Opening the dossier…
Opening the dossier…
Contractor dossier
312 projects on file, including joint ventures this contractor is part of.
Total projects
312
Total budget
₱13.2B
Average progress
94.3%
Completion rate
84.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.9 | 0 | 97.4% |
| Region III | 75 | ₱2.8B | 37.2 | 0 | 96.7% |
| Region IV-A | 30 | ₱1.8B | 53.3 | 1 | 90.5% |
| Region XI | 26 | ₱461.6M | 31.7 | 0 | 100.0% |
| Region I | 18 | ₱1.1B | 57.2 | 2 | 77.5% |
| Region IV-B | 17 | ₱2.3B | 56.0 | 2 | 93.8% |
| Region VIII | 13 | ₱745.2M | 51.7 | 1 | 82.7% |
| Region VI | 8 | ₱306.6M | 47.8 | 0 | 100.0% |
| Region X | 8 | ₱83.4M | 40.5 | 1 | 89.1% |
| Region II | 5 | ₱67.2M | 45.4 | 0 | 100.0% |
| Region IX | 4 | ₱417.5M | 71.6 | 0 | 83.9% |
| Region XII | 2 | ₱257.5M | 61.4 | 1 | 71.9% |
| Negros Island Region | 2 | ₱188.2M | 57.7 | 0 | 83.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱3.9B | 42.3 | 1 | 94.9% |
| Buildings and Facilities | 103 | ₱2B | 38.7 | 2 | 95.4% |
| Flood Control and Drainage | 83 | ₱6.5B | 53.6 | 2 | 93.3% |
| Bridges | 11 | ₱196.8M | 47.3 | 0 | 100.0% |
| OTHER | 5 | ₱431.5M | 69.6 | 1 | 85.8% |
| GAA 2025 OO-2 | 2 | ₱86.7M | 88.1 | 1 | 59.4% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.4 | 1 | 44.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25OA0005CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 8, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 64% | High risk89 | —-0.012 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24CL0050CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CL0049CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23CC0250CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K003+120 TO K003+420) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 24J00036CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 3 | Region IX | Region IX | On-Going | ₱138.6M | 93% | High risk75 | —-0.014 |
| 24OB0290CONSTRUCTION OF ROAD NETWORK CONNECTING THE NEW RFU-NCR BUILDING TO THE MAIN GATE OF CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 85% | High risk73 | —-0.001 |
| 23J00023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE (DOWNSTREAM-BOTHSIDE | Region IX | Region IX | Completed | ₱110.5M | 100% | High risk73 | —-0.062 |
| 23D00099CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 2 | Region IV-A | Region IV-A | Completed | ₱99.6M | 100% | High risk72 | —-0.027 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 24A00425BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BARANGAY MEDINA, DINGRAS, ILOCOS NORTE (PHASE IV) | Region I | Region I | Completed | ₱49.5M | 100% | High risk71 | —-0.034 |
| 25J00051PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1928+000.00 - K1928+032.00, K1928+032.00- K 1928+972.00 | Region IX | Region IX | On-Going | ₱72.2M | 43% | High risk71 | —-0.005 |
| 24CC0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | High risk69 | —-0.063 |
| 24A00426BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEMS ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱49.5M | 100% | High risk69 | —-0.061 |
| 25CC0179CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 99% | High risk69 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 23E00117SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 86% | High risk67 | Flagged0.004 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 23EB0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PATRICK RIVER, CLAUDIO SALGADO SECTION, STA. 0+000-STA. 0+310, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱45.1M | 100% | Medium risk39 | —-0.072 |
| 227 | 23CD0090CONSTRUCTION OF 3 STOREY MULTI-PURPOSE BUILDING, CAY-POMBO ELEMENTARY SCHOOL, BRGY. CAY-POMBO, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱39.6M | 100% | Medium risk37 | —-0.101 |
| 228 | 23C00290BASIC INFRASTRUCTURE PROGRAM-ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. MARONGUILLO-BRGY. PASONG BANGKAL, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱48.8M | 100% | Medium risk37 | —-0.104 |
| 229 | 23CC0276CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PARULAN, PLARIDEL, BULACAN (K016+331 TO K016+631) PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk37 | —-0.088 |
| 230 | 22CD0010CONSTRUCTION OF ADDITIONAL PUMPING STATION AT BARANGAY CALVARIO, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.1M | 100% | Medium risk37 | —-0.093 |
| 231 | 20CD0144CONSTRUCTION OF PUMPING STATION AT REGOSO ST., BRGY. SALUYSOY, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱22.9M | 100% | Medium risk37 | —-0.093 |
| 232 | 20EA0031CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MARINDUQUE NATIONAL HIGH SCHOOL. BRGY. ISOK I, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱19.8M | 100% | Medium risk37 | —-0.084 |
| 233 | 23CD0079UPGRADING OF ROADS WITH DRAINAGE CANAL, PESO ST., BRGY. PANDAYAN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.104 |
| 234 | 23CC0106CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BARANGAY SAN JOSE, PAMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | Medium risk36 | —-0.086 |
| 235 | 20CD0080CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | Medium risk36 | —-0.107 |
| 236 | 23CC0229CONSTRUCTION OF REVETMENT ALONG HAGONOY RIVER AT BARANGAY SAN ROQUE, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.089 |
| 237 | 23CG0132FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS AT MALISIK RIVER PHASE I, BARANGAY BARANGCA, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱70.2M | 100% | Medium risk35 | —-0.089 |
| 238 | 23CC0251CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY TANGOS, BALIUAG, BULACAN (K003+961 TO K004+261), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.089 |
| 239 | 19CC0277CONSTRUCTION OF MULTI-PURPOSE BUILDING PULILAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.7M | 100% | Medium risk35 | —-0.101 |
| 240 | 23CG0009SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF BYPASS ROAD (SAN ESTEBAN) MACABEBE - MALAULI, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱45.4M | 100% | Medium risk34 | —-0.102 |
| 241 | 19CC0269CONSTRUCTION OF 2 STOREY MULTI-PURPOSE BUILDING BRGY. LONGOS, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.5M | 100% | Medium risk34 | —-0.105 |
| 242 | 21CC0085CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMARAWAN, CITY OF MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19M | 100% | Medium risk34 | —-0.093 |
| 243 | 23CC0020CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BARANGAY BINAKOD, PAMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱47M | 100% | Medium risk34 | —-0.092 |
| 244 | 20CD0030COMPLETION OF MULTI-PURPOSE BUILDING, CAMP TECSON TARTARO, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱7.4M | 100% | Medium risk34 | —-0.107 |
| 245 | 21CC0208CONSTRUCTION OF MULTI-PURPOSE BUILDING, PINAGKUARTELAN ELEMENTARY SCHOOL, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.108 |
| 246 | 22CC0238CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUROL 2ND E.S., BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.9M | 100% | Medium risk34 | —-0.107 |
| 247 | 20CD0026ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERLAY - STA. MARIA - NORZAGARAY ROAD K0037+126 - K0037+600 ; K0039+000 - K0040+200; K0041+442 - K0041+1035 | Region III | Bulacan 2nd DEO | Completed | ₱15.2M | 100% | Medium risk33 | —-0.106 |
| 248 | 22CC0297CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TARACAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.108 |
| 249 | 23CC0142CONSTRUCTION OF CONCRETE SLOPE PROTECTION ALONG GUIGUINTO RIVER TABANG (TRIBUTARY) SECTION, K002+850 - K003+210, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | Medium risk33 | —-0.092 |
| 250 | 23CC0022CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BARANGAY SAN ISIDRO I, PAMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.092 |