Contractor dossier
266 projects on file, including joint ventures this contractor is part of.
Total projects
266
Total budget
₱8.3B
Average progress
94.2%
Completion rate
76.3%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
14
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| Negros Island Region | 44 | ₱963M | 47.5 | 0 | 94.0% |
| Region XIII | 16 | ₱1B | 46.7 | 2 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱2.9B | 45.1 | 2 | 92.8% |
| Buildings and Facilities | 77 | ₱1.4B | 39.8 | 1 | 97.8% |
| Flood Control and Drainage | 40 | ₱2.2B | 51.6 | 1 | 95.5% |
| OTHER | 14 | ₱512.2M | 66.7 | 2 | 98.7% |
| Bridges | 14 | ₱394.7M | 48.4 | 0 | 95.3% |
| GAA 2025 SSP | 7 | ₱460.6M | 95.1 | 7 | 64.9% |
| Bridges, Roads | 2 | ₱162.3M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱89.2M | 93.7 | 1 | 31.1% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.4 | 0 | 81.1% |
| Water Provision and Storage | 1 | ₱9.8M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 25H00013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY GARING TO PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 81% | High risk93 | —-0.006 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 21HM0015CLUSTER XIII: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY TEBJONG, SIQUIJOR, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADIN | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk71 | —-0.033 |
| 21HM0006CLUSTER VI: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY PISONG A, MARIA, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk70 | —-0.033 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
| 23HN0084OO1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB/ RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-CEBU NORTH HAGNAYA WHARF ROAD -K0012+964 - K0013+243, K0013+259 - K0013+711, K0013+ 719-K0014+505, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱81.9M | 100% | High risk68 | —-0.024 |
| 21HN0020CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - POLOG-PANOYPOY ROAD WITH DRAINAGE FACILITIES CONNECTING TO CEBU NORTH HAGNAYA W | Region VII | Cebu 6th DEO | Completed | ₱72.4M | 100% | High risk68 | —-0.027 |
| 16HD0067NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLDG DRAINAGE, CNHWR, K084+166-K086+048, TABOGON | Region VII | Cebu 4th DEO | Completed | ₱48.5M | 100% | High risk66 | —-0.031 |
| 25H00059CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱153.4M | 80% | High risk66 | —-0.003 |
| 25HN0095OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA, PHASE 6, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 87% | High risk65 | —-0.022 |
| 24HN0048OO2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135.1M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 24H00182CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), UP CEBU- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VII | Region VII | On-Going | ₱39.8M | 83% | Medium risk47 | Flagged0.015 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20HN0006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS-FERRY LANDING RD - (S00004LP)- CHAINAGE 421 - CHAINAGE 787, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱10M | 100% | High risk64 | —-0.032 |
| 27 | 25HE0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MANTALONGON-LAPA-LUGSANGAN EXTENSION ROAD LEADING TO LUGSANGAN PEAK & MONKEY HABITA | Region VII | Cebu 2nd DEO | On-Going | ₱14.2M | 0% | High risk63 | —-0.006 |
| 28 | 18HN0024REHABILITATION/UPGRADING OF S.E. LLENES ROAD WITH DRAINAGE FACILITIES, BRGY. PAKNA-AN AND BRGY. LABOGON, MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱12.6M | 100% | High risk63 | —-0.031 |
| 29 | 25H00064OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY DON PEDRO RODRIGUEZ, CITY OF BOGO, CEBU | Region VII | Region VII | On-Going | ₱99.3M | 82% | High risk63 | —-0.030 |
| 30 | 20HN0002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS- CONSOLACION-TAYUD-LILOAN RD (S00372CB) CHAINAGE 2240 - CHAINAGE 2823, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱19.6M | 100% | High risk63 | —-0.030 |
| 31 | 23HN0055CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE AT BARANGAY CANSAGA, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk63 | —-0.032 |
| 32 | 23HN0061CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE AT BARANGAY PITOGO, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk63 | —-0.033 |
| 33 | 23HN0044CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, TABOK, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.9M | 100% | High risk63 | —-0.032 |
| 34 | 24HN0109CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱126M | 100% | High risk62 | —-0.068 |
| 35 | 23HD0097CONSTRUCTION OF SEVERO M. VERALLO PROVINICAL HOSPITAL COMPLEX (CEBU PROVINCIAL HOSPITAL), TAYTAYON, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱149.8M | 100% | High risk61 | —-0.017 |
| 36 | 23HM0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+955 - K0009+790 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 37 | 23HM0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+120 - K0008+955 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 38 | 22HM0067OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, LUYANG-POO-LAZI RD - K0018+218 - K0018+402, K0018+758 - K00130 | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 36% | High risk60 | —-0.012 |
| 39 | 23HM0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG SIQUIJOR CIRCUMFERENTIAL RD - K0062+832 - K0074+588 | Negros Island Region | Siquijor DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.080 |
| 40 | 17H00033CONSTRUCTION OF EVACUATION CENTER, MEDELLIN, CEBU | Region VII | Region VII | Completed | ₱34.7M | 100% | Medium risk60 | —-0.062 |
| 41 | 24HD0050CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD-CEBU NORTH HAGNAYA WHARF ROAD-K0096+119-K0097+600, K0101+745-K0103+037, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱123.4M | 91% | Medium risk60 | —-0.042 |
| 42 | 24H00121LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTIPURPOSE FACILITIES, CAMOTES AIRPORT, CAMOTES ISLAND, CEBU | Region VII | Region VII | On-Going | ₱115.7M | 30% | Medium risk59 | —-0.015 |
| 43 | 21H00003CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CURVA-TINDOG-LIBERTAD ROAD CONNECTING HIDEAWAY BEACH RESORT AND VARIOUS TOURISM SITES, D | Region VII | Region VII | Completed | ₱98.9M | 100% | Medium risk59 | —-0.081 |
| 44 | 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 45 | 19HD0014ROAD WIDENING ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0094+500-K0097+852, CITY OF BOGO | Region VII | Cebu 4th DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.083 |
| 46 | 25HN0142SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE II, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱82.3M | 73% | Medium risk56 | —-0.037 |
| 47 | 17HH0122CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, LEGASPI ST., BRGY. SAN ROQUE, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱20M | 100% | Medium risk56 | —-0.065 |
| 48 | 22HD0045CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO AIRPORT - MEDELLIN DOMESTIC AIRPORT ROAD CONSTRUCTION, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱91.7M | 100% | Medium risk56 | —-0.085 |
| 49 | 23HD0051CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CEBU NORTH HAGNAYA WHARF ROAD, BARANGAY DON PEDRO RODRIGUEZ, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱89.7M | 100% | Medium risk55 | —-0.070 |
| 50 | 19HN0061LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOL BUILDINGS - CONSTRUCTION OF 3-STOREY COLLEGE OF ARTS AND SCIENCES BUILDING, LAPU-LAPU CITY COLLEGES, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱48M | 100% | Medium risk54 | —-0.082 |