | High risk80 | Flagged0.061 |
| 17M00109DEVELOPMENT OF COTABATO AIRPORT, DATU ODIN SINSUAT, AWANG, MAGUINDANAO | Region XII | Region XII | Completed | ₱338.9M | 100% | Medium risk44 | Flagged0.041 |
| 25L00002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA, DAVAO DE ORO K1382+337 - K1383+942, MONKAYO DAVAO DE ORO | Region XI | Region XI | On-Going | ₱140.6M | 39% | High risk94 | Flagged0.040 |
| 24M00312PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1614+000 - K1616+000, K1619+000 - K1619-969, MALUNGON SARANGANI | Region XII | Region XII | On-Going | ₱231.4M | 91% | High risk64 | Flagged0.039 |
| 22L00172CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱570.3M | 71% | High risk64 | Flagged0.039 |
| 25M00050PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (COTABATO-MARBEL RD) - K1738 + 462 - K1740 + 000, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱205.8M | 81% | High risk94 | Flagged0.034 |
| 20L00153ROAD WIDENING AND REPLACEMENT OF BRIDGE ALONG JCT. DAVAO CITY DIVERSION RD. (MATINA PANGI SECTION) - MATINA PANGI RD. - SITIO TORIL - JCT. CATALUNAN GRANDE RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱261M | 36% | High risk66 | Flagged0.032 |
| 20L00152ROAD WIDENING & REPLACEMENT OF BRIDGE ALONG JCT. DAVAO CITY DIVERSION RD. - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO - BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱281.1M | 47% | High risk66 | Flagged0.031 |
| 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 16M00039CONSTRUCTION OF PINGUIAMAN BRIDGE II ALONG DULAWAN-MARBEL ROAD, K1744+200 TO K1745+168, EXCEPTION K1744+400+K1745+500 (BRIDGE), LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱362M | 100% | Medium risk51 | Flagged0.026 |
| 24M00208PREVENTIVE MAINTENANCE - MARBEL-MAKAR RD - K1696 + 271 - K1697 + 690, KORONADAL CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 100% | High risk78 | Flagged0.026 |
| 20LB0201CONSTRUCTION OF MATINA PANGI BRIDGE 3 GOING TO MATINA PANGI ES, MATINA RIVER, DAVAO CITY (PHASE I) | Region XI | Davao City DEO | On-Going | ₱94.1M | 64% | High risk63 | Flagged0.024 |
| 25ME0118ASPHALT OVERLAY - SARANGANI - SULTAN KUDARAT COASTAL RD K1717+506 - K1720+000, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱102.8M | 80% | High risk94 | Flagged0.022 |
| 25MD0002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT), ALEOSAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 79% | High risk93 | Flagged0.021 |
| 23L00009CONSTRUCTION OF CONRETE BRIDGE - DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱380.2M | 64% | High risk67 | Flagged0.020 |
| 21L00055REHABILITATION OF TALOMO RIVER, TALOMO BRIDGE DOWNSTREAM SECTION, LEFT BANK, DAVAO CITY | Region XI | Region XI | On-Going | ₱178.2M | 67% | High risk65 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19P00045REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | Flagged0.009 |
| 27 | 23L00009CONSTRUCTION OF CONRETE BRIDGE - DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱380.2M | 64% | High risk67 | Flagged0.020 |
| 28 | 20L00146CONSTRUCTION OF CONCRETE ROAD - BYPASS ROAD AT MA-A RADIO STATION - DATU LOHO ST. - RIVERSIDE - JCT. BACACA ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱140.8M | 90% | High risk66 | Flagged0.001 |
| 29 | 20LB0261ROAD WIDENING & REPLACEMENT OF BRIDGE ALONG JCT. DAVAO-COTABATO OLD ROAD (BAGO GALLERA SECTION) LEADING TO PHILIPPINE COCONUT AUTHORITY (PCA), DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱96.5M | 100% | High risk66 | Flagged0.000 |
| 30 | 22L00158ROAD WIDENING ALONG TIBANBAN - LAVIGAN RD (S01397MN) - K1782+600 - K1784+506, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱182.3M | 79% | High risk66 | Flagged0.006 |
| 31 | 21L00126PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) DAVAO - COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECTION) K1522+764 - K1524+471, DAVAO CITY | Region XI | Region XI | Completed | ₱157.5M | 100% | High risk66 | —-0.063 |
| 32 | 21L00127PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) - DAVAO CITY DIV. RD., K1489+(-165) - K1506+931, DAVAO CITY | Region XI | Region XI | On-Going | ₱193.4M | 75% | High risk66 | Flagged0.010 |
| 33 | 18L00133WIDENING OF ROAD AT JCT. DAVAO CITY DIVERSION RD-LANGUB ROAD-MAGTUOD ROAD INCL. DRAINAGE STRUCTURES | Region XI | Region XI | Completed | ₱188M | 100% | High risk66 | —-0.042 |
| 34 | 18L00113FATIMA-MALABOG ROAD TO MABUHAY-PAÑALUM-PAQUIBATO ROAD, PACKAGE B, INCLUDING ROW, DAVAO CITY | Region XI | Region XI | Completed | ₱180.2M | 100% | High risk66 | —-0.048 |
| 35 | 21L00094PREVENTIVE MAINTENANCE OF ROAD, ASPHALT OVERLAY ALONG CIRCUMFERENTIAL ROAD (JCT. FS DIZON ST. JCT. E. QUIRINO ST.) DAVAO CITY | Region XI | Region XI | On-Going | ₱148.6M | 90% | High risk66 | —-0.004 |
| 36 | 20L00152ROAD WIDENING & REPLACEMENT OF BRIDGE ALONG JCT. DAVAO CITY DIVERSION RD. - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO - BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱281.1M | 47% | High risk66 | Flagged0.031 |
| 37 | 18L00047IMPV'T./RECONST./CONC. OF MAHAYAG-GATUNGAN-CALLAWA DIVERSION ROAD INCL. ROW, DAVAO CITY | Region XI | Region XI | Completed | ₱283.1M | 100% | High risk66 | —-0.037 |
| 38 | 20L00153ROAD WIDENING AND REPLACEMENT OF BRIDGE ALONG JCT. DAVAO CITY DIVERSION RD. (MATINA PANGI SECTION) - MATINA PANGI RD. - SITIO TORIL - JCT. CATALUNAN GRANDE RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱261M | 36% | High risk66 | Flagged0.032 |
| 39 | 22L00126REHABILITATION OF ROAD ALONG JCT. DAVAO CITY DIV. RD - CATALUNAN GRANDE RD - JCT. MINTAL ROAD, BRGY. CATALUNAN GRANDE, DAVAO CITY | Region XI | Region XI | On-Going | ₱360.8M | 98% | High risk66 | Flagged0.004 |
| 40 | 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 41 | 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 42 | 21L00141CONSTRUCTION OF FLYOVER (PARTIAL SUBSTRUCTURE) ALONG DAVAO CITY DIVERSION ROAD (JCT. MAGTUOD/MAA SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱188.2M | 100% | High risk65 | —-0.009 |
| 43 | 21L00055REHABILITATION OF TALOMO RIVER, TALOMO BRIDGE DOWNSTREAM SECTION, LEFT BANK, DAVAO CITY | Region XI | Region XI | On-Going | ₱178.2M | 67% | High risk65 | Flagged0.020 |
| 44 | 22L00013CONSTRUCTION OF REVETMENT ALONG TALOMO RIVER, OUTFALL SECTION, RIGHT BANK, DAVAO CITY | Region XI | Region XI | Completed | ₱144.7M | 100% | High risk64 | —-0.045 |
| 45 | 22L00172CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱570.3M | 71% | High risk64 | Flagged0.039 |
| 46 | 20L00135PREVENTIVE MAINTENANCE - ASPHALT OVERLAY ON SPECIFIC LOCATIONS ALONG DAVAO CITY DIVERSION ROAD (S00013MN), K1514+103 - K1515+832, DAVAO CITY | Region XI | Region XI | Completed | ₱134.9M | 100% | High risk64 | —-0.070 |
| 47 | 17M00082CONSTRUCTION OF REVETMENT WORKS ALONG PULANGI RIVER PHASE II, STA. 3+930 STA. 4+160, DATU MONTAWAL, MAGUINDANAO | Region XII | Region XII | Completed | ₱138.7M | 100% | High risk64 | —-0.033 |
| 48 | 20L00154ROAD WIDENING ALONG JCT. DAVAO CITY DIVERSION ROAD - LANGUB ROAD - MAGTUOD ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱131.5M | 30% | High risk64 | Flagged0.014 |
| 49 | 24M00312PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1614+000 - K1616+000, K1619+000 - K1619-969, MALUNGON SARANGANI | Region XII | Region XII | On-Going | ₱231.4M | 91% | High risk64 | Flagged0.039 |
| 50 | 21L00124INSTALLATION OF ROAD SAFETY FACILITIES, DAVAO - BUKIDNON ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱144.7M | 100% | High risk64 | —-0.062 |