Contractor dossier
312 projects on file, including joint ventures this contractor is part of.
Total projects
312
Total budget
₱13.2B
Average progress
94.3%
Completion rate
84.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.9 | 0 | 97.4% |
| Region III | 75 | ₱2.8B | 37.2 | 0 | 96.7% |
| Region IV-A | 30 | ₱1.8B | 53.3 | 1 | 90.5% |
| Region XI | 26 | ₱461.6M | 31.7 | 0 | 100.0% |
| Region I | 18 | ₱1.1B | 57.2 | 2 | 77.5% |
| Region IV-B | 17 | ₱2.3B | 56.0 | 2 | 93.8% |
| Region VIII | 13 | ₱745.2M | 51.7 | 1 | 82.7% |
| Region VI | 8 | ₱306.6M | 47.8 | 0 | 100.0% |
| Region X | 8 | ₱83.4M | 40.5 | 1 | 89.1% |
| Region II | 5 | ₱67.2M | 45.4 | 0 | 100.0% |
| Region IX | 4 | ₱417.5M | 71.6 | 0 | 83.9% |
| Region XII | 2 | ₱257.5M | 61.4 | 1 | 71.9% |
| Negros Island Region | 2 | ₱188.2M | 57.7 | 0 | 83.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱3.9B | 42.3 | 1 | 94.9% |
| Buildings and Facilities | 103 | ₱2B | 38.7 | 2 | 95.4% |
| Flood Control and Drainage | 83 | ₱6.5B | 53.6 | 2 | 93.3% |
| Bridges | 11 | ₱196.8M | 47.3 | 0 | 100.0% |
| OTHER | 5 | ₱431.5M | 69.6 | 1 | 85.8% |
| GAA 2025 OO-2 | 2 | ₱86.7M | 88.1 | 1 | 59.4% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.4 | 1 | 44.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25OA0005CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 8, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 64% | High risk89 | —-0.012 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24CL0050CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CL0049CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23CC0250CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K003+120 TO K003+420) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 24J00036CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 3 | Region IX | Region IX | On-Going | ₱138.6M | 93% | High risk75 | —-0.014 |
| 24OB0290CONSTRUCTION OF ROAD NETWORK CONNECTING THE NEW RFU-NCR BUILDING TO THE MAIN GATE OF CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 85% | High risk73 | —-0.001 |
| 23J00023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE (DOWNSTREAM-BOTHSIDE | Region IX | Region IX | Completed | ₱110.5M | 100% | High risk73 | —-0.062 |
| 23D00099CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 2 | Region IV-A | Region IV-A | Completed | ₱99.6M | 100% | High risk72 | —-0.027 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 24A00425BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BARANGAY MEDINA, DINGRAS, ILOCOS NORTE (PHASE IV) | Region I | Region I | Completed | ₱49.5M | 100% | High risk71 | —-0.034 |
| 25J00051PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1928+000.00 - K1928+032.00, K1928+032.00- K 1928+972.00 | Region IX | Region IX | On-Going | ₱72.2M | 43% | High risk71 | —-0.005 |
| 24CC0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | High risk69 | —-0.063 |
| 24A00426BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEMS ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱49.5M | 100% | High risk69 | —-0.061 |
| 25CC0179CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 99% | High risk69 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 23E00117SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 86% | High risk67 | Flagged0.004 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22DK0196LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF SOUTHERN LUZON MULTI-SPECIALTY MEDICAL CENTER, TAYABAS CITY, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.086 |
| 52 | 20CD0025ASSET PRESERVATION PREVENTIVE MAINTENANCE STA. MARIA NORZAGARAY ROAD K0041+1035 K0042+669 | Region III | Bulacan 2nd DEO | Completed | ₱5.4M | 100% | High risk61 | —-0.042 |
| 53 | 23CL0044REHABILITATION OF FLOOD CONTROL STRUCTURE AT BUCAO RIVER, UPSTREAM, PHASE VIII, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 81% | High risk61 | —-0.025 |
| 54 | 20OG0056CONSTRUCTION OF LIVING QUARTERS AT CAMP KARINGAL, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱91.9M | 100% | High risk61 | —-0.080 |
| 55 | 23A00114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY SAN ANTONIO, ARINGAY, LA UNION | Region I | Region I | Completed | ₱115.8M | 100% | High risk61 | —-0.050 |
| 56 | 21DO0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-REPAIR/REHABILITATION OF MARIKINA INFANTA-INFANTA ROAD, K0047+000 TO K0052+000, TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 57 | 23LF0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAGANGA-MAHAN-UB-RIVER, STA.0+000-STA.0+500, BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.053 |
| 58 | 23E00016CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG PINPIN RIVER, SITIO BAGONG SIKAT, BRGY. PINAGTULIRAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk59 | —-0.061 |
| 59 | 22BA0005CONSTRUCTION OF MISSING LINKS/NEW ROADS: SAN VICENTE- SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD - PACKAGE 5, BRGY. CHAVAYAN, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱19.6M | 100% | Medium risk59 | —-0.040 |
| 60 | 23E00015CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, MAGSIKAP SECTION, RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk59 | —-0.060 |
| 61 | 23OG0051CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TATALON, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱72.4M | 100% | Medium risk57 | —-0.085 |
| 62 | 23CC0074CONSTRUCTION OF RIVER CONTROL PROJECT ALONG GUIGUINTO RIVER, BARANGAY ILANG-ILANG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.4M | 100% | Medium risk57 | —-0.078 |
| 63 | 25A00191CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD (SANTOL SECTION), LA UNION | Region I | Region I | On-Going | ₱93.3M | 36% | Medium risk57 | —-0.027 |
| 64 | 24A00065CONSTRUCTION OF MISSING LINKS / NEW ROADS, NAGUILIAN-BAGULIN-KAPANGAN ROAD, BAGULIN, PACKAGE 3, LA UNION | Region I | Region I | Completed | ₱154.4M | 100% | Medium risk56 | —-0.064 |
| 65 | 23C00233FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER, BARANGAY UPIG, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 66 | 25A00281NATIONAL BUILDING PROGRAM - CONSTRUCTION/IMPROVEMENT OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) REGIONAL OFFICE I BUILDING, AGUILA ROAD, SEVILLA, CITY OF SAN FERNANDO, LA UNION | Region I | Region I | On-Going | ₱57.3M | 3% | Medium risk55 | —-0.010 |
| 67 | 25A00294SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF HALL OF JUSTICE, PHASE III, BRGY. SAN AGUSTIN EAST, AGOO, LA UNION | Region I | Region I | On-Going | ₱56.8M | 88% | Medium risk55 | —-0.041 |
| 68 | 23OE0153CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 600 ZONE 59, SANTA MESA, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49.5M | 100% | Medium risk55 | —-0.098 |
| 69 | 24OB0365REHABILITATION OF MARIKINA POLYTECHNIC COLLEGE ROAD NETWORK, MARIKINA CITY PH2 | National Capital Region | Metro Manila 1st DEO | Completed | ₱76.8M | 100% | Medium risk55 | —-0.090 |
| 70 | 23A00298BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, NAGUILIAN-BAGULIN-KAPANGAN ROAD, BAGULIN, LA UNION (PACKAGE 2) | Region I | Region I | Completed | ₱99M | 100% | Medium risk54 | —-0.076 |
| 71 | 23DP0052ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD- K0092 + 225 - K0094 + 000 | Region IV-A | Laguna 3rd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.104 |
| 72 | 23GM0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DANCALAN-CANDONI-DAMUTAN VALLEY RD - K0143+700 - K0143+820, K0145+300 - K0145+500, CANDONI, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱91.7M | 100% | Medium risk54 | —-0.079 |
| 73 | 23E00147SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SL;OPE PROTECTION STRUCTURE ALONG PAGASA SABLAYAN TO VICTORIA ROAD, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk54 | —-0.079 |
| 74 | 23E00144SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG APYAS-MANANAO APYAS SECTION, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.077 |
| 75 | 23GA0038CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER BRGY. PUSIW, NUMANCIA, AKLAN | Region VI | Aklan DEO | Completed | ₱86.8M | 100% | Medium risk53 | —-0.061 |