Contractor dossier
339 projects on file, including joint ventures this contractor is part of.
Total projects
339
Total budget
₱11.4B
Average progress
94.1%
Completion rate
82.0%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
14
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 203 | ₱7.5B | 52.7 | 13 | 90.2% |
| Region X | 91 | ₱2.2B | 37.6 | 0 | 100.0% |
| Region VII | 25 | ₱811.7M | 46.6 | 0 | 99.6% |
| Region IV-A | 10 | ₱397.5M | 52.1 | 0 | 100.0% |
| Region IV-B | 4 | ₱146.8M | 40.7 | 0 | 100.0% |
| Region XII | 2 | ₱173.6M | 60.3 | 1 | 98.5% |
| Negros Island Region | 2 | ₱111.5M | 58.7 | 0 | 100.0% |
| National Capital Region | 2 | ₱30.6M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 132 | ₱4.4B | 51.3 | 1 | 94.2% |
| Buildings and Facilities | 115 | ₱3B | 37.6 | 4 | 96.5% |
| Flood Control and Drainage | 50 | ₱2.2B | 55.2 | 0 | 97.2% |
| Water Provision and Storage | 18 | ₱759.2M | 47.4 | 0 | 100.0% |
| Bridges | 14 | ₱611.7M | 54.5 | 3 | 74.1% |
| OTHER | 7 | ₱289.2M | 78.6 | 4 | 80.6% |
| GAA 2025 OO-1 | 2 | ₱101.7M | 93.6 | 2 | 6.8% |
| GAA 2025 OO-2 | 1 | ₱48.2M | 90.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JE0024REPLACEMENT OF PERMANENT WEAK BRIDGES TUKURAN BR. (B01196MN) ALONG LANAO- PAGADIAN- ZAMBOANGA CITY RD. TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱57.8M | 3% | High risk94 | Flagged0.023 |
| 25J00112CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LABANGAN-MIDSALIP ROAD, ZAMBOANGA DEL SUR 1ST LD (PACKAGE 2) | Region IX | Region IX | On-Going | ₱43.9M | 11% | High risk93 | Flagged0.018 |
| 25JE0031CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/ CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG DAKU RIVER, BARANGAY LOWER STO. NIÑO, MAHAYAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.019 |
| 25JG0050CONCRETING OF BARANGAY TINA FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 33% | High risk88 | Flagged0.060 |
| 25JG0048CONCRETING OF BARANGAY ANONANG FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 80% | High risk88 | Flagged0.049 |
| 17J00075SHOULDER PAVING WITH DRAINAGE IMPROVEMENT AT IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD, K1751+(-602.00) TO K1769+693.00 (INTERMITTENT SECTIONS), ZAMBOANGA SIBUGAY (1ST DEO) | Region IX | Region IX | Completed | ₱87.8M | 100% | High risk79 | —-0.021 |
| 24M00069CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE II) BARANGAY LABU-O, STA. 42+561-STA. 42+811.95, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱86.8M | 100% | High risk79 | Flagged0.008 |
| 25JG0043CONSTRUCTION OF DPWH ZAMBOANGA DEL SUR 2ND DEO COMPOUND, BARANGAY POBLACION, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱39.2M | 52% | High risk76 | Flagged0.013 |
| 18JI0071CONSTRUCTION/ REHAB. OF WATER SYSTEM AT BRGY. NAGA-NAGA, ALICIA, Z.S | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱19.4M | 100% | High risk75 | —-0.027 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21J00019NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱95.7M | 70% | High risk73 | —-0.002 |
| 23J00095CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL AT TUKURAN RIVER, MILITAR BR. SECTION (B00470MN) (UPSTREAM - RIGHT SIDE), ALONG JCT. TUKURAN -JCT. KAROMATAN ROAD (S01103), TUKURAN, ZAMBOANGA DEL | Region IX | Region IX | On-Going | ₱105.8M | 85% | High risk73 | —-0.011 |
| 24J00040CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TUKURAN RIVER, MILITAR BR. SECTION (B00470MN), ALONG JCT. TUKURAN - JCT. KAROMATAN ROAD (S01103MN), ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱117.3M | 82% | High risk73 | —-0.015 |
| 19J00051CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF USUGAN FLOOD CONTROL, BRGY. TUNGAWAN, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Region IX | Completed | ₱101M | 100% | High risk72 | —-0.060 |
| 17J00186WATER SUPPLY & SANITATION FOR POVERTY AREAS & TOURISM PRIORITY SITES CONSTRUCTION OF VARIOUS WATER SUPPLY PROJECTS IN ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱115.9M | 100% | High risk72 | —-0.008 |
| 20DN0028CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF BANABA CREEK (PHASE 3), BRGY. SAN LUIS, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.058 |
| 24JE0017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LANGAPOD- BAGALUPA- GUBANG- MACASING ROAD (LANGAPOD BRIDGE), ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱96.4M | 70% | High risk71 | —-0.003 |
| 21J00064CONSTRUCTION OF MISSING LINKS/NEW ROADS ZAMBOANGA DEL SUR COASTAL ROAD (DUMALINAO - SAN PABLO SECTION) ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱97.2M | 100% | High risk70 | —-0.014 |
| 24J00124REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱109.4M | 30% | High risk70 | —-0.016 |
| 22JE0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD NETWORK AND DRAINAGE INSIDE REGIONAL GOVERNMENT CENTER, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱96.3M | 100% | High risk70 | —-0.062 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JG0050CONCRETING OF BARANGAY TINA FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 33% | High risk88 | Flagged0.060 |
| 25JG0048CONCRETING OF BARANGAY ANONANG FMR, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.5M | 80% | High risk88 | Flagged0.049 |
| 24J00251J. H. CERILLES STATE COLLEGE - COMPLETION OF ACADEMIC BUILDING, JHCSC PAGADIAN CAMPUS | Region IX | Region IX | On-Going | ₱24.9M | 25% | Medium risk38 | Flagged0.038 |
| 25JE0024REPLACEMENT OF PERMANENT WEAK BRIDGES TUKURAN BR. (B01196MN) ALONG LANAO- PAGADIAN- ZAMBOANGA CITY RD. TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱57.8M | 3% | High risk94 | Flagged0.023 |
| 23JF0094CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG LANAO - PAGADIAN - ZAMBOANGA CITY RD., IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | On-Going | ₱19.3M | 30% | Medium risk52 | Flagged0.019 |
| 25J00112CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LABANGAN-MIDSALIP ROAD, ZAMBOANGA DEL SUR 1ST LD (PACKAGE 2) | Region IX | Region IX | On-Going | ₱43.9M | 11% | High risk93 | Flagged0.018 |
| 25JE0028REPLACEMENT OF PERMANENT WEAK BRIDGES- PULACAN BR. (B00468MN) ALONG JCT. AURORA- MONTE ALEGRE- JCT. LABANGAN RD, PULACAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱29.4M | 1% | Medium risk59 | Flagged0.017 |
| 24J00252J. H. CERILLES STATE COLLEGE - CONSTRUCTION OF ACADEMIC BUILDING AT BIWANGAN, LAKEWOOD CAMPUS | Region IX | Region IX | On-Going | ₱22.9M | 36% | Medium risk45 | Flagged0.014 |
| 25JG0043CONSTRUCTION OF DPWH ZAMBOANGA DEL SUR 2ND DEO COMPOUND, BARANGAY POBLACION, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱39.2M | 52% | High risk76 | Flagged0.013 |
| 17JB0168CONSTRUCTION OF THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT SINDANGAN AGRICULTURAL SCHOOL, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱30M | 100% | Medium risk37 | Flagged0.008 |
| 24M00069CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE II) BARANGAY LABU-O, STA. 42+561-STA. 42+811.95, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱86.8M | 100% | High risk79 | Flagged0.008 |
| 25JE0044REPLACEMENT OF PERMANENT WEAK BRIDGES NAVALAN BR. (B00467MN) ALONG JCT. AURORA- MONTE ALEGRE- JCT. LABANGAN RD., NAVALAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱28.5M | 33% | Medium risk58 | Flagged0.007 |
| 24JE0052SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF DILUD BRIDGE, DUMINGAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱48.2M | 4% | Medium risk57 | Flagged0.007 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 24J00059CONSTRUCTION OF MISSING LINKS/NEW ROADS - LABANGAN - MIDSALIP ROAD, PACKAGE 1, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱27.9M | 32% | Medium risk53 | —-0.025 |
| 127 | 18JD0075CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, GUINLES (UPSTREAM) POLANCO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱29.4M | 100% | Medium risk53 | —-0.072 |
| 128 | 23JE0022NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- TERTIARY ROADS JCT. SWITCH- JCT. MONTE ALEGRE RD. K1642+(-135)- K1642+351, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱19.3M | 67% | Medium risk53 | —-0.032 |
| 129 | 20J00222CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS STRUCTURAL IMPROVEMENT OF PUBLIC BUILDING AND CONSTRUCTION OF EVACUATION CENTERS REGION IX, BRGY. DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱34.7M | 100% | Medium risk53 | —-0.014 |
| 130 | 23JE0024NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- PRIMARY ROADS, LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, K1651+724- K1652+047, K1656+460- K1657+007, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱19.1M | 100% | Medium risk53 | —-0.085 |
| 131 | 24JE0023PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LABANGAN RIVER, DIPAYA, LABANGAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk53 | —-0.073 |
| 132 | 20JE0055PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION OF USUGAN FLOOD CONTROL, BRGY. TUNGAWAN, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱43.2M | 100% | Medium risk53 | —-0.073 |
| 133 | 22JG0057FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DIPLO RIVER CONTROL, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱31.8M | 100% | Medium risk53 | —-0.070 |
| 134 | 22JE0023SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BONIAO- SANTA CRUZ- PUGWAN- SAN JOSE ROAD, MAHAYAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱16.4M | 100% | Medium risk53 | —-0.084 |
| 135 | 25JE0019BASIC INFRASTRUCTURE PROGRAM FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE, BARANGAY BALANGASAN, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱14.8M | 33% | Medium risk53 | —-0.018 |
| 136 | 24JE0022PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAPANGI RIVER BASIN, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk53 | —-0.073 |
| 137 | 23JG0022CONSTRUCTION OF NEW BRIDGES AT BOALAN BR. 1 ALONG KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD, BRGY. BOALAN, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱30.2M | 100% | Medium risk53 | —-0.050 |
| 138 | 23J00099CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - NRJ BOGAYO - BOLISONG - NEW TUBURAN - DATAGAN - MATING - POB GUIPOS, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱14.3M | 100% | Medium risk53 | —-0.043 |
| 139 | 19JI0046CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - NATIONAL ROAD JCT. LEADING TO PAYAO WHARF, PAYAO, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱23.7M | 100% | Medium risk53 | —-0.084 |
| 140 | 19JD0022CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE (REVETMENT/BANK PROTECTION) ALONG DIPOLOG RIVER, DAPDAP BRIDGE ALONG POLANCO-MACLEODES ROAD POLANCO,ZN | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱38.4M | 100% | Medium risk53 | —-0.074 |
| 141 | 23JE0017CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN RIVER, DIPAYA, LABANGAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱19.6M | 100% | Medium risk53 | —-0.067 |
| 142 | 24JE0041PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER CONTROL STRUCTURE, BARANGAY BALANGASAN, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.072 |
| 143 | 18JE0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL, STO. NIÑO, TUKURAN, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱23.4M | 100% | Medium risk52 | —-0.073 |
| 144 | 18EA0100CONSTRUCTION OF WATERSYSTEM (WATERWORKS), TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱92.7M | 100% | Medium risk52 | —-0.032 |
| 145 | 18JE0052CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF TUKURAN SEAWALL, TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱18.8M | 100% | Medium risk52 | —-0.073 |
| 146 | 18JE0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF DIPOLO FLOOD CONTROL SAGRADA FAMILIA, TAMBULIG, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱28M | 100% | Medium risk52 | —-0.073 |
| 147 | 18JE0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF DIPOLO FLOOD CONTROL, SAN VICENTE, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱28M | 100% | Medium risk52 | —-0.073 |
| 148 | 22JE0051SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CONTROL, BARANGAY STA. LUCIA, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱7.3M | 100% | Medium risk52 | —-0.068 |
| 149 | 21J00138PROPOSED CONSTRUCTION OF EVACUATION CENTER, MARGOSATUBIG, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱27.4M | 100% | Medium risk52 | —-0.023 |
| 150 | 19JE0006CONSTRUCTION OF PERMANENT BRIDGE TIMBABOY BRIDGE 2, ALONG EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG RD. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱31.8M | 100% | Medium risk52 | —-0.055 |