Contractor dossier
46 projects on file, including joint ventures this contractor is part of.
Total projects
46
Total budget
₱3.5B
Average progress
88.6%
Completion rate
54.3%
Below 70%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
3
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 28 | ₱2.7B | 57.6 | 3 | 93.8% |
| National Capital Region | 13 | ₱188.4M | 44.2 | 0 | 92.3% |
| Region V | 5 | ₱607.7M | 61.0 | 0 | 49.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 20 | ₱2.2B | 67.1 | 2 | 91.4% |
| Roads | 13 | ₱848.9M | 38.4 | 0 | 80.5% |
| Buildings and Facilities | 9 | ₱80.2M | 43.8 | 0 | 88.9% |
| OTHER | 2 | ₱284.3M | 74.4 | 1 | 100.0% |
| Bridges | 2 | ₱56.1M | 53.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00465FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 5, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱135.1M | 98% | High risk80 | —-0.013 |
| 24C00466FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 6, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱135.1M | 100% | High risk80 | —-0.041 |
| 24CL0188CONSTRUCTION OF BAYTO RIVER CAPACITY ENHANCEMENT STRUCTURE UPSTREAM, STA. CRUZ, ZAMBALES (PHASE 3) | Region III | Zambales 1st DEO | On-Going | ₱97.7M | 90% | High risk80 | —-0.010 |
| 24CL0191CONSTRUCTION OF UACON RIVER CAPACITY ENHANCEMENT STRUCTURE, STA. CRUZ, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 91% | High risk80 | —-0.010 |
| 24C00464FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE V | Region III | Region III | On-Going | ₱133M | 51% | High risk80 | Flagged0.001 |
| 24C00467FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 7, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱130.3M | 100% | High risk80 | —-0.041 |
| 24C00469FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 9, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱114M | 76% | High risk80 | —-0.010 |
| 24C00468FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 8, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱114M | 76% | High risk80 | —-0.010 |
| 24C00463FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE IV | Region III | Region III | On-Going | ₱132.9M | 61% | High risk80 | Flagged0.000 |
| 24C00462FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN RIVER), BRGY. SIBUL, SAN MIGUEL, BULACAN PHASE III | Region III | Region III | On-Going | ₱132.9M | 91% | High risk80 | —-0.012 |
| 18C00006NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), INCLUDING ROW, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱144.3M | 100% | High risk76 | Flagged0.007 |
| 24CC0172CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY CATULINAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 24F00400CLUSTER IV-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-IV-I: DAANG MAHARLIKA (LZ) K0500+000-K0500+220, K0500+702-K0501+000, K0501+720-K0502+140, K0506+391.28-K0506+861, K0 | Region V | Region V | On-Going | ₱408.7M | 11% | High risk74 | —-0.005 |
| 18CD0185CONSTRUCTION OF BY-PASS/DIVERSION ROAD, CANDABA SAN MIGUEL BY-PASS ROAD, PACKAGE 1, INCL. ROW, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱140M | 100% | High risk73 | —-0.019 |
| 24F00016CLUSTER VI-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-VI-I: DAANG MAHARLIKA (LZ)-K0513+870-K0513+966, K0514+000-K0514+440, K0518+706-K0519+000; VI-II: DAANG MAHARLIKA (LZ | Region V | Region V | On-Going | ₱120.7M | 26% | High risk70 | —-0.034 |
| 24C00025FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES | Region III | Region III | On-Going | ₱193M | 98% | High risk63 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18C00006NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), INCLUDING ROW, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱144.3M | 100% | High risk76 | Flagged0.007 |
| 24C00464FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE V | Region III | Region III | On-Going | ₱133M | 51% | High risk80 | Flagged0.001 |
| 24C00463FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE IV | Region III | Region III | On-Going | ₱132.9M | 61% | High risk80 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24C00465FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 5, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱135.1M | 98% | High risk80 | —-0.013 |
| 2 | 24C00466FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 6, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱135.1M | 100% | High risk80 | —-0.041 |
| 3 | 24CL0188CONSTRUCTION OF BAYTO RIVER CAPACITY ENHANCEMENT STRUCTURE UPSTREAM, STA. CRUZ, ZAMBALES (PHASE 3) | Region III | Zambales 1st DEO | On-Going | ₱97.7M | 90% | High risk80 | —-0.010 |
| 4 | 24CL0191CONSTRUCTION OF UACON RIVER CAPACITY ENHANCEMENT STRUCTURE, STA. CRUZ, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 91% | High risk80 | —-0.010 |
| 5 | 24C00464FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE V | Region III | Region III | On-Going | ₱133M | 51% | High risk80 | Flagged0.001 |
| 6 | 24C00467FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 7, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱130.3M | 100% | High risk80 | —-0.041 |
| 7 | 24C00469FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 9, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱114M | 76% | High risk80 | —-0.010 |
| 8 | 24C00468FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 8, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱114M | 76% | High risk80 | —-0.010 |
| 9 | 24C00463FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE IV | Region III | Region III | On-Going | ₱132.9M | 61% | High risk80 | Flagged0.000 |
| 10 | 24C00462FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALAONG RIVER (SITIO BROWN RIVER), BRGY. SIBUL, SAN MIGUEL, BULACAN PHASE III | Region III | Region III | On-Going | ₱132.9M | 91% | High risk80 | —-0.012 |
| 11 | 18C00006NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), INCLUDING ROW, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱144.3M | 100% | High risk76 | Flagged0.007 |
| 12 | 24CC0172CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY CATULINAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 13 | 24F00400CLUSTER IV-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-IV-I: DAANG MAHARLIKA (LZ) K0500+000-K0500+220, K0500+702-K0501+000, K0501+720-K0502+140, K0506+391.28-K0506+861, K0 | Region V | Region V | On-Going | ₱408.7M | 11% | High risk74 | —-0.005 |
| 14 | 18CD0185CONSTRUCTION OF BY-PASS/DIVERSION ROAD, CANDABA SAN MIGUEL BY-PASS ROAD, PACKAGE 1, INCL. ROW, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱140M | 100% | High risk73 | —-0.019 |
| 15 | 24F00016CLUSTER VI-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-VI-I: DAANG MAHARLIKA (LZ)-K0513+870-K0513+966, K0514+000-K0514+440, K0518+706-K0519+000; VI-II: DAANG MAHARLIKA (LZ | Region V | Region V | On-Going | ₱120.7M | 26% | High risk70 | —-0.034 |
| 16 | 24C00025FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES | Region III | Region III | On-Going | ₱193M | 98% | High risk63 | —-0.022 |
| 17 | 23C00230FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱94.9M | 100% | Medium risk58 | —-0.079 |
| 18 | 18C00061FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF ERODED PAMPANGA RIVER BANK (SAN JOSE, SAN SIMON AND SUCAD, APALIT SECTION) PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱193M | 100% | Medium risk58 | —-0.048 |
| 19 | 23C00229FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 20 | 23C00187FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk57 | —-0.076 |
| 21 | 21F00067OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-PAGSANGAHAN BR. (B02731LZ) ALONG DAANG MAHARLIKA (LZ), BASUD, CAMARINES NORTE 2ND LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱49.2M | 100% | Medium risk55 | —-0.052 |
| 22 | 25F00159ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY -K0274+954-K0275+150, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱22.2M | 10% | Medium risk54 | —-0.046 |
| 23 | 18C00042CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES-SAN ILDEFONSO-RR STA. AKLE RD. CONNECTING OLD CAGAYAN VALLEY RD. & PULONG SAMPALOC-AKLE-BUASAW RD. IN SUPPORT OF THE AGRIBUSINESSES, DR | Region III | Region III | Completed | ₱166.1M | 100% | Medium risk54 | —-0.060 |
| 24 | 18OA0031CONST./SEALING OF RIVERWALL ALONG SANTULAN RIVER (STA.2+454.50 TO SAT.2+901.50) FR. WOMEN'S HOSPITAL | National Capital Region | Malabon-Navotas DEO | Completed | ₱69.7M | 100% | Medium risk53 | —-0.075 |
| 25 | 21FC0137REPLACEMENT OF PERMANENT WEAK BRIDGES, MAMPAOD BRIDGE (B02721LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. SAN ISIDRO, TALISAY, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱6.9M | 100% | Medium risk53 | —-0.056 |