Opening the dossier…
Opening the dossier…
Contractor dossier
186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱15.8B
Average progress
94.7%
Completion rate
76.3%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
26
14.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 107 | ₱8.1B | 53.5 | 17 | 95.4% |
| Region VII | 53 | ₱5.8B | 60.1 | 7 | 92.6% |
| Region X | 26 | ₱1.9B | 54.6 | 2 | 96.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 69 | ₱5.9B | 52.3 | 4 | 97.4% |
| Roads | 50 | ₱4.3B | 48.6 | 2 | 97.2% |
| Bridges | 34 | ₱2.8B | 51.9 | 6 | 87.9% |
| OTHER | 17 | ₱1.7B | 76.7 | 8 | 96.3% |
| GAA 2025 OO-1 | 8 | ₱573.6M | 89.5 | 4 | 91.1% |
| Bridges, Roads | 5 | ₱459.7M | 55.0 | 0 | 80.0% |
| GAA 2025 SSP | 2 | ₱76.3M | 95.0 | 2 | 90.2% |
| Buildings and Facilities | 1 | ₱28.8M | 38.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00008PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1136+075-K1136+123, K1136+179-K1136+239, K1138+395-K1139+190 | Region XIII | Region XIII | On-Going | ₱19M | 85% | High risk95 | Flagged0.011 |
| 25NH0052CONSTRUCTION OF UNIDAD SEAWALL CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱57.4M | 96% | High risk95 | Flagged0.019 |
| 25NI0048PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1401 + 934 - K1405 + 934 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NI0040PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1401 + 916 - K1405 + 916 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25N00190MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1135+580 - K1135+731 | Region XIII | Region XIII | On-Going | ₱52.5M | 91% | High risk93 | —-0.003 |
| 25N00255GIBONG PARALLEL BR. (B002247MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱18.7M | 65% | High risk91 | Flagged0.014 |
| 25NG0039SURIGAO-DAVAO COASTAL RD - K1182+900 - K1183+962 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱19.6M | 100% | High risk91 | —-0.001 |
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 25NI0059PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1428+605 - K1432+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk89 | Flagged0.023 |
| 25NG0011ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS JCT. CAPALAYAN-CABONGBONGAN RD - K1136+(-317) - K1137+878CONTRACT LOCATION: BRGY. CAPALAYAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱39.2M | 100% | High risk84 | —-0.030 |
| 18N00052ROAD WIDENING, DAANG MAHARLIKA (AGUSAN-DAVAO SECT) - K1263+000-K1265+500, K1268+003-K1268+200, K1271+000-K1271+575, K1271+633-K1272+000, K1278+516- K1280+467, BAYUGAN CITY, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk80 | Flagged0.003 |
| 25NG0008ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - QUEZON - MAPAWA - CAPALAYAN - ESPINA - NAVARRO RD - K1131+000 - K1132+328.75/BRGY. MAPAWA, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱22.5M | 100% | High risk80 | —-0.029 |
| 17N00109CIRCUNFERENTIAL ROAD LEADING TO LAKE MAINIT (MAINIT-POBLACION-TAGBUYAWAN) INCLUDING TAPIAN BR. II, MAINIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱143.8M | 100% | High risk79 | —-0.007 |
| 22K00369CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ,CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 10, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱149.7M | 100% | High risk79 | —-0.008 |
| 24K00070CONST. OF BY-PASS AND DIVERSION ROAD, CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 14, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱127.2M | 98% | High risk78 | Flagged0.006 |
| 23HB0179RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0 | Region VII | Bohol 3rd DEO | On-Going | ₱241.2M | 78% | High risk78 | Flagged0.037 |
| 21N00009ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱112.1M | 100% | High risk78 | —-0.018 |
| 23K00086CONST. OF BY-PASS AND DIVERSION ROADS , CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), PACKAGE 7, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱107.9M | 95% | High risk78 | Flagged0.014 |
| 17N00087OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, DAANG MAHARLIKA (LIPATA - SURIGAO SECT.), K1116+000-K1120+200, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱58M | 100% | High risk77 | —-0.028 |
| 24N00103SIANIB BR. (B00908MN) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱50.7M | 74% | High risk77 | Flagged0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 24N00127CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, ANOMAR SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 100% | High risk69 | Flagged0.038 |
| 23HB0179RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0 | Region VII | Bohol 3rd DEO | On-Going | ₱241.2M | 78% | High risk78 | Flagged0.037 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 25NI0059PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1428+605 - K1432+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk89 | Flagged0.023 |
| 24N00096TAGO-LA PAZ BYPASS ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱144.2M | 26% | Medium risk51 | Flagged0.022 |
| 25NI0040PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1401 + 916 - K1405 + 916 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NI0048PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1401 + 934 - K1405 + 934 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NH0052CONSTRUCTION OF UNIDAD SEAWALL CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱57.4M | 96% | High risk95 | Flagged0.019 |
| 24H00133CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱192.8M | 0% | High risk64 | Flagged0.019 |
| 24N00103SIANIB BR. (B00908MN) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱50.7M | 74% | High risk77 | Flagged0.017 |
| 22NG0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMPO, BACUAG, SURIGAO DEL NORTE / BARANGAY CAMPO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Terminated | ₱33M | 100% | High risk76 | Flagged0.015 |
| 23K00086CONST. OF BY-PASS AND DIVERSION ROADS , CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), PACKAGE 7, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱107.9M | 95% | High risk78 | Flagged0.014 |
| 25N00255GIBONG PARALLEL BR. (B002247MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱18.7M | 65% | High risk91 | Flagged0.014 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
| 25N00008PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1136+075-K1136+123, K1136+179-K1136+239, K1138+395-K1139+190 | Region XIII | Region XIII | On-Going | ₱19M | 85% | High risk95 | Flagged0.011 |
| 25N00160TAGO-LA PAZ BYPASS ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱33.6M | 0% | Medium risk41 | Flagged0.010 |
| 25H00038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES | Region VII | Region VII | On-Going | ₱173.6M | 61% | High risk65 | Flagged0.008 |
| 23NG0090INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.), (SURIGAO DEL NORTE SIDE), SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱94.1M | 90% | Medium risk59 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22HO0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE ALONG VALENCIA RIVER (RIGHT SIDE), ALEGRIA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱48.7M | 100% | Medium risk51 | —-0.077 |
| 102 | 24N00148CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, POCTOY SECTION, PHASE 1, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk51 | —-0.061 |
| 103 | 23NG0042CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, TOGBONGON SECTION, SURIGAO CITY, SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.060 |
| 104 | 18KC0036CONSTRUCTION OF TALAKAG BYPASS ROAD INCLUDING ROW AND BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱58.2M | 100% | Medium risk50 | —-0.074 |
| 105 | 21N00097CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG HINAGASAN RIVER, BARANGAY MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱109M | 100% | Medium risk50 | —-0.055 |
| 106 | 23NG0041CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.062 |
| 107 | 18N00088ROAD WIDENING, SURIGAO - DAVAO COASTAL RD - K1428+660 - K1431+365, K1434+910 - K1437+057, K1442+714 - K1443+044, K1443+073 - K1443+659, K1457+096 - K1457+654, HINATUAN - BISLIG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱241.2M | 100% | Medium risk50 | —-0.040 |
| 108 | 22NG0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER / BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.061 |
| 109 | 23HB0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF WAHIG RIVER CONTROL, PHASE 2, SIERRA BOLLONES STA. 2+000-ST | Region VII | Bohol 3rd DEO | Completed | ₱77.2M | 100% | Medium risk50 | —-0.065 |
| 110 | 23NG0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER, BARANGAY QUEZON, SURIGAO CITY, SURIGAO DEL NORTE/ BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.060 |
| 111 | 25KH0073CONSTRUCTION OF BRIDGE AT CANITOAN ROAD, CAGAYAN DE ORO CITY, PACKAGE A | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱49.4M | 4% | Medium risk50 | —-0.001 |
| 112 | 23HN0091OO2:CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BRGY. DANGLAG TO BRGY. GARING, CONSOLACION, CEBU, PHASE 6 | Region VII | Cebu 6th DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.078 |
| 113 | 18N00046ROAD WIDENING, DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.) INCL. ROW, K1157+179-K1157+767, K1157+793-K1158+222, K1158+228-K1158+543, K1158+580 - K1160+784, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱133.6M | 100% | Medium risk49 | —-0.062 |
| 114 | 18NF0072CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CIRCUMFERENTIAL ROAD LEADING TO LAKE MAINIT, INCLUDING BRIDGE/BRGY. MATIN-AO, MAINIT, SURIGAO DEL NORTE, STA.0+033.10 - STA.0+709.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱81.2M | 100% | Medium risk48 | —-0.066 |
| 115 | 17ND0038ROAD UPGRADING ALONG BUTUAN CITY-PIANING-TANDAG ROAD K1244+093-K1244+1224, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱40M | 100% | Medium risk48 | —-0.052 |
| 116 | 22NE0052REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT-LORETO RD - K0026+000-K0027+100,K0027+850-K0027+990, BASILISA AND LIBJO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱96.4M | 100% | Medium risk47 | —-0.073 |
| 117 | 22NE0054REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT TO LORETO ROAD - K0027+100 - K0027+850, BASILISA, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱96.4M | 100% | Medium risk47 | —-0.073 |
| 118 | 23HO0170ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0171 + 200 - K0171 + 3 | Region VII | Cebu 7th DEO | Completed | ₱45.6M | 100% | Medium risk47 | —-0.094 |
| 119 | 19NG0049CONVERGENCE AND SPECIAL PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DESTINATIONS OF CIRCUMFERENTIAL ROAD LEADING LAKE MAINIT, PACKAGE 1 (CONSTRUCTION OF MAT-I BRIDGE) / MAINIT, SURIGAO DEL NORTE, STA.0+550.00 - STA.0+600.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱57.9M | 100% | Medium risk47 | —-0.042 |
| 120 | 22NG0030CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG HINAGASAN RIVER, BARANGAY MABUHAY, SISON, SURIGAO DEL NORTE/BRGY. MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk47 | —-0.056 |
| 121 | 25N00082CONSTRUCTION OF ROAD, SURIGAO CITY - SAN FRANCISCO, PACKAGE 1, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱74.4M | 26% | Medium risk47 | —-0.037 |
| 122 | 17K00331CONST. OF BY PASSES/DIVERSION ROADS,INCL. ROW,TALAKAG BY PASS ROAD, BUKIDNON 1ST LD | Region X | Region X | Completed | ₱48.4M | 100% | Medium risk47 | —-0.034 |
| 123 | 19KC0052WIDENING OF BRIDGE- KILISAWON BR. (B01441MN) ALONG MARAMAG-MARADUGAO RD., PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.063 |
| 124 | 19KC0054WIDENING OF BRIDGE- LANTAY BR. (B01442MN) ALONG MARAMAG-MARADUGAO RD., PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱21.3M | 100% | Medium risk46 | —-0.063 |
| 125 | 18ND0074ROAD WIDENING ALONG BUTUAN CITY-MALAYBALAY RD. INCLUDING ROW-K1245+130-K1247+190, K1249+451-K1251+050, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱93.5M | 100% | Medium risk46 | —-0.080 |