Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱7.7B
Average progress
98.1%
Completion rate
89.6%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
7
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 118 | ₱7B | 51.7 | 7 | 97.8% |
| Region I | 12 | ₱616.8M | 48.7 | 0 | 100.0% |
| Region III | 3 | ₱66.8M | 30.9 | 0 | 100.0% |
| Region II | 1 | ₱41.1M | 53.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.2B | 47.8 | 0 | 99.2% |
| Flood Control and Drainage | 31 | ₱1.8B | 48.5 | 0 | 99.6% |
| GAA 2025 OO-2 | 7 | ₱802.3M | 92.1 | 7 | 74.5% |
| Buildings and Facilities | 7 | ₱231.1M | 53.6 | 0 | 100.0% |
| Bridges | 6 | ₱196.1M | 51.8 | 0 | 100.0% |
| Water Provision and Storage | 6 | ₱383.7M | 51.1 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱68.6M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 25PD0033CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788 | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱139.8M | 97% | High risk64 | —-0.013 |
| 24PD0027CONTRACT PACKAGE 5: CONST./REH. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG: A. ASIN GALLANO RIVER B. BALILI RIVER | Cordillera Administrative Region | Baguio City DEO | Completed | ₱145.5M | 100% | High risk64 | —-0.044 |
| 23PD0057CONTRACT PACKAGE 4: CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG: A. BUED RIVER (MAIN), STA. 3+930-STA. 4+615, B. BUED RIVER (TRIBUTARIES), STA. 0+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱126.2M | 100% | High risk63 | —-0.049 |
| 25PD0035CONTRACT PACKAGE 2: CONST/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG A) BUED RIVER (MAIN) STA. 0+050 -STA. 0+170 B) BUED RIVER (TRIBUTARIES) STA. 0+520-STA. 0+580, | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱118.5M | 91% | High risk63 | —-0.021 |
| 21PD0074CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS): CONSTRUCTION OF PMA ACCESS ROAD FROM GLOBE TOWER TO SAO AREA, PHILIPPINE MILITARY ACADEMY, FORT | Cordillera Administrative Region | Baguio City DEO | Completed | ₱72.4M | 100% | High risk62 | —-0.043 |
| 17PD0004CONTRACT PACKAGE 1: ASSET PRES OF NAT'L RDS. REH/RECONST OF NAT'L RDS. W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A) KENNON RD KO242+510-KO242+740 B) QUIRINO H-WAY (BAGUIO-BAUANG) KO299+(-105) C) EASTERNLINK CIRCUM. RD. KO249+467-KO249+510; KO247+976-KO248+ | Cordillera Administrative Region | Baguio City DEO | Completed | ₱62.6M | 100% | High risk62 | —-0.047 |
| 20PD0022CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG ABAD SANTOS DRIVE TO LAKE DRIVE TO PERFECTO ST. AND HARRISON ROAD, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24PD0024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ASIN-GALLANO RIVER STA. 0+000, STA. 0+400, STA. 2+810-STA. 3+000, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 22PD0024CONTRACT PACKAGE 5: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) A. CONST. OF CONCRETE ROAD FROM TMC TO TOWER 66 AREA, PMA B. CONST. OF PMA ROAD | Cordillera Administrative Region | Baguio City DEO | Completed | ₱49M | 100% | High risk61 | —-0.047 |
| 18A00075REPLACEMENT OF PERMANENT WEAK BRIDGES - SUSO BRIDGE (B00627LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱93.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 2 | 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 3 | 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 4 | 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 5 | 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 6 | 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 7 | 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 8 | 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 9 | 25PD0033CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788 | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱139.8M | 97% | High risk64 | —-0.013 |
| 10 | 24PD0027CONTRACT PACKAGE 5: CONST./REH. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG: A. ASIN GALLANO RIVER B. BALILI RIVER | Cordillera Administrative Region | Baguio City DEO | Completed | ₱145.5M | 100% | High risk64 | —-0.044 |
| 11 | 23PD0057CONTRACT PACKAGE 4: CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG: A. BUED RIVER (MAIN), STA. 3+930-STA. 4+615, B. BUED RIVER (TRIBUTARIES), STA. 0+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱126.2M | 100% | High risk63 | —-0.049 |
| 12 | 25PD0035CONTRACT PACKAGE 2: CONST/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG A) BUED RIVER (MAIN) STA. 0+050 -STA. 0+170 B) BUED RIVER (TRIBUTARIES) STA. 0+520-STA. 0+580, | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱118.5M | 91% | High risk63 | —-0.021 |
| 13 | 21PD0074CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS): CONSTRUCTION OF PMA ACCESS ROAD FROM GLOBE TOWER TO SAO AREA, PHILIPPINE MILITARY ACADEMY, FORT | Cordillera Administrative Region | Baguio City DEO | Completed | ₱72.4M | 100% | High risk62 | —-0.043 |
| 14 | 17PD0004CONTRACT PACKAGE 1: ASSET PRES OF NAT'L RDS. REH/RECONST OF NAT'L RDS. W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A) KENNON RD KO242+510-KO242+740 B) QUIRINO H-WAY (BAGUIO-BAUANG) KO299+(-105) C) EASTERNLINK CIRCUM. RD. KO249+467-KO249+510; KO247+976-KO248+ | Cordillera Administrative Region | Baguio City DEO | Completed | ₱62.6M | 100% | High risk62 | —-0.047 |
| 15 | 20PD0022CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG ABAD SANTOS DRIVE TO LAKE DRIVE TO PERFECTO ST. AND HARRISON ROAD, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 16 | 24PD0024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ASIN-GALLANO RIVER STA. 0+000, STA. 0+400, STA. 2+810-STA. 3+000, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 17 | 22PD0024CONTRACT PACKAGE 5: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) A. CONST. OF CONCRETE ROAD FROM TMC TO TOWER 66 AREA, PMA B. CONST. OF PMA ROAD | Cordillera Administrative Region | Baguio City DEO | Completed | ₱49M | 100% | High risk61 | —-0.047 |
| 18 | 18A00075REPLACEMENT OF PERMANENT WEAK BRIDGES - SUSO BRIDGE (B00627LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱93.5M | 100% | High risk61 | —-0.030 |
| 19 | 23PD0001CONTRACT PACKAGE 1: A. PREVENTIVE MAINTENANCE -SECONDARY ROADS: 1. ASIN RD. K0305+(-535), K0305+000-K0306+541, (S04722LZ) CHAINAGE 000-CHAINAGE 1552. LOAKAN RD. K0249+875-K0250+096, K0250+380-K0250+842 3. MAGSAYSAY AVE (TRINIDAD RD) - (S00522LZ) CHAINAGE | Cordillera Administrative Region | Baguio City DEO | Completed | ₱138.1M | 100% | Medium risk59 | —-0.061 |
| 20 | 24PD0026CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM: CONSTRUCTION OF PMA RAINWATER HARVESTING FACILITIES PHASE III, PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.041 |
| 21 | 21P00014CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY - CONSTRUCTION OF RAIN HARVESTING AND TREATMENT FACILITY (PHASE II), BUSOL WATERSHED, AMBOING, BAGUIO CITY | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱97.3M | 100% | Medium risk58 | —-0.037 |
| 22 | 19PE0026CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF GRAVEL ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDADITOGON-SABLAN-TUBA & TUBLAY (BLISTT), KAMOG JCT.-CALOT-PAPPA-BAGONG-BALLUAY-TUEL JCT. (SECTION 2 OF BLISTT OUTER RING CIRCUMFERENTIAL R | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱95.1M | 100% | Medium risk58 | —-0.075 |
| 23 | 18P00003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD., K0678+899 - K0682+045 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱159.8M | 100% | Medium risk58 | —-0.049 |
| 24 | 18PF0035ASSET PRESERVATION PREVENTIVE MAINTENANCE ALONG SECONDARY ROAD - BAGUIO-BONTOC ROAD, K0296+933 - K0297+600, K0297+900 - K0298+400, K0298+907 - K0299+126, K0299+750 - K0299+820, K0302+121 - K0302+487, K0302+660 - K0303+073, K0303+180 - K0303+210, K0304+6 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱94.3M | 100% | Medium risk58 | —-0.069 |
| 25 | 20P00019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱133M | 100% | Medium risk57 | —-0.065 |