Contractor dossier
266 projects on file, including joint ventures this contractor is part of.
Total projects
266
Total budget
₱8.3B
Average progress
94.2%
Completion rate
76.3%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
14
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| Negros Island Region | 44 | ₱963M | 47.5 | 0 | 94.0% |
| Region XIII | 16 | ₱1B | 46.7 | 2 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱2.9B | 45.1 | 2 | 92.8% |
| Buildings and Facilities | 77 | ₱1.4B | 39.8 | 1 | 97.8% |
| Flood Control and Drainage | 40 | ₱2.2B | 51.6 | 1 | 95.5% |
| OTHER | 14 | ₱512.2M | 66.7 | 2 | 98.7% |
| Bridges | 14 | ₱394.7M | 48.4 | 0 | 95.3% |
| GAA 2025 SSP | 7 | ₱460.6M | 95.1 | 7 | 64.9% |
| Bridges, Roads | 2 | ₱162.3M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱89.2M | 93.7 | 1 | 31.1% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.4 | 0 | 81.1% |
| Water Provision and Storage | 1 | ₱9.8M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 25H00013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY GARING TO PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 81% | High risk93 | —-0.006 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 21HM0015CLUSTER XIII: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY TEBJONG, SIQUIJOR, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADIN | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk71 | —-0.033 |
| 21HM0006CLUSTER VI: 1. LOCAL PROGRAM, LOCAL ROADS AND BRIDGES - LOCAL ROADS LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION OF ROAD, BARANGAY PISONG A, MARIA, SIQUIJOR; 2. CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | High risk70 | —-0.033 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
| 23HN0084OO1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB/ RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-CEBU NORTH HAGNAYA WHARF ROAD -K0012+964 - K0013+243, K0013+259 - K0013+711, K0013+ 719-K0014+505, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱81.9M | 100% | High risk68 | —-0.024 |
| 21HN0020CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - POLOG-PANOYPOY ROAD WITH DRAINAGE FACILITIES CONNECTING TO CEBU NORTH HAGNAYA W | Region VII | Cebu 6th DEO | Completed | ₱72.4M | 100% | High risk68 | —-0.027 |
| 16HD0067NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT INCLDG DRAINAGE, CNHWR, K084+166-K086+048, TABOGON | Region VII | Cebu 4th DEO | Completed | ₱48.5M | 100% | High risk66 | —-0.031 |
| 25H00059CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱153.4M | 80% | High risk66 | —-0.003 |
| 25HN0095OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY NANGKA, PHASE 6, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 87% | High risk65 | —-0.022 |
| 24HN0048OO2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135.1M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 24H00189CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. TINGUB - BRGY. CANDUMAN (PHASE III) | Region VII | Region VII | On-Going | ₱47.3M | 75% | High risk75 | Flagged0.042 |
| 25HN0174SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CANJULAO (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱34.3M | 11% | High risk95 | Flagged0.036 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Region VII | Cebu 6th DEO | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
| 25N00031MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1332+550 - K1333+935 | Region XIII | Region XIII | On-Going | ₱89.2M | 31% | High risk94 | Flagged0.025 |
| 24N00005DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1243+800- K1244+670, K1244+690- K1246+000 | Region XIII | Region XIII | On-Going | ₱144.9M | 91% | High risk79 | Flagged0.024 |
| 25HG0094CONSTRUCTION OF ROAD, SITIO TABAYJO, BRGY. DAKIT-BRGY. PANDAN, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 53% | High risk95 | Flagged0.024 |
| 25HN0134SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF NANGKA - TUGBONGAN ROAD WITH SLOPE PROTECTION SYSTEM, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 50% | High risk95 | Flagged0.022 |
| 25H00018CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), PACKAGE 2, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 97% | High risk95 | Flagged0.016 |
| 24H00182CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), UP CEBU- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VII | Region VII | On-Going | ₱39.8M | 83% | Medium risk47 | Flagged0.015 |
| 25HG0082BIP - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES, CONSTRUCTION OF CAUSEWAY AT BOGO PANTALAN, BOGO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱67.9M | 94% | High risk95 | Flagged0.012 |
| 25HN0133SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY TILHAONG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.5M | 98% | High risk95 | Flagged0.008 |
| 23H00122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUYANG RIVER, CARMEN, CEBU | Region VII | Region VII | On-Going | ₱79.6M | 90% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 18HD0131CONCRETING OF TABAGAK FMR, BARANGAY TABAGAK, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.5M | 100% | Medium risk44 | —-0.043 |
| 202 | 18HD0130CONCRETING OF KAONGKOD - PILI FMR, BARANGAY KAONGKOD AND BARANGAY PILI, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.5M | 100% | Medium risk44 | —-0.043 |
| 203 | 19NA0051READ - REHABILATION/MAJOR REPAIR OF PERMANENT BRIDGES-PUYO BRIDGE (B00832MN) ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) JABONGA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱48.7M | 100% | Medium risk43 | —-0.050 |
| 204 | 21HM0063CONCRETING OF SITIO CAMANIL-IS, BRGY. GABAYAN FMR, BRGY. GABAYAN, LAZI,SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱11.8M | 100% | Medium risk43 | —-0.040 |
| 205 | 20NC0017CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION PISAAN-LUCAC-BITAN-AGAN ROAD LEADING TO DATU KANAWA KALIPAY CAVE, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱77.2M | 100% | Medium risk43 | —-0.072 |
| 206 | 21HM0049CONCRETING OF BRGY. CANTUGBAS TO BRGY. LOGUCAN FMR BRGY. CANTUGBAS AND BRGY. LOGUCAN, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.039 |
| 207 | 24N00018DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1339+000- K1340+000, K1340+228- K1341+536, K1341+858- K1342+000, K1344+365- K1346+000 | Region XIII | Region XIII | Completed | ₱53.7M | 100% | Medium risk43 | —-0.079 |
| 208 | 22NC0024ROAD WIDENING ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECTION) - K1350+000 - K1351+634, BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱63.1M | 100% | Medium risk43 | —-0.075 |
| 209 | 17HH0077CONSTRUCTION OF FOUR(4) STOREY, TWELVE(12) CLASSROOM SCHOOL BUILDING AT BANILAD NIGHT HIGH SCHOOL, BRGY. BANILAD, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱29.7M | 100% | Medium risk42 | —-0.022 |
| 210 | 19HD0122CONCRETING OF BARANGAY CALAMBU-A TO BARANGAY SAB-A FMR (PHASE III), SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.5M | 100% | Medium risk42 | —-0.043 |
| 211 | 18HH0099CONCRETING OF BRGY. SUDLON II FMR, BRGY. SUDLON II, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱7.5M | 100% | Medium risk42 | —-0.043 |
| 212 | 19HN0073CONCRETING OF BRGY. PANAS - PANOYPOY FMR, BRGY. PANAS - PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.6M | 100% | Medium risk42 | —-0.044 |
| 213 | 19HN0074CONCRETING OF SITIO TINDAHAN, BRGY. PANAS TO SITIO LUTON, BRGY. MABINI, CEBU CITY FMR, BRGY. PANAS, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱8.5M | 100% | Medium risk42 | —-0.044 |
| 214 | 21HN0095CONCRETING OF BRGY. GARING FMR (PHASE II), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.3M | 100% | Medium risk41 | —-0.043 |
| 215 | 21HN0132CONCRETING OF BRGY. GARING FMR, BRGY. GARING, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱12.3M | 100% | Medium risk41 | —-0.043 |
| 216 | 21HN0139CONCRETING OF BRGY. GARING LEADING TO BRGY. DANGLAG FMR, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱12.3M | 100% | Medium risk41 | —-0.044 |
| 217 | 18HH0096CONCRETING OF BRGY. MABINI - BRGY. PARIL FMR, BRGY. MABINI AND BRGY. PARIL, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱5.7M | 100% | Medium risk41 | —-0.045 |
| 218 | 23HD0085ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD FROM PROVINCIAL ROAD GOING TO SITIO LUMBOY PHASE II, BARANGAY MUABOG, TABOGON, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.7M | 100% | Medium risk41 | —-0.043 |
| 219 | 25N00046MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1188+748-K1190+000 | Region XIII | Region XIII | On-Going | ₱29.7M | 10% | Medium risk39 | —-0.032 |
| 220 | 21NC0064CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION OF PISAAN-LUCAC-BITAN-AGAN ROAD LEADING TO DATU KANAWA KALIPAY CAVE, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.079 |
| 221 | 24N00172NRJ DAANG MAHARLIKA BUNAWAN BROOK- TAGBAYANGBANG ROAD LEADING TO BULONGBULUNGAN WATER FALLS, BRGY. BUNAWAN BROOK, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱20.3M | 100% | Medium risk38 | —-0.076 |
| 222 | 18HK0107CONSTRUCTION OF FOUR (4) STOREY (2) ICT LAB AND 2-SCIENCE LAB AT CAMPANUN-AN SENIOR HIGH SCHOOL (9.5MX23.00M), MABINAY | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱17.6M | 100% | Medium risk37 | —-0.025 |
| 223 | 18HK0106CONSTRUCTION OF FOUR (4) STOREY (2) ICT LAB AND 2-SCIENCE LAB AT MAYAPOSI HIGH SCHOOL (9.5MX23.00M), MABINAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱17.3M | 100% | Medium risk36 | —-0.025 |
| 224 | 18HK0099CONSTRUCTION OF FOUR (4) STOREY TWO (2) ICT LABORATORY & 2 SCIENCE LAB AT AMLAN NATIONAL HIGH SCHOOL-JUGNO CAMPUS, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱17.1M | 100% | Medium risk36 | —-0.021 |
| 225 | 18HK0110CONSTRUCTION OF TWO (2) STOREY TWO (2) ICT LABORATORY SCHOOL BUILDING AT ISIDORO SALMA MSHS, BALAYONG, PAMPLONA (9.5MX23.00M), PAMPLONA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱9.3M | 100% | Medium risk35 | —-0.034 |