Contractor dossier
312 projects on file, including joint ventures this contractor is part of.
Total projects
312
Total budget
₱13.2B
Average progress
94.3%
Completion rate
84.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.9 | 0 | 97.4% |
| Region III | 75 | ₱2.8B | 37.2 | 0 | 96.7% |
| Region IV-A | 30 | ₱1.8B | 53.3 | 1 | 90.5% |
| Region XI | 26 | ₱461.6M | 31.7 | 0 | 100.0% |
| Region I | 18 | ₱1.1B | 57.2 | 2 | 77.5% |
| Region IV-B | 17 | ₱2.3B | 56.0 | 2 | 93.8% |
| Region VIII | 13 | ₱745.2M | 51.7 | 1 | 82.7% |
| Region VI | 8 | ₱306.6M | 47.8 | 0 | 100.0% |
| Region X | 8 | ₱83.4M | 40.5 | 1 | 89.1% |
| Region II | 5 | ₱67.2M | 45.4 | 0 | 100.0% |
| Region IX | 4 | ₱417.5M | 71.6 | 0 | 83.9% |
| Region XII | 2 | ₱257.5M | 61.4 | 1 | 71.9% |
| Negros Island Region | 2 | ₱188.2M | 57.7 | 0 | 83.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱3.9B | 42.3 | 1 | 94.9% |
| Buildings and Facilities | 103 | ₱2B | 38.7 | 2 | 95.4% |
| Flood Control and Drainage | 83 | ₱6.5B | 53.6 | 2 | 93.3% |
| Bridges | 11 | ₱196.8M | 47.3 | 0 | 100.0% |
| OTHER | 5 | ₱431.5M | 69.6 | 1 | 85.8% |
| GAA 2025 OO-2 | 2 | ₱86.7M | 88.1 | 1 | 59.4% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.4 | 1 | 44.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25OA0005CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 8, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 64% | High risk89 | —-0.012 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24CL0050CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CL0049CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23CC0250CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K003+120 TO K003+420) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 24J00036CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 3 | Region IX | Region IX | On-Going | ₱138.6M | 93% | High risk75 | —-0.014 |
| 24OB0290CONSTRUCTION OF ROAD NETWORK CONNECTING THE NEW RFU-NCR BUILDING TO THE MAIN GATE OF CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 85% | High risk73 | —-0.001 |
| 23J00023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE (DOWNSTREAM-BOTHSIDE | Region IX | Region IX | Completed | ₱110.5M | 100% | High risk73 | —-0.062 |
| 23D00099CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 2 | Region IV-A | Region IV-A | Completed | ₱99.6M | 100% | High risk72 | —-0.027 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 24A00425BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BARANGAY MEDINA, DINGRAS, ILOCOS NORTE (PHASE IV) | Region I | Region I | Completed | ₱49.5M | 100% | High risk71 | —-0.034 |
| 25J00051PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1928+000.00 - K1928+032.00, K1928+032.00- K 1928+972.00 | Region IX | Region IX | On-Going | ₱72.2M | 43% | High risk71 | —-0.005 |
| 24CC0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | High risk69 | —-0.063 |
| 24A00426BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEMS ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱49.5M | 100% | High risk69 | —-0.061 |
| 25CC0179CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 99% | High risk69 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 23E00117SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 86% | High risk67 | Flagged0.004 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 20OH0065OO1:ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHAB./MAJOR REPAIR OF PERMANENT BRID | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.064 |
| 152 | 20OH0030OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHAB./MAJOR REPAIR OF PERMANENT BR | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.064 |
| 153 | 22BA0028REHABILITATION/MAJOR REPAIR OF ITBUD BRIDGE (B00017BN) ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD, BRGY. ITBUD, UYUGAN, BATANES | Region II | Batanes DEO | Completed | ₱8.5M | 100% | Medium risk47 | —-0.040 |
| 154 | 20LE0058WIDENING OF PERMANENT BRIDGES: BITON 2 PARALLEL BR. ALONG DAVAO-SARANGANI COASTAL RD (MALALAG-MALITA-JAS-G), DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱29.2M | 100% | Medium risk47 | —-0.059 |
| 155 | 20LE0059WIDENING OF PERMANENT BRIDGES: TALOGOY PARALLEL BR. ALONG DAVAO-SARANGANI COASTAL RD (MALALAG-MALITA-JAS-G), MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱29.2M | 100% | Medium risk47 | —-0.059 |
| 156 | 20LE0057WIDENING OF PERMANENT BRIDGES: BITON 1 PARALLEL BR. ALONG DAVAO-SARANGANI COASTAL RD (MALALAG-MALITA-JAS-G), DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱29.2M | 100% | Medium risk47 | —-0.059 |
| 157 | 19OB0022REHABILITATION/ MAJOR REPAIR OF C-5/ORTIGAS FLYOVER (B03319LZ) ALONG C5- ORTIGAS FLYOVER, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱22.9M | 100% | Medium risk47 | —-0.065 |
| 158 | 20OH0031OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHAB./MAJOR REPAIR OF PERMANENT BR | National Capital Region | South Manila DEO | Completed | ₱7.7M | 100% | Medium risk47 | —-0.065 |
| 159 | 20DI0037CONSTRUCTION OF REVETMENT ALONG SAN CRISTOBAL RIVER, BRGY. LOOC, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱27.9M | 100% | Medium risk47 | —-0.077 |
| 160 | 19OH0177LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CON | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.098 |
| 161 | 23M00087CONSTRUCTION OF CONCRETE ROAD - NRJ TO SITIO SEWAL LEADING TO LAGBASAN CAVE PASSING THRU BURIAL CAVE, STA. 7+503-STA. 9+583, BRGY. KUDEN, SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱122.1M | 100% | Medium risk47 | —-0.072 |
| 162 | 20DK0011CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ILOG RIVER, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.089 |
| 163 | 21LE0021OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - HI-WAY JCT. MANA-LITTLE BAGUIO ROAD STA. 1660+446 - STA .1661+783, LAGUMIT, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱23.5M | 100% | Medium risk46 | —-0.089 |
| 164 | 21DO0050LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT MASCAP RIVER SITIO MASCAP PROPER... | Region IV-A | Rizal 2nd DEO | Completed | ₱28.7M | 100% | Medium risk46 | —-0.085 |
| 165 | 20GD0021CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF PANAY RIVER CONTROL (DOWNSTREAM OF PUNTA TABUC BRIDGE), ROXAS CITY, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱23.8M | 100% | Medium risk46 | —-0.071 |
| 166 | 22IL0074CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF KAWAYAN FLOOD CONTROL, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱25M | 100% | Medium risk46 | —-0.071 |
| 167 | 20LD0010CONSTRUCTION OF CONCRETE ROAD-TUBOD-LIBERTAD-BITAUG ROAD CONNECTING TRIBAL WEAVERS WOMEN ASSOCIATION (TWWA) AND DAVAO-COTABATO ROAD(COTABATO SECTION) IN SUPPORT OF WEARABLE INDUSTRY, BANSALAN, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.090 |
| 168 | 20LE0037ASSET PRESERVATION - PREVENTIVE MAINTENANCE - REHAB/RECONST/UPGRADING OF DAMAGED PAVED RD. - SECONDARY ROADS, DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-GLAN) (K1604+000 - K1605+284) | Region XI | Davao Occidental DEO | Completed | ₱25.2M | 100% | Medium risk46 | —-0.089 |
| 169 | 20OH0128LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL | National Capital Region | South Manila DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.100 |
| 170 | 20OH0134LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL | National Capital Region | South Manila DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.101 |
| 171 | 20OH0141LOCAL PROGRAM-CONST/REPAIR/REHAB/IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- LOCAL R | National Capital Region | South Manila DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.101 |
| 172 | 21OG0007REHABILITATION OF ROAD AT BARANGAY SOUTH TRIANGLE, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.101 |
| 173 | 21LE0017OFF-CARRIAGEWAY/IMPROVEMENT-SECONDARY ROADS ALONG DAVAO-SARANGANI COASTAL RD (MALALAG-MALITA-JAS-G) K1692+700 - K1694+239, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱25.9M | 100% | Medium risk46 | —-0.089 |
| 174 | 20LE0035ASSET PRESERVATION - PREVENTIVE MAINTENANCE - REHAB / RECONST / UPGRADING OF DAMAGED PAVED ROAD - SECONDARY ROADS, DAVAO-SARANGANI COASTAL ROAD, (MALALAG-MALITA-JAS-GLAN), SECT. A: K1600+000 - K1600+036 ; SECT. B: K1600+036 - K1600+936) | Region XI | Davao Occidental DEO | Completed | ₱25.7M | 100% | Medium risk46 | —-0.090 |
| 175 | 21OC0037CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF VILLANUEVA CREEK FROM AGUIRRE TO FILIPINAS AVE.,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.084 |