Contractor dossier
339 projects on file, including joint ventures this contractor is part of.
Total projects
339
Total budget
₱11.4B
Average progress
94.1%
Completion rate
82.0%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
14
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 203 | ₱7.5B | 52.7 | 13 | 90.2% |
| Region X | 91 | ₱2.2B | 37.6 | 0 | 100.0% |
| Region VII | 25 | ₱811.7M | 46.6 | 0 | 99.6% |
| Region IV-A | 10 | ₱397.5M | 52.1 | 0 | 100.0% |
| Region IV-B | 4 | ₱146.8M | 40.7 | 0 | 100.0% |
| Region XII | 2 | ₱173.6M | 60.3 | 1 | 98.5% |
| Negros Island Region | 2 | ₱111.5M | 58.7 | 0 | 100.0% |
| National Capital Region | 2 | ₱30.6M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 132 | ₱4.4B | 51.3 | 1 | 94.2% |
| Buildings and Facilities | 115 | ₱3B | 37.6 | 4 | 96.5% |
| Flood Control and Drainage | 50 | ₱2.2B | 55.2 | 0 | 97.2% |
| Water Provision and Storage | 18 | ₱759.2M | 47.4 | 0 | 100.0% |
| Bridges | 14 | ₱611.7M | 54.5 | 3 | 74.1% |
| OTHER | 7 | ₱289.2M | 78.6 | 4 | 80.6% |
| GAA 2025 OO-1 | 2 | ₱101.7M | 93.6 | 2 | 6.8% |
| GAA 2025 OO-2 | 1 | ₱48.2M | 90.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JE0024REPLACEMENT OF PERMANENT WEAK BRIDGES TUKURAN BR. (B01196MN) ALONG LANAO- PAGADIAN- ZAMBOANGA CITY RD. TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱57.8M | 3% | High risk94 | Flagged0.023 |
| 25J00112CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LABANGAN-MIDSALIP ROAD, ZAMBOANGA DEL SUR 1ST LD (PACKAGE 2) | Region IX | Region IX | On-Going | ₱43.9M | 11% | High risk93 | Flagged0.018 |
| 25JE0031CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/ CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG DAKU RIVER, BARANGAY LOWER STO. NIÑO, MAHAYAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.019 |
| 25JG0050CONCRETING OF BARANGAY TINA FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 33% | High risk88 | Flagged0.060 |
| 25JG0048CONCRETING OF BARANGAY ANONANG FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 80% | High risk88 | Flagged0.049 |
| 17J00075SHOULDER PAVING WITH DRAINAGE IMPROVEMENT AT IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD, K1751+(-602.00) TO K1769+693.00 (INTERMITTENT SECTIONS), ZAMBOANGA SIBUGAY (1ST DEO) | Region IX | Region IX | Completed | ₱87.8M | 100% | High risk79 | —-0.021 |
| 24M00069CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE II) BARANGAY LABU-O, STA. 42+561-STA. 42+811.95, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱86.8M | 100% | High risk79 | Flagged0.008 |
| 25JG0043CONSTRUCTION OF DPWH ZAMBOANGA DEL SUR 2ND DEO COMPOUND, BARANGAY POBLACION, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱39.2M | 52% | High risk76 | Flagged0.013 |
| 18JI0071CONSTRUCTION/ REHAB. OF WATER SYSTEM AT BRGY. NAGA-NAGA, ALICIA, Z.S | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱19.4M | 100% | High risk75 | —-0.027 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21J00019NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱95.7M | 70% | High risk73 | —-0.002 |
| 23J00095CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL AT TUKURAN RIVER, MILITAR BR. SECTION (B00470MN) (UPSTREAM - RIGHT SIDE), ALONG JCT. TUKURAN -JCT. KAROMATAN ROAD (S01103), TUKURAN, ZAMBOANGA DEL | Region IX | Region IX | On-Going | ₱105.8M | 85% | High risk73 | —-0.011 |
| 24J00040CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TUKURAN RIVER, MILITAR BR. SECTION (B00470MN), ALONG JCT. TUKURAN - JCT. KAROMATAN ROAD (S01103MN), ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱117.3M | 82% | High risk73 | —-0.015 |
| 19J00051CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF USUGAN FLOOD CONTROL, BRGY. TUNGAWAN, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Region IX | Completed | ₱101M | 100% | High risk72 | —-0.060 |
| 17J00186WATER SUPPLY & SANITATION FOR POVERTY AREAS & TOURISM PRIORITY SITES CONSTRUCTION OF VARIOUS WATER SUPPLY PROJECTS IN ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱115.9M | 100% | High risk72 | —-0.008 |
| 20DN0028CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF BANABA CREEK (PHASE 3), BRGY. SAN LUIS, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.058 |
| 24JE0017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LANGAPOD- BAGALUPA- GUBANG- MACASING ROAD (LANGAPOD BRIDGE), ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱96.4M | 70% | High risk71 | —-0.003 |
| 21J00064CONSTRUCTION OF MISSING LINKS/NEW ROADS ZAMBOANGA DEL SUR COASTAL ROAD (DUMALINAO - SAN PABLO SECTION) ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱97.2M | 100% | High risk70 | —-0.014 |
| 24J00124REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱109.4M | 30% | High risk70 | —-0.016 |
| 22JE0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD NETWORK AND DRAINAGE INSIDE REGIONAL GOVERNMENT CENTER, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱96.3M | 100% | High risk70 | —-0.062 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JG0050CONCRETING OF BARANGAY TINA FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 33% | High risk88 | Flagged0.060 |
| 25JG0048CONCRETING OF BARANGAY ANONANG FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 80% | High risk88 | Flagged0.049 |
| 24J00251J. H. CERILLES STATE COLLEGE - COMPLETION OF ACADEMIC BUILDING, JHCSC PAGADIAN CAMPUS | Region IX | Region IX | On-Going | ₱24.9M | 25% | Medium risk38 | Flagged0.038 |
| 25JE0024REPLACEMENT OF PERMANENT WEAK BRIDGES TUKURAN BR. (B01196MN) ALONG LANAO- PAGADIAN- ZAMBOANGA CITY RD. TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱57.8M | 3% | High risk94 | Flagged0.023 |
| 23JF0094CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG LANAO - PAGADIAN - ZAMBOANGA CITY RD., IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | On-Going | ₱19.3M | 30% | Medium risk52 | Flagged0.019 |
| 25J00112CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LABANGAN-MIDSALIP ROAD, ZAMBOANGA DEL SUR 1ST LD (PACKAGE 2) | Region IX | Region IX | On-Going | ₱43.9M | 11% | High risk93 | Flagged0.018 |
| 25JE0028REPLACEMENT OF PERMANENT WEAK BRIDGES- PULACAN BR. (B00468MN) ALONG JCT. AURORA- MONTE ALEGRE- JCT. LABANGAN RD, PULACAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱29.4M | 1% | Medium risk59 | Flagged0.017 |
| 24J00252J. H. CERILLES STATE COLLEGE - CONSTRUCTION OF ACADEMIC BUILDING AT BIWANGAN, LAKEWOOD CAMPUS | Region IX | Region IX | On-Going | ₱22.9M | 36% | Medium risk45 | Flagged0.014 |
| 25JG0043CONSTRUCTION OF DPWH ZAMBOANGA DEL SUR 2ND DEO COMPOUND, BARANGAY POBLACION, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱39.2M | 52% | High risk76 | Flagged0.013 |
| 17JB0168CONSTRUCTION OF THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT SINDANGAN AGRICULTURAL SCHOOL, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱30M | 100% | Medium risk37 | Flagged0.008 |
| 24M00069CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE II) BARANGAY LABU-O, STA. 42+561-STA. 42+811.95, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱86.8M | 100% | High risk79 | Flagged0.008 |
| 25JE0044REPLACEMENT OF PERMANENT WEAK BRIDGES NAVALAN BR. (B00467MN) ALONG JCT. AURORA- MONTE ALEGRE- JCT. LABANGAN RD., NAVALAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱28.5M | 33% | Medium risk58 | Flagged0.007 |
| 24JE0052SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF DILUD BRIDGE, DUMINGAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱48.2M | 4% | Medium risk57 | Flagged0.007 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24J00110ROAD WIDENING-PRIMARY ROADS LANAO-PAGADIAN CITY-ZAMBOANGA CITY RD (S01328MN) | Region IX | Region IX | On-Going | ₱110.4M | 68% | High risk69 | —-0.028 |
| 27 | 17DF0008MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, ANABU II-F, PHASE II, IMUS, CAVITE 3RD LD | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | High risk68 | —-0.060 |
| 28 | 23J00083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS LANAO - PAGADIAN - ZAMBOANGA CITY ROAD | Region IX | Region IX | Completed | ₱101.3M | 100% | High risk67 | —-0.071 |
| 29 | 20J00171CONSTRUCTION OF MULTI-PURPOSE BUILDING (MULTI-PURPOSE GYMNASIUM) | Region IX | Region IX | Completed | ₱143.9M | 100% | High risk65 | —-0.050 |
| 30 | 17HF0004NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY ROAD, TOLEDO-PINAMUNGAJAN-MANTALONGON ROAD (S00235CB), K0076+000 - K0078+023 | Region VII | Cebu 3rd DEO | Completed | ₱27M | 100% | High risk65 | —-0.030 |
| 31 | 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 32 | 24JG0026CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - REBOKON - PALARAN - TUBO PAIT - SACBULAN - SENIOR SAGASAN ROAD LEADING TO SAN PABLO PORT, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱19.6M | 100% | High risk64 | —-0.019 |
| 33 | 24JE0066CONSTRUCTION/ COMPLETION OF MULTI- PURPOSE BUILDING (GYMNASIUM) PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱98.9M | 55% | High risk64 | —-0.013 |
| 34 | 17JG0010ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG JCT. TUBOD - LAKEWOOD ROAD (S01188MN), LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱41.3M | 100% | High risk64 | —-0.038 |
| 35 | 24H00042OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD MITIGATION STRUCTURE ALONG MACOPA STREET - E. SABELLANO STREET-F. LLAMAS STREET, CEBU | Region VII | Region VII | On-Going | ₱96.5M | 90% | High risk64 | —-0.025 |
| 36 | 17JG0017CONSTRUCTION OF SIBUGUEY RIVER FLOOD CONTROL PROJECT (PHASE I), POBLACION, BAYOG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱42.3M | 100% | High risk63 | —-0.031 |
| 37 | 20JE0072CONSTRUCTION OF SPORTS CENTER AT THE PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱92.5M | 100% | High risk63 | —-0.060 |
| 38 | 23J00098ROAD WIDENING - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱78.2M | 56% | High risk63 | —-0.025 |
| 39 | 22JI0002ROAD WIDENING -PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY RD - K1725+630 - K1725+692, K1725+800 - K1725+918, K1727+221 - K1727+276, K1732+000 - K1732+134, K1755+200 - K1756+020, K1756+020 - K1756+236 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱76.4M | 100% | High risk63 | —-0.078 |
| 40 | 17JE0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SALUG DAKU FLOOD CONTROL, BARANGAY TUMAPIC, MAHAYAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱42.1M | 100% | High risk63 | —-0.050 |
| 41 | 17JE0001CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG USUGAN RIVER, BARANGAY TUNGAWAN, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱44.1M | 100% | High risk63 | —-0.050 |
| 42 | 17JE0068CONSTRUCTION OF WATER SUPPLY PROJECT ,TUKURAN,ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱39.7M | 100% | High risk63 | —-0.025 |
| 43 | 22JE0087SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD FROM NRJ PAGADIAN CITY LEADING TO REGIONAL GOVERNMENT CENTER, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱65.5M | 100% | High risk63 | —-0.079 |
| 44 | 22JE0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR (PHASE 1) | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱76.9M | 100% | High risk63 | —-0.073 |
| 45 | 18JI0067CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISIM DESTINATION AT NATIONAL RD JCT. LEADING TO BALURAN FALLS, BRGY. LOWER BALURAN. IMELDA Z.S (STA. 0+000 - STA. 1+800 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱58.4M | 100% | High risk62 | —-0.080 |
| 46 | 19JI0052NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY RD - K1746 + 067.00 - K1746+986.90 AND K1752+000.00 - K1752+817.10 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.081 |
| 47 | 18J00054CONSTRUCTION OF MISSING LINKS/NEWROADS-LABANGAN-MIDSALIP ROAD, INCLUDING ROW, ZAMBOANGA DEL SUR | Region IX | Region IX | Completed | ₱82.6M | 100% | High risk62 | —-0.073 |
| 48 | 22J00035CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TUKURAN RIVER, MILITAR BR. SECTION (B00470MN) (UPSTREAM - RIGHT SIDE), ALONG JCT. TUKURAN - JCT. KAROMATAN ROAD (S01103MN), ZAMBOANG | Region IX | Region IX | On-Going | ₱84.5M | 100% | High risk62 | —-0.011 |
| 49 | 24JG0046SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF NANGAN-NANGAN BRIDGE, NANGAN-NANGAN, TIGBAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱77.1M | 59% | High risk62 | —-0.005 |
| 50 | 22J00043CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT REBOKON RIVER, REBOKON BRIDGE SECTION ALONG ZAMBOANGA DEL SUR COASTAL NATIONAL ROAD (S01101MN), BRGY. REBOKON, DUMALINAO, ZAMBOANGA | Region IX | Region IX | On-Going | ₱67.7M | 100% | High risk62 | —-0.020 |