Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱7.7B
Average progress
98.1%
Completion rate
89.6%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
7
5.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 118 | ₱7B | 51.7 | 7 | 97.8% |
| Region I | 12 | ₱616.8M | 48.7 | 0 | 100.0% |
| Region III | 3 | ₱66.8M | 30.9 | 0 | 100.0% |
| Region II | 1 | ₱41.1M | 53.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.2B | 47.8 | 0 | 99.2% |
| Flood Control and Drainage | 31 | ₱1.8B | 48.5 | 0 | 99.6% |
| GAA 2025 OO-2 | 7 | ₱802.3M | 92.1 | 7 | 74.5% |
| Buildings and Facilities | 7 | ₱231.1M | 53.6 | 0 | 100.0% |
| Bridges | 6 | ₱196.1M | 51.8 | 0 | 100.0% |
| Water Provision and Storage | 6 | ₱383.7M | 51.1 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱68.6M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 25PD0033CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788 | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱139.8M | 97% | High risk64 | —-0.013 |
| 24PD0027CONTRACT PACKAGE 5: CONST./REH. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG: A. ASIN GALLANO RIVER B. BALILI RIVER | Cordillera Administrative Region | Baguio City DEO | Completed | ₱145.5M | 100% | High risk64 | —-0.044 |
| 23PD0057CONTRACT PACKAGE 4: CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG: A. BUED RIVER (MAIN), STA. 3+930-STA. 4+615, B. BUED RIVER (TRIBUTARIES), STA. 0+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱126.2M | 100% | High risk63 | —-0.049 |
| 25PD0035CONTRACT PACKAGE 2: CONST/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG A) BUED RIVER (MAIN) STA. 0+050 -STA. 0+170 B) BUED RIVER (TRIBUTARIES) STA. 0+520-STA. 0+580, | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱118.5M | 91% | High risk63 | —-0.021 |
| 21PD0074CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS): CONSTRUCTION OF PMA ACCESS ROAD FROM GLOBE TOWER TO SAO AREA, PHILIPPINE MILITARY ACADEMY, FORT | Cordillera Administrative Region | Baguio City DEO | Completed | ₱72.4M | 100% | High risk62 | —-0.043 |
| 17PD0004CONTRACT PACKAGE 1: ASSET PRES OF NAT'L RDS. REH/RECONST OF NAT'L RDS. W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A) KENNON RD KO242+510-KO242+740 B) QUIRINO H-WAY (BAGUIO-BAUANG) KO299+(-105) C) EASTERNLINK CIRCUM. RD. KO249+467-KO249+510; KO247+976-KO248+ | Cordillera Administrative Region | Baguio City DEO | Completed | ₱62.6M | 100% | High risk62 | —-0.047 |
| 20PD0022CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG ABAD SANTOS DRIVE TO LAKE DRIVE TO PERFECTO ST. AND HARRISON ROAD, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24PD0024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ASIN-GALLANO RIVER STA. 0+000, STA. 0+400, STA. 2+810-STA. 3+000, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 22PD0024CONTRACT PACKAGE 5: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) A. CONST. OF CONCRETE ROAD FROM TMC TO TOWER 66 AREA, PMA B. CONST. OF PMA ROAD | Cordillera Administrative Region | Baguio City DEO | Completed | ₱49M | 100% | High risk61 | —-0.047 |
| 18A00075REPLACEMENT OF PERMANENT WEAK BRIDGES - SUSO BRIDGE (B00627LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱93.5M | 100% | High risk61 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22PD0004CONTRACT PACKAGE 1: REHAB/RECONST OF ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS: A. ASIN RD. K0308+917-K0308+940; K0309+465-K0309+525 B. PMA CUT-OFF RD. 1 K0252+(-556)-K0252+(-492) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱43.4M | 100% | Medium risk45 | —-0.082 |
| 102 | 19PD0001CONT. PACKAGE 2: PREV. MAINT. OF RD.: ASPH OVERLAY ALONG A) QUEZON HILL RD #1 B) MILITARY CUT-OFF RD (S00440LZ) C) PMA RD (S00467LZ) D) RIMANDO-AMBIONG RD. (S00519LZ) E) ENGR'S HILL F) MAGSAYSAY G) LOAKAN RD | Cordillera Administrative Region | Baguio City DEO | Completed | ₱35.1M | 100% | Medium risk45 | —-0.082 |
| 103 | 24PD0011REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-KISAD RD-K0249+047-K0249+203 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱31.5M | 100% | Medium risk45 | —-0.083 |
| 104 | 18PD0049FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG ASIN-GALLANO RIVER, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱37.2M | 100% | Medium risk44 | —-0.065 |
| 105 | 19PD0008CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (TRIBUTARIES), BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.064 |
| 106 | 20PD0018CONTRACT PACKAGE 2: A) CONST/REH OF FLOOD MIT. FACILITIES W/IN MAJ. RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MIT. FACILITIES ALONG BALILI RIVER(MAIN), BAGUIO CITY B) CONST./MAINT OF FLOOD MITIGATION STRUCT. AND DRAINAGE SYSTEM-BALILI RIVER (TRIB) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱42.2M | 100% | Medium risk44 | —-0.065 |
| 107 | 19PD0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (MAIN), BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱44.8M | 100% | Medium risk44 | —-0.065 |
| 108 | 18PD0040FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION/DRAINAGE SYSTEM ALONG BUED RIVER INCLDG ITS TRIBUTARIES, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱46.4M | 100% | Medium risk44 | —-0.065 |
| 109 | 20PD0109REHABILITATION OF DAMAGED REVETMENT WALL ALONG BUED RIVER NEAR LION'S HEAD, CAMP 7, BAGUIO CITY, STA. 0+000-STA. 0+291 (CATEGORIZED AS PRIORITY I), WHICH WAS DAMAGED BY TYPHOON OMPONG | Cordillera Administrative Region | Baguio City DEO | Completed | ₱38.1M | 100% | Medium risk44 | —-0.068 |
| 110 | 18PD0003ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: QUIRINO HIGHWAY (BAGUIO-BAGUIO), KO299+(-272)-KO299+(-148); KO299+(-430)-KO299+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱38.9M | 100% | Medium risk44 | —-0.081 |
| 111 | 20PD0115LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-MAJOR MANE-KENNON ROAD (BYPASS), CH 0+110-CH. 0+166 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱24.8M | 100% | Medium risk44 | —-0.068 |
| 112 | 21PD0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS: PMA RD. K0249+510-K0249+598 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱20.5M | 100% | Medium risk44 | —-0.082 |
| 113 | 20PD0014CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAJOR MANE AND KENNON ROAD BYPASS ROAD, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.084 |
| 114 | 20PD0111LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-MAGSAYSAY AVE. (TRINIDAD ROAD) - K0252+366 TO K0252+441 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱19.8M | 100% | Medium risk44 | —-0.084 |
| 115 | 20PD0121CONTRACT PACKAGE 5: PREVENTIVE MAINTENANCE: A) LOAKAN RD. K0246+000-K0246+308 B) MANUEL ROXAS RD. 252+(-131)-K0252+499 C) LEONARD WOOD RD. - K0250+(-767)-K0250+(-717) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱16.1M | 100% | Medium risk44 | —-0.080 |
| 116 | 20PD0113LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PMA CUT OFF RD. 1: K0252+(-687)-K0252+(-558) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱17.5M | 100% | Medium risk44 | —-0.083 |
| 117 | 19PD0002RECONSTRUCTION OF CONCRETE PAVEMENT AND PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING-ON SPECIFIC LOCATIONS ALONG MARCOS HIGHWAY (S00432LZ) KO 280+(-814) TO KO 281+701 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱7.4M | 100% | Medium risk43 | —-0.075 |
| 118 | 18PD0017ASSET PRESERVATION-PREVENTIVE MAINTENANCE: STO. TOMAS-MT. CABUYO RD. KO252+645-KO253+730 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱7.2M | 100% | Medium risk43 | —-0.077 |
| 119 | 20PD0139PREVENTIVE MAINTENANCE-PRIMARY ROADS: QUIRINO H-WAY (BAGUIO-BAUANG) -K0300+131-K0300+647 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱7.8M | 100% | Medium risk43 | —-0.077 |
| 120 | 20PD0142REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: TERTIARY ROADS EASTERNLINK CIRCUMFERENTIAL RD. K0248+620-K0248+645, K0248+700-K0248+715 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱5.4M | 100% | Medium risk43 | —-0.077 |
| 121 | 21PD0002REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS -SECONDARY ROADS-MARCOS HI-WAY K0+(-025) -K0280+000, K0280+(-040)-K0280+(-30), K0280+(-163)-K0280+(-040), K0280+(-262) -K0280+(-212) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱5.1M | 100% | Medium risk43 | —-0.078 |
| 122 | 20PD0112LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -KENNON ROAD-K0242+(-088) TO K0242+(-055) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱6.9M | 100% | Medium risk43 | —-0.081 |
| 123 | 20PD0114LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PMA RD., K0249+232-K0249+252 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱5.2M | 100% | Medium risk43 | —-0.081 |
| 124 | 18PD0005ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: EASTERNLINK CIRCUMFERENTIAL ROAD KO247+970-KO248+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱5.4M | 100% | Medium risk43 | —-0.081 |
| 125 | 20PD0129REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-QUEZON HILL RD. #1 K0308+153-K0308+175, K0308+428-K0308+447 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱8.3M | 100% | Medium risk43 | —-0.081 |