Contractor dossier
266 projects on file, including joint ventures this contractor is part of.
Total projects
266
Total budget
₱8.3B
Average progress
94.2%
Completion rate
76.3%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
14
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| Negros Island Region | 44 | ₱963M | 47.5 | 0 | 94.0% |
| Region XIII | 16 | ₱1B | 46.7 | 2 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱2.9B | 45.1 | 2 | 92.8% |
| Buildings and Facilities | 77 | ₱1.4B | 39.8 | 1 | 97.8% |
| Flood Control and Drainage | 40 | ₱2.2B | 51.6 | 1 | 95.5% |
| OTHER | 14 | ₱512.2M | 66.7 | 2 | 98.7% |
| Bridges | 14 | ₱394.7M | 48.4 | 0 | 95.3% |
| GAA 2025 SSP | 7 | ₱460.6M | 95.1 | 7 | 64.9% |
| Bridges, Roads | 2 | ₱162.3M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱89.2M | 93.7 | 1 | 31.1% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.4 | 0 | 81.1% |
| Water Provision and Storage | 1 | ₱9.8M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 25H00013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY GARING TO PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 81% | High risk93 | —-0.006 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 21HM0015CLUSTER XIII: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY TEBJONG, SIQUIJOR, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADIN | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk71 | —-0.033 |
| 21HM0006CLUSTER VI: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY PISONG A, MARIA, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk70 | —-0.033 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
| 23HN0084OO1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB/ RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-CEBU NORTH HAGNAYA WHARF ROAD -K0012+964 - K0013+243, K0013+259 - K0013+711, K0013+ 719-K0014+505, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱81.9M | 100% | High risk68 | —-0.024 |
| 21HN0020CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - POLOG-PANOYPOY ROAD WITH DRAINAGE FACILITIES CONNECTING TO CEBU NORTH HAGNAYA W | Region VII | Cebu 6th DEO | Completed | ₱72.4M | 100% | High risk68 | —-0.027 |
| 16HD0067NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLDG DRAINAGE, CNHWR, K084+166-K086+048, TABOGON | Region VII | Cebu 4th DEO | Completed | ₱48.5M | 100% | High risk66 | —-0.031 |
| 25H00059CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱153.4M | 80% | High risk66 | —-0.003 |
| 25HN0095OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA, PHASE 6, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 87% | High risk65 | —-0.022 |
| 24HN0048OO2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135.1M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 24H00182CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), UP CEBU- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VII | Region VII | On-Going | ₱39.8M | 83% | Medium risk47 | Flagged0.015 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 20HD0023REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.095 |
| 77 | 20HD0021REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS ANTONIO Y DE PIO H-WAY-K0120+900-,K0121+146, K0134+209-K0134+585, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.094 |
| 78 | 20H00065CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS-CONSTRUCTION OF EVACUATION CENTER AT BRGY. POBLACION NORTE, MARIA, SIQUIJOR | Region VII | Region VII | Completed | ₱34.7M | 100% | Medium risk50 | —-0.079 |
| 79 | 22HN0029CSSP: SIPAG - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF CAUSEWAY AT BARANGAY MARIBAGO, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.094 |
| 80 | 22N00186REPAIR/REHABILITATION OF MAGTIACO RIVER CONTROL, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱120.6M | 100% | Medium risk50 | —-0.058 |
| 81 | 22HH0008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAHUG RIVER, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.077 |
| 82 | 24HN0130OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.079 |
| 83 | 23N00055NRJ DAANG MAHARLIKA BUNAWAN BROOK - TAGBAYANGBANG ROAD LEADING TO BULONGBULUNGAN WATER FALLS, BRGY. BUNAWAN BROOK, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱115.7M | 100% | Medium risk50 | —-0.041 |
| 84 | 24HN0092CSSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA (PHASE III), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.079 |
| 85 | 22HN0068CSSP: BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - RECONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GUN-OB, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱26.7M | 100% | Medium risk49 | —-0.088 |
| 86 | 25HG0047CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱47.3M | 99% | Medium risk49 | —-0.045 |
| 87 | 23HD0065CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PILI, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.093 |
| 88 | 23HD0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER) BANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.093 |
| 89 | 20HD0080CONSTRUCTION OF MULTI-PURPOSE BUILDING, MADRIDEJOS COMMUNITY COLLEGE, BARANGAY BUNAKAN, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.094 |
| 90 | 24HD0109BIP-FLOOD MITIGATION SRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SEAWALL AT TABOGON PORT, TABOGON CEBU | Region VII | Cebu 4th DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.078 |
| 91 | 22HM0060OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS AT DPWH ANNEX BUILDING, SOUTH POBLACION, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱4.9M | 100% | Medium risk49 | —-0.013 |
| 92 | 18HD0186CONSTRUCTION OF FOUR-STOREY (16 CLASSROOM) SCHOOL BUILDING, MADRIDEJOS NATIONAL HIGH SCHOOL, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | Completed | ₱38.6M | 100% | Medium risk49 | —-0.043 |
| 93 | 20HD0057CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING AT BARANGAY KAWIT, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.093 |
| 94 | 21HN0078LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GUN-OB, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.9M | 100% | Medium risk48 | —-0.085 |
| 95 | 24HN0095CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY GUN-OB (PHASE 4), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.9M | 100% | Medium risk48 | —-0.095 |
| 96 | 18HN0042CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MACTAN, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.094 |
| 97 | 20HM0082LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CATULAYAN, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.066 |
| 98 | 22HM0027OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS AT SAWANG, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱14.7M | 82% | Medium risk48 | —-0.007 |
| 99 | 18HD0003CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO MEDELLIN ZIP-AWAY, INCL. BRIDGE, BARANGAY CAPUTATAN NORTE, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱46.6M | 100% | Medium risk48 | —-0.064 |
| 100 | 22HN0072CSSP: SIPAG : COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF CAUSEWAY AT BARANGAY TINGO, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱47M | 100% | Medium risk48 | —-0.088 |