Opening the dossier…
Opening the dossier…
Contractor dossier
266 projects on file, including joint ventures this contractor is part of.
Total projects
266
Total budget
₱8.3B
Average progress
94.2%
Completion rate
76.3%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
14
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| Negros Island Region | 44 | ₱963M | 47.5 | 0 | 94.0% |
| Region XIII | 16 | ₱1B | 46.7 | 2 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱2.9B | 45.1 | 2 | 92.8% |
| Buildings and Facilities | 77 | ₱1.4B | 39.8 | 1 | 97.8% |
| Flood Control and Drainage | 40 | ₱2.2B | 51.6 | 1 | 95.5% |
| OTHER | 14 | ₱512.2M | 66.7 | 2 | 98.7% |
| Bridges | 14 | ₱394.7M | 48.4 | 0 | 95.3% |
| GAA 2025 SSP | 7 | ₱460.6M | 95.1 | 7 | 64.9% |
| Bridges, Roads | 2 | ₱162.3M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱89.2M | 93.7 | 1 | 31.1% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.4 | 0 | 81.1% |
| Water Provision and Storage | 1 | ₱9.8M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 25H00013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY GARING TO PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 81% | High risk93 | —-0.006 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 21HM0015CLUSTER XIII: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY TEBJONG, SIQUIJOR, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADIN | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk71 | —-0.033 |
| 21HM0006CLUSTER VI: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY PISONG A, MARIA, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk70 | —-0.033 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
| 23HN0084OO1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB/ RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-CEBU NORTH HAGNAYA WHARF ROAD -K0012+964 - K0013+243, K0013+259 - K0013+711, K0013+ 719-K0014+505, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱81.9M | 100% | High risk68 | —-0.024 |
| 21HN0020CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - POLOG-PANOYPOY ROAD WITH DRAINAGE FACILITIES CONNECTING TO CEBU NORTH HAGNAYA W | Region VII | Cebu 6th DEO | Completed | ₱72.4M | 100% | High risk68 | —-0.027 |
| 16HD0067NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLDG DRAINAGE, CNHWR, K084+166-K086+048, TABOGON | Region VII | Cebu 4th DEO | Completed | ₱48.5M | 100% | High risk66 | —-0.031 |
| 25H00059CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱153.4M | 80% | High risk66 | —-0.003 |
| 25HN0095OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA, PHASE 6, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 87% | High risk65 | —-0.022 |
| 24HN0048OO2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135.1M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 24H00182CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), UP CEBU- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VII | Region VII | On-Going | ₱39.8M | 83% | Medium risk47 | Flagged0.015 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 23HN0103CSSP: BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE FACILITY AT BARANGAY GUN-OB, LAPU LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 102 | 24HN0135CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CASILI, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.094 |
| 103 | 23HN0031CSSP: BIP: MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CALAWISAN, LAPU-LAPU CITY,CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.9M | 100% | Medium risk48 | —-0.094 |
| 104 | 20H00010CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF MEDELLIN, MUNICIPAL POLICE STATION, MEDELLIN, CEBU PROVINCE | Region VII | Region VII | Completed | ₱9.7M | 100% | Medium risk48 | —-0.092 |
| 105 | 20HD0024RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, POBLACION DAANBANTAYAN BRIDGE (B00011CB) ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN ROAD, DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.057 |
| 106 | 25HN0130SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF REVETMENT WALL ALONG BUTUANON RIVER, BARANGAY TINGUB -BARANGAY CANDUMAN (PHASE 8), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱25M | 54% | Medium risk48 | —-0.016 |
| 107 | 24HN0159CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BARANGAY MACTAN, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 108 | 23HM0087001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0029+432 - K0029+873 | Negros Island Region | Siquijor DEO | On-Going | ₱18.4M | 96% | Medium risk48 | —-0.047 |
| 109 | 19HD0017RETROFITTING/STRENGTHENING OF PERMANENT BRUDGES, MARAAT BR. (B00632CB) ALONG ANTONIO Y DE PIO H-WAY, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱15.1M | 100% | Medium risk48 | —-0.059 |
| 110 | 23HM0034001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0027+603 - K0028+000 | Negros Island Region | Siquijor DEO | On-Going | ₱15.6M | 94% | Medium risk48 | —-0.045 |
| 111 | 21HM0051LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION OF POO -CAPALASANAN PROVINCIAL ROAD, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.089 |
| 112 | 24HN0107CSSP: BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (LAPU-LAPU CITY COLLEGE GYM), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.096 |
| 113 | 23HN0027MULTIPURPOSE/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. NANGKA, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.095 |
| 114 | 20HD0025RETROFITTING/STRENGTHENING OF PEMANENT BRIDGES, LUYANG BRIDGE (B00006CB) ALONG ANTONIO Y DE PIO HIGHWAY, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.058 |
| 115 | 22HM0015CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO OMPAS BEACH, LILOAN, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱8.3M | 95% | Medium risk48 | —-0.035 |
| 116 | 23HG0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF POBLACION, ARGAO DRAINAGE SYSTEM, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱34.3M | 100% | Medium risk48 | —-0.024 |
| 117 | 22HM0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROAD LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CANGMANGKI ROAD CONNECTING TO MAN | Negros Island Region | Siquijor DEO | On-Going | ₱8.3M | 94% | Medium risk48 | —-0.035 |
| 118 | 22HM0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INSFRASTRUCTURE PROGRAM - TRIP), PISONG A - PISONG B ROAD LEADING TO CANGBANGAG FALLS, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱7.4M | 94% | Medium risk48 | —-0.035 |
| 119 | 23HM0100001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0029+873 - K0030+000 | Negros Island Region | Siquijor DEO | On-Going | ₱5.8M | 99% | Medium risk48 | —-0.048 |
| 120 | 23HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF ROADS CONNECTING BRGY. | Negros Island Region | Siquijor DEO | On-Going | ₱18.7M | 89% | Medium risk48 | —-0.048 |
| 121 | 25HN0145SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), BARANGAY BUAYA, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.8M | 100% | Medium risk48 | —-0.096 |
| 122 | 19HD0008RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, POBLACION TABUELAN BRIDGE (B00014CB) ALONG ANTONIO Y DE PIO HIGHWAY, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.059 |
| 123 | 19HD0007RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, KINAWAHAN BR. (B00020CB) ALONG ANTONIO Y DE PIO H-WAY, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.060 |
| 124 | 23HD0020CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURIST ROAD INFRASTRUCTURE PROGRAM-TRIP), BOMEDCO TRANSLOADING ROAD IN SUPPORT TO MAYA RORO PORT TO MALAPASCUA ISLAND, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.060 |
| 125 | 19HN0048LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES-LOCAL BRIDGES - CONSTRUCTION OF BRIDGE AT BRGY. CASILI, MANDAUE CITY CONNECTING TO BRGY. CASILI, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱10.3M | 100% | Medium risk47 | —-0.055 |