Contractor dossier
266 projects on file, including joint ventures this contractor is part of.
Total projects
266
Total budget
₱8.3B
Average progress
94.2%
Completion rate
76.3%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
14
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| Negros Island Region | 44 | ₱963M | 47.5 | 0 | 94.0% |
| Region XIII | 16 | ₱1B | 46.7 | 2 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱2.9B | 45.1 | 2 | 92.8% |
| Buildings and Facilities | 77 | ₱1.4B | 39.8 | 1 | 97.8% |
| Flood Control and Drainage | 40 | ₱2.2B | 51.6 | 1 | 95.5% |
| OTHER | 14 | ₱512.2M | 66.7 | 2 | 98.7% |
| Bridges | 14 | ₱394.7M | 48.4 | 0 | 95.3% |
| GAA 2025 SSP | 7 | ₱460.6M | 95.1 | 7 | 64.9% |
| Bridges, Roads | 2 | ₱162.3M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱89.2M | 93.7 | 1 | 31.1% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.4 | 0 | 81.1% |
| Water Provision and Storage | 1 | ₱9.8M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 25H00013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY GARING TO PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 81% | High risk93 | —-0.006 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 21HM0015CLUSTER XIII: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY TEBJONG, SIQUIJOR, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADIN | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk71 | —-0.033 |
| 21HM0006CLUSTER VI: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY PISONG A, MARIA, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk70 | —-0.033 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
| 23HN0084OO1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB/ RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-CEBU NORTH HAGNAYA WHARF ROAD -K0012+964 - K0013+243, K0013+259 - K0013+711, K0013+ 719-K0014+505, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱81.9M | 100% | High risk68 | —-0.024 |
| 21HN0020CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - POLOG-PANOYPOY ROAD WITH DRAINAGE FACILITIES CONNECTING TO CEBU NORTH HAGNAYA W | Region VII | Cebu 6th DEO | Completed | ₱72.4M | 100% | High risk68 | —-0.027 |
| 16HD0067NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLDG DRAINAGE, CNHWR, K084+166-K086+048, TABOGON | Region VII | Cebu 4th DEO | Completed | ₱48.5M | 100% | High risk66 | —-0.031 |
| 25H00059CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱153.4M | 80% | High risk66 | —-0.003 |
| 25HN0095OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA, PHASE 6, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 87% | High risk65 | —-0.022 |
| 24HN0048OO2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135.1M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 24H00182CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), UP CEBU- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VII | Region VII | On-Going | ₱39.8M | 83% | Medium risk47 | Flagged0.015 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23HM0025OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0017+000 - K0018+000 | Negros Island Region | Siquijor DEO | On-Going | ₱38.7M | 92% | Medium risk47 | —-0.044 |
| 127 | 22HM0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CALUNASAN-BANDILAAN LEADING TO BUTTERFLY SANCTUARY AND BANDILAAN MOUNTAIN VIEW | Negros Island Region | Siquijor DEO | On-Going | ₱8.3M | 100% | Medium risk47 | —-0.036 |
| 128 | 23HM0013OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0047+806 - K0048+000 | Negros Island Region | Siquijor DEO | On-Going | ₱7.9M | 86% | Medium risk47 | —-0.044 |
| 129 | 22HM0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF CANDANAY NORTE-CANG-ISAD ACCESS ROAD, SIQUI | Negros Island Region | Siquijor DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.089 |
| 130 | 20H00014CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF BORBON, MUNICIPAL POLICE STATION, BORBON, CEBU PROVINCE | Region VII | Region VII | Completed | ₱9.7M | 100% | Medium risk47 | —-0.088 |
| 131 | 20HN0093LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PAJO, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.086 |
| 132 | 20HD0049RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DAYHAGON BRIDGE (B00631CB) ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN ROAD, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.059 |
| 133 | 21HM0052LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, LOCAL INFRASTRUCTURE PROGRAM, CONCRETING OF CANLAMBO-BALOLANG ROAD (PHASE 2), LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱14.1M | 100% | Medium risk47 | —-0.089 |
| 134 | 21HM0053LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, LOCAL INFRASTRUCTURE PROGRAM, CONCRETING OF LOOC-CALUNASAN-BANDILAAN ROAD LEADING TO BUTTERFLY SANCTUARY AND BANDILAAN MOUNTAIN VIEW PARK, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.4M | 100% | Medium risk47 | —-0.089 |
| 135 | 21HM0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF BASAC-PISONG B ROAD LEADING TO CANGBANGAG FALLS, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 136 | 20HM0078LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF TIMBAON-CANGMUNAG ROAD, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱27.9M | 100% | Medium risk47 | —-0.089 |
| 137 | 22HD0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO MEDELLIN PORT, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.095 |
| 138 | 18HD0009RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, BINABAG BR (B00004CB) ALONG CNHWR, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.059 |
| 139 | 23HD0069CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MEDELLIN, CEBU PROVINCE | Region VII | Cebu 4th DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.059 |
| 140 | 20HD0026RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BANGON BRIDGE (B00010B) ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN ROAD, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.058 |
| 141 | 21HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NONOC-CANG-ALLAS-CALUNASAN ROAD LEADING TO ST. FRANCIS OF ASSISI CHURCH AND BELFRYN CANTABON CAVE, TULAWOG CAVE, DILAAB FESTIV | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 142 | 24HN0157CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTER IN OLANGO ISLAND (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.094 |
| 143 | 25HN0035SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHASE II, CORDOVA NATIONAL HIGH SCHOOL, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.096 |
| 144 | 24HN0176CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT ALEGRIA ELEMENTARY SCHOOL, BARANGAY ALEGRIA, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.096 |
| 145 | 23HM0010OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0022+488 - K0022+680 | Negros Island Region | Siquijor DEO | On-Going | ₱7.5M | 86% | Medium risk47 | —-0.043 |
| 146 | 22HM0001OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0018+000 - K0018+935 | Negros Island Region | Siquijor DEO | On-Going | ₱18.4M | 95% | Medium risk47 | —-0.035 |
| 147 | 20HM0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, TIMBAON - CANGMUNAG ROAD CONNECTING TO MANUFACTURING SITE AND NATIONAL HIGHWAY IN SUPPORT OF MEAT/FISH PROCESSING AND DAIR | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 148 | 20HM0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAMBOJON ROAD CONNECTING TO MANUFACTURING SITE AND SIQUIJOR PROVINCIAL ROAD IN SUPPORT OF FURNITURE INDUSTRIES, LAMBOJON, S | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 149 | 25HG0049CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF RD - K0103 + 037 - K0103 + 950, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱39.4M | 44% | Medium risk47 | —-0.048 |
| 150 | 18HD0015REHABILIATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS CEBU NORTH HAGNAYA WHARF ROAD K0083+817-K0084+166 K0091+000-K0092+195 TABOGON & BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱32.3M | 100% | Medium risk47 | —-0.095 |