Contractor dossier
186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱15.8B
Average progress
94.7%
Completion rate
76.3%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
26
14.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 107 | ₱8.1B | 53.5 | 17 | 95.4% |
| Region VII | 53 | ₱5.8B | 60.1 | 7 | 92.6% |
| Region X | 26 | ₱1.9B | 54.6 | 2 | 96.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 69 | ₱5.9B | 52.3 | 4 | 97.4% |
| Roads | 50 | ₱4.3B | 48.6 | 2 | 97.2% |
| Bridges | 34 | ₱2.8B | 51.9 | 6 | 87.9% |
| OTHER | 17 | ₱1.7B | 76.7 | 8 | 96.3% |
| GAA 2025 OO-1 | 8 | ₱573.6M | 89.5 | 4 | 91.1% |
| Bridges, Roads | 5 | ₱459.7M | 55.0 | 0 | 80.0% |
| GAA 2025 SSP | 2 | ₱76.3M | 95.0 | 2 | 90.2% |
| Buildings and Facilities | 1 | ₱28.8M | 38.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00008PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1136+075-K1136+123, K1136+179-K1136+239, K1138+395-K1139+190 | Region XIII | Region XIII | On-Going | ₱19M | 85% | High risk95 | Flagged0.011 |
| 25NH0052CONSTRUCTION OF UNIDAD SEAWALL CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱57.4M | 96% | High risk95 | Flagged0.019 |
| 25NI0048PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1401 + 934 - K1405 + 934 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NI0040PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1401 + 916 - K1405 + 916 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25N00190MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1135+580 - K1135+731 | Region XIII | Region XIII | On-Going | ₱52.5M | 91% | High risk93 | —-0.003 |
| 25N00255GIBONG PARALLEL BR. (B002247MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱18.7M | 65% | High risk91 | Flagged0.014 |
| 25NG0039SURIGAO-DAVAO COASTAL RD - K1182+900 - K1183+962 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱19.6M | 100% | High risk91 | —-0.001 |
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 25NI0059PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1428+605 - K1432+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk89 | Flagged0.023 |
| 25NG0011ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS JCT. CAPALAYAN-CABONGBONGAN RD - K1136+(-317) - K1137+878CONTRACT LOCATION: BRGY. CAPALAYAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱39.2M | 100% | High risk84 | —-0.030 |
| 18N00052ROAD WIDENING, DAANG MAHARLIKA (AGUSAN-DAVAO SECT) - K1263+000-K1265+500, K1268+003-K1268+200, K1271+000-K1271+575, K1271+633-K1272+000, K1278+516- K1280+467, BAYUGAN CITY, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk80 | Flagged0.003 |
| 25NG0008ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - QUEZON - MAPAWA - CAPALAYAN - ESPINA - NAVARRO RD - K1131+000 - K1132+328.75/BRGY. MAPAWA, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱22.5M | 100% | High risk80 | —-0.029 |
| 17N00109CIRCUNFERENTIAL ROAD LEADING TO LAKE MAINIT (MAINIT-POBLACION-TAGBUYAWAN) INCLUDING TAPIAN BR. II, MAINIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱143.8M | 100% | High risk79 | —-0.007 |
| 22K00369CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ,CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 10, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱149.7M | 100% | High risk79 | —-0.008 |
| 24K00070CONST. OF BY-PASS AND DIVERSION ROAD, CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 14, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱127.2M | 98% | High risk78 | Flagged0.006 |
| 23HB0179RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0 | Region VII | Bohol 3rd DEO | On-Going | ₱241.2M | 78% | High risk78 | Flagged0.037 |
| 21N00009ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱112.1M | 100% | High risk78 | —-0.018 |
| 23K00086CONST. OF BY-PASS AND DIVERSION ROADS , CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), PACKAGE 7, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱107.9M | 95% | High risk78 | Flagged0.014 |
| 17N00087OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, DAANG MAHARLIKA (LIPATA - SURIGAO SECT.), K1116+000-K1120+200, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱58M | 100% | High risk77 | —-0.028 |
| 24N00103SIANIB BR. (B00908MN) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱50.7M | 74% | High risk77 | Flagged0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 24N00127CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, ANOMAR SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 100% | High risk69 | Flagged0.038 |
| 23HB0179RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0 | Region VII | Bohol 3rd DEO | On-Going | ₱241.2M | 78% | High risk78 | Flagged0.037 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 25NI0059PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1428+605 - K1432+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk89 | Flagged0.023 |
| 24N00096TAGO-LA PAZ BYPASS ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱144.2M | 26% | Medium risk51 | Flagged0.022 |
| 25NI0040PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1401 + 916 - K1405 + 916 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NI0048PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1401 + 934 - K1405 + 934 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk94 | Flagged0.020 |
| 25NH0052CONSTRUCTION OF UNIDAD SEAWALL CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱57.4M | 96% | High risk95 | Flagged0.019 |
| 24H00133CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱192.8M | 0% | High risk64 | Flagged0.019 |
| 24N00103SIANIB BR. (B00908MN) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱50.7M | 74% | High risk77 | Flagged0.017 |
| 22NG0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMPO, BACUAG, SURIGAO DEL NORTE / BARANGAY CAMPO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Terminated | ₱33M | 100% | High risk76 | Flagged0.015 |
| 23K00086CONST. OF BY-PASS AND DIVERSION ROADS , CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), PACKAGE 7, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱107.9M | 95% | High risk78 | Flagged0.014 |
| 25N00255GIBONG PARALLEL BR. (B002247MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱18.7M | 65% | High risk91 | Flagged0.014 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
| 25N00008PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1136+075-K1136+123, K1136+179-K1136+239, K1138+395-K1139+190 | Region XIII | Region XIII | On-Going | ₱19M | 85% | High risk95 | Flagged0.011 |
| 25N00160TAGO-LA PAZ BYPASS ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱33.6M | 0% | Medium risk41 | Flagged0.010 |
| 25H00038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES | Region VII | Region VII | On-Going | ₱173.6M | 61% | High risk65 | Flagged0.008 |
| 23NG0090INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.), (SURIGAO DEL NORTE SIDE), SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱94.1M | 90% | Medium risk59 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19NG0044PREVENTIVE MAINTENANCE SECONDARY ROADS ASPHALT OVERLAY (50MM. THK)/ALONG SURIGAO WHARF ROAD, (K1123+(-810) - K1123+466), BRGY. WASHINGTON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱70.3M | 100% | Medium risk46 | —-0.084 |
| 127 | 23NH0084REHABILITATION/RECONSTRUCTION OF SCOURED REVETMENT AT APPROACH B (UPSTREAM-RIGHT SIDE) ALONG SDCR/ TAGO - GAMUT BRIDGE, GAMUT-TAGO, SURIGAO DEL SUR STA. 0+000 - STA. 0+289.59 | Region XIII | Surigao del Sur 1st DEO | Completed | ₱92.1M | 100% | Medium risk46 | —-0.051 |
| 128 | 23NG0025PREVENTIVE MAINTENANCE - PRIMARY ROADS DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION)/DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), K1132+000.00 - K1133+930.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱77.4M | 100% | Medium risk46 | —-0.083 |
| 129 | 21NH0064SURIGAO-DAVAO COASTAL ROAD - K1220+200 - K1220+205, K1220+277 - K1223+700 | Region XIII | Surigao del Sur 1st DEO | Completed | ₱95M | 100% | Medium risk46 | —-0.074 |
| 130 | 18K00019WIDENING OF PERMANENT BR., BOLISONG BR.(B01300MN)ALONG BUTUAN CITY-CDO CITY-ILIGAN CITY RD.(PHASE II | Region X | Region X | Completed | ₱24.2M | 100% | Medium risk46 | —-0.062 |
| 131 | 22K00358CONSTRUCTION OF BY-PASS & DIVERSION ROADS CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱32.6M | 100% | Medium risk46 | —-0.085 |
| 132 | 22NG0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE / BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱86.8M | 100% | Medium risk46 | —-0.062 |
| 133 | 25N00179SAN PEDRO BR. (B00869MN) ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT) | Region XIII | Region XIII | On-Going | ₱67.4M | 46% | Medium risk45 | —-0.009 |
| 134 | 17K00032CONST. OF BYPASSES/DIVERSION RD,CDO COASTAL RD INCL. ROW 7 SLOPE PROT.,PACKAGE 2(LAPASAN SECT),CDOC | Region X | Region X | Completed | ₱90.7M | 100% | Medium risk45 | —-0.054 |
| 135 | 24HB0082ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - GABAYAN BR. (B00032BH) ALONG TAGBILARAN EAST RD (TAGBILARAN - JAGNA) K0163 + 921 | Region VII | Bohol 3rd DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.055 |
| 136 | 25HB0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES WAHIG BR. (B00092BH) ALONG JCT DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA RD | Region VII | Bohol 3rd DEO | Completed | ₱24.4M | 100% | Medium risk45 | —-0.054 |
| 137 | 24HB0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DAT-AN BR. (B00090BH) ALONG JCT DAT-AN - CARMEN - SIERRA BULLONES - PILAR - ALICIA RD K00062 + 085 | Region VII | Bohol 3rd DEO | Completed | ₱24.4M | 100% | Medium risk45 | —-0.056 |
| 138 | 21K00248CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON), PACKAGE 6, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱25.4M | 100% | Medium risk45 | —-0.096 |
| 139 | 17K00023CONST. OF BY PASSES/DIVERSION RDS,CDO-NEW WESTERN DIVERSION RD(CANITOAN CDO COASTAL RD),CDO INCL. BR | Region X | Region X | Completed | ₱82M | 100% | Medium risk45 | —-0.054 |
| 140 | 22N00105MAGTIACO BR. ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT), ALEGRIA, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱57.9M | 100% | Medium risk45 | —-0.044 |
| 141 | 17K00137CONST. OF BY PASSES/DIVERSION ROADS, CDO DIVERSION ROADS(JCT.BALUBAL SH-PUEBLO DE ORO),CDO OLD AIRPO | Region X | Region X | Completed | ₱85.3M | 100% | Medium risk45 | —-0.056 |
| 142 | 24HB0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES -NAUSOK BR. (B00048BH) ALONG TAGBILARAN EAST RD (TAGBILARAN - JAGNA) K194+803 | Region VII | Bohol 3rd DEO | Completed | ₱5.8M | 100% | Medium risk45 | —-0.055 |
| 143 | 23KH0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IPONAN RIVER, CAGAYAN DE ORO CITY, PACKAGE 7 | Region X | Cagayan de Oro City 1st DEO | Completed | ₱24.4M | 100% | Medium risk45 | —-0.080 |
| 144 | 24KH0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN DE ORO RIVER (SECTION 4), BARANGAY BALULANG, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱24.8M | 100% | Medium risk45 | —-0.081 |
| 145 | 22N00144ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱50.2M | 100% | Medium risk45 | —-0.072 |
| 146 | 24NE0023CONSTRUCTION OF MAGSAYSAY RIVER REVETMENT, BARANGAY MAGSAYSAY, DINAGAT, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱72.4M | 100% | Medium risk45 | —-0.067 |
| 147 | 19NG0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION CIRCUMFERENTIAL ROAD LEADING LAKE MAINIT, PACKAGE 2 (CONSTRUCTION OF MATIN-AO BRIDGE) / MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱36.7M | 100% | Medium risk44 | —-0.049 |
| 148 | 24NG0022INSTALLATION OF ROAD SAFETY DEVICES AND STREET LIGHTS ALONG SURIGAO-DAVAO COASTAL RD - K1162+000 - K1164+549, BACUAG, SURIGAO DEL NORTE/BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱54M | 100% | Medium risk44 | —-0.085 |
| 149 | 19NG0050CONVERGENCE AND SPECIAL PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS OF CIRCUMFERENTIAL ROAD LEADING LAKE MAINIT, PACKAGE 3 (CONSTRUCTION OF TOLINGON BRIDGE) / MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱26.9M | 100% | Medium risk43 | —-0.051 |
| 150 | 20NH0040SURIGAO-DAVAO COASTAL ROAD - K1213+396 - K1215+396 (ROAD WIDENING), CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱78.3M | 100% | Medium risk43 | —-0.081 |