Contractor dossier
59 projects on file, including joint ventures this contractor is part of.
Total projects
59
Total budget
₱661.9M
Average progress
97.9%
Completion rate
76.3%
Average risk score
52.5
Medium risk on average, out of 100
Flagged as unusual
7
11.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 59 | ₱661.9M | 52.5 | 7 | 97.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 23 | ₱223.5M | 45.8 | 0 | 100.0% |
| Roads | 20 | ₱218.5M | 50.5 | 0 | 100.0% |
| Water Provision and Storage | 4 | ₱14.4M | 28.9 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱23.2M | 95.5 | 3 | 66.2% |
| OTHER | 3 | ₱38.4M | 82.4 | 3 | 95.7% |
| Flood Control and Drainage | 3 | ₱43.4M | 49.6 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱93.8M | 93.5 | 1 | 95.9% |
| Bridges | 1 | ₱6.8M | 46.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
| 25PB0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, DANGLA ELEMENTARY SCHOOL, DANGLA-KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.8M | 65% | High risk95 | Flagged0.019 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 25PB0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, ABBUT-CONNER RD-K0548+630-K0548+702 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱27.2M | 99% | High risk93 | —-0.003 |
| 24PB0063BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND: CONSTRUCTION OF 2STY6CL WITH LABORATORY, CONNER NATIONAL HS, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.4M | 97% | High risk88 | Flagged0.049 |
| 25PB0037CONCRETING OF SITIO GASSUD, BRGY. KARIKITAN TO SITIO GANGAN, BRGY. MAWIGUE FMR, BRGY. KARIKITAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱14.6M | 90% | High risk88 | Flagged0.048 |
| 24PB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD- K0577+369-K0589+497, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | High risk71 | Flagged0.007 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0063BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND: CONSTRUCTION OF 2STY6CL WITH LABORATORY, CONNER NATIONAL HS, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.4M | 97% | High risk88 | Flagged0.049 |
| 25PB0037CONCRETING OF SITIO GASSUD, BRGY. KARIKITAN TO SITIO GANGAN, BRGY. MAWIGUE FMR, BRGY. KARIKITAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱14.6M | 90% | High risk88 | Flagged0.048 |
| 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
| 25PB0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, DANGLA ELEMENTARY SCHOOL, DANGLA-KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.8M | 65% | High risk95 | Flagged0.019 |
| 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 24PB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD- K0577+369-K0589+497, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | High risk71 | Flagged0.007 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 2 | 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
| 3 | 25PB0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, DANGLA ELEMENTARY SCHOOL, DANGLA-KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.8M | 65% | High risk95 | Flagged0.019 |
| 4 | 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 5 | 25PB0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, ABBUT-CONNER RD-K0548+630-K0548+702 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱27.2M | 99% | High risk93 | —-0.003 |
| 6 | 24PB0063BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND: CONSTRUCTION OF 2STY6CL WITH LABORATORY, CONNER NATIONAL HS, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.4M | 97% | High risk88 | Flagged0.049 |
| 7 | 25PB0037CONCRETING OF SITIO GASSUD, BRGY. KARIKITAN TO SITIO GANGAN, BRGY. MAWIGUE FMR, BRGY. KARIKITAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱14.6M | 90% | High risk88 | Flagged0.048 |
| 8 | 24PB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD- K0577+369-K0589+497, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | High risk71 | Flagged0.007 |
| 9 | 20PC0045CONSTRUCTION OF 2 CLASSROOMS SCHOOL BUILDING, BUCAROT PRIMARY SCHOOL, BUCAROT, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk56 | —-0.074 |
| 10 | 23PB0022LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE/ FACILITIES, CONSTRUCTION (COMPLETION) OF DPWH BUILDING APAYAO 1ST DISTRICT ENGINEERING OFFICE, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱38M | 100% | Medium risk56 | —-0.072 |
| 11 | 22PB0025BASIC INFRASTRUCTURE PROGRAM(BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY WAGA,KABUGAO,APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱4.8M | 100% | Medium risk56 | —-0.075 |
| 12 | 19PC0087CONSTRUCTION OF POBLACION MPB, POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.7M | 100% | Medium risk55 | —-0.070 |
| 13 | 20PC0011NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD K0649+000-K0651+000, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱15.6M | 100% | Medium risk55 | —-0.070 |
| 14 | 20PC0031CONSTRUCTION OF MULTI PURPOSE BUILDING (CALANASAN MPB), POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.3M | 100% | Medium risk55 | —-0.068 |
| 15 | 19PC0046CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES DONA LORETA-LYDIA ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, PINEAPPLE, BANANA, VEGETABLES RICE AND CORN INDUSTRIES, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk55 | —-0.071 |
| 16 | 20PC0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES DOÑA LORETA-LYDIA ROAD IN SUPPORT OF FURNITURE, HANDICRAFT, LOOMWEAVING,BLACKSMITHING, PINEAPPLE, BANANA, ROOTCROPS, RICE AND CORN INDUSTRIES, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.078 |
| 17 | 21PB0017LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (ASSOCIATION OF BARANGAY CAPTAINS), CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱4.9M | 100% | Medium risk55 | —-0.079 |
| 18 | 19PC0004ASSET PRESERVATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, TERTIARY ROADS, AYAGA-STA. MARCELA-FLORA-LASAM ROAD, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.5M | 100% | Medium risk54 | —-0.074 |
| 19 | 20PC0005CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES ,INDUSTRIES AND ECONOMIC ZONES, DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE,PINEAPPLE,BANANA,VEGETABLES,RICE AND CORN IDNSUTRIES | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk54 | —-0.072 |
| 20 | 19PC0045CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, BANANA,VEGETABLES RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk54 | —-0.070 |
| 21 | 19PC0082COMPLETION OF NATIONAL GOVERNMENT CENTER BUILDING, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.3M | 100% | Medium risk53 | —-0.069 |
| 22 | 22PC0019CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) TUROD-BAYUGAO ROAD LEADING TO BAYUGAO WATERFALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5.9M | 100% | Medium risk52 | —-0.075 |
| 23 | 20PC0006CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION KABANGWELAN ROAD LEADING TO VILLAMOR FALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk52 | —-0.077 |
| 24 | 19PC0040CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION KABANGWELAN ROAD LEADING TO VILLAMOR FALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱17.1M | 100% | Medium risk52 | —-0.076 |
| 25 | 22PC0069LOCAL-PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES-CONSTRUCTION (COMPLETION) OF AREA SHOP BUILDING, DPWH APAYAO 2ND DEO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.7M | 100% | Medium risk52 | —-0.071 |