Contractor dossier
106 projects on file, including joint ventures this contractor is part of.
Total projects
106
Total budget
₱8.9B
Average progress
94.5%
Completion rate
84.9%
Average risk score
48.7
Medium risk on average, out of 100
Flagged as unusual
6
5.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 73 | ₱3.7B | 46.5 | 0 | 96.7% |
| Region III | 11 | ₱799M | 49.0 | 0 | 97.2% |
| Region IX | 6 | ₱436.9M | 63.1 | 1 | 96.8% |
| Region XII | 6 | ₱428.5M | 34.8 | 0 | 100.0% |
| Region I | 4 | ₱1.5B | 62.4 | 2 | 90.6% |
| Region XIII | 3 | ₱286.1M | 65.3 | 1 | 45.9% |
| Central Office | 2 | ₱1.7B | 75.5 | 2 | 52.1% |
| Region VII | 1 | ₱46M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱3.1B | 46.1 | 0 | 95.7% |
| Flood Control and Drainage | 25 | ₱1.7B | 53.5 | 1 | 94.0% |
| Bridges | 23 | ₱2.5B | 45.5 | 3 | 94.0% |
| Buildings and Facilities | 3 | ₱79.5M | 44.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱95.3M | 94.1 | 1 | 36.5% |
| OTHER | 1 | ₱233.2M | 79.0 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱1.2B | 78.5 | 1 | 87.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0097REHABILITATION OF SEAWALL, BARANGAY LIPATA, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 37% | High risk94 | Flagged0.026 |
| 24CL0037CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BANCAL DANAC BUNGA SECTION, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱98.9M | 100% | High risk80 | —-0.043 |
| 18KJ0190CONSTRUCTION OF USUGAN RIVER RIVER CONTROL INCLUDING BRIDGE, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱233.2M | 100% | High risk79 | —-0.003 |
| 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 18A00097CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - PALLAS - PARPAROROC ROAD LEADING TO ABKIR-PF ALVIAR - SALSALAMAGUI - ALSEM (BRIDGE CONSTRUCTION) IN SUPPORT OF DIFFERENT AGRICULTURAL PRODUCTS, ILOCOS NORTE | Region I | Region I | Completed | ₱289.5M | 100% | High risk74 | Flagged0.003 |
| 22J00091CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 1 ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (PCA SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱100.3M | 81% | High risk73 | Flagged0.002 |
| 24CC0344CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND REHABILITATION OF WATERWAY ALONG ANGAT RIVER, K000+551 TO K000+701, BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.063 |
| 20J00158CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL AT SAAZ RIVER, SAN RAMON, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱111.1M | 100% | High risk73 | —-0.048 |
| 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Central Office | Bridges Management Cluster | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 21J00043CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER ALONG SAN RAMON BR. 2 ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA SECONDARY ROAD, TALISAYAN, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱89.1M | 100% | High risk64 | —-0.056 |
| 19A00119CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN BYPASS ROAD (PHASE I), PANGASINAN | Region I | Region I | On-Going | ₱890.5M | 77% | High risk63 | Flagged0.048 |
| 18KJ0189CONSTRUCTION OF MT. MALINDANG ECO TOURISM ROAD, CLARIN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱237.2M | 100% | High risk62 | —-0.053 |
| 18K00156ROAD WIDENING OF OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA RD-K1762+227-K1764+177,K1764+276-K176 | Region X | Region X | Completed | ₱162.9M | 100% | High risk62 | —-0.065 |
| 23C00072FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER NORTH APPROACH DOWNSTREAM, BOTOLAN, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | Completed | ₱96.5M | 100% | High risk62 | —-0.074 |
| 19K00325CONSTRUCTION OF OROQUIETA CITY BYPASS ROAD, MISAMIS OCCIDENTAL | Region X | Region X | Completed | ₱102.8M | 100% | High risk60 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Central Office | Bridges Management Cluster | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 19A00119CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN BYPASS ROAD (PHASE I), PANGASINAN | Region I | Region I | On-Going | ₱890.5M | 77% | High risk63 | Flagged0.048 |
| 25NG0097REHABILITATION OF SEAWALL, BARANGAY LIPATA, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 37% | High risk94 | Flagged0.026 |
| 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 18A00097CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - PALLAS - PARPAROROC ROAD LEADING TO ABKIR-PF ALVIAR - SALSALAMAGUI - ALSEM (BRIDGE CONSTRUCTION) IN SUPPORT OF DIFFERENT AGRICULTURAL PRODUCTS, ILOCOS NORTE | Region I | Region I | Completed | ₱289.5M | 100% | High risk74 | Flagged0.003 |
| 22J00091CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 1 ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (PCA SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱100.3M | 81% | High risk73 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25NG0097REHABILITATION OF SEAWALL, BARANGAY LIPATA, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 37% | High risk94 | Flagged0.026 |
| 2 | 24CL0037CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BANCAL DANAC BUNGA SECTION, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱98.9M | 100% | High risk80 | —-0.043 |
| 3 | 18KJ0190CONSTRUCTION OF USUGAN RIVER RIVER CONTROL INCLUDING BRIDGE, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱233.2M | 100% | High risk79 | —-0.003 |
| 4 | 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 5 | 18A00097CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - PALLAS - PARPAROROC ROAD LEADING TO ABKIR-PF ALVIAR - SALSALAMAGUI - ALSEM (BRIDGE CONSTRUCTION) IN SUPPORT OF DIFFERENT AGRICULTURAL PRODUCTS, ILOCOS NORTE | Region I | Region I | Completed | ₱289.5M | 100% | High risk74 | Flagged0.003 |
| 6 | 22J00091CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 1 ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (PCA SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱100.3M | 81% | High risk73 | Flagged0.002 |
| 7 | 24CC0344CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND REHABILITATION OF WATERWAY ALONG ANGAT RIVER, K000+551 TO K000+701, BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.063 |
| 8 | 20J00158CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL AT SAAZ RIVER, SAN RAMON, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱111.1M | 100% | High risk73 | —-0.048 |
| 9 | 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Central Office | Bridges Management Cluster | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 10 | 21J00043CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER ALONG SAN RAMON BR. 2 ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA SECONDARY ROAD, TALISAYAN, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱89.1M | 100% | High risk64 | —-0.056 |
| 11 | 19A00119CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN BYPASS ROAD (PHASE I), PANGASINAN | Region I | Region I | On-Going | ₱890.5M | 77% | High risk63 | Flagged0.048 |
| 12 | 18KJ0189CONSTRUCTION OF MT. MALINDANG ECO TOURISM ROAD, CLARIN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱237.2M | 100% | High risk62 | —-0.053 |
| 13 | 18K00156ROAD WIDENING OF OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA RD-K1762+227-K1764+177,K1764+276-K176 | Region X | Region X | Completed | ₱162.9M | 100% | High risk62 | —-0.065 |
| 14 | 23C00072FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER NORTH APPROACH DOWNSTREAM, BOTOLAN, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | Completed | ₱96.5M | 100% | High risk62 | —-0.074 |
| 15 | 19K00325CONSTRUCTION OF OROQUIETA CITY BYPASS ROAD, MISAMIS OCCIDENTAL | Region X | Region X | Completed | ₱102.8M | 100% | High risk60 | —-0.041 |
| 16 | 25CI0006FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBALEN RIVER, PHASE 2, BARANGAY ATLU BOLA TO BARANGAY MANGALIT, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱115.8M | 100% | Medium risk58 | —-0.075 |
| 17 | 25CI0040FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER, DOWNSTREAM OF OF QUITANGIL BRIDGE, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱103.1M | 69% | Medium risk58 | —-0.035 |
| 18 | 24A00064CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL (LA UNION)-KIBUNGAN (BENGUET) ROAD, PACKAGE 5, LA UNION | Region I | Region I | On-Going | ₱154.4M | 92% | Medium risk57 | —-0.025 |
| 19 | 24A00057CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL-SAN GABRIEL (LA UNION) - KAPANGAN (BENGUET) ROAD, LA UNION | Region I | Region I | On-Going | ₱154.4M | 93% | Medium risk57 | —-0.026 |
| 20 | 25K00386PREVENTIVE MAINTENANCE-PRIMARY ROADS ILIGAN CITY-MARAWI CITY RD-(S01709MN) CHAINAGE 268-CHAINAGE 4200 | Region X | Region X | On-Going | ₱93.9M | 57% | Medium risk56 | —-0.039 |
| 21 | 21JA0018CONSTRUCTION OF SHORELINE PROTECTION, SINUNUC SECTION, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱40.9M | 100% | Medium risk56 | —-0.068 |
| 22 | 18JE0059CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WITH STEEL SHEET PILE ALONG MAPANGI RIVER, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱48.2M | 100% | Medium risk56 | —-0.073 |
| 23 | 19JE0039CONSTRUCTION OF REVETMENT ALONG MAPANGI RIVER, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱47.3M | 100% | Medium risk56 | —-0.073 |
| 24 | 22K00149CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OROQUIETA CITY COASTAL BYPASS ROAD, MISAMIS OCCIDENTAL | Region X | Region X | Completed | ₱91.6M | 100% | Medium risk54 | —-0.082 |
| 25 | 18KJ0004ROAD WIDENING OZAMIZ-OROQUIETA ROAD K1708+506-K1709+960, K1710+180-K1712+187 | Region X | Misamis Occidental 2nd DEO | Completed | ₱91.7M | 100% | Medium risk53 | —-0.078 |