Contractor dossier
312 projects on file, including joint ventures this contractor is part of.
Total projects
312
Total budget
₱13.2B
Average progress
94.3%
Completion rate
84.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.9 | 0 | 97.4% |
| Region III | 75 | ₱2.8B | 37.2 | 0 | 96.7% |
| Region IV-A | 30 | ₱1.8B | 53.3 | 1 | 90.5% |
| Region XI | 26 | ₱461.6M | 31.7 | 0 | 100.0% |
| Region I | 18 | ₱1.1B | 57.2 | 2 | 77.5% |
| Region IV-B | 17 | ₱2.3B | 56.0 | 2 | 93.8% |
| Region VIII | 13 | ₱745.2M | 51.7 | 1 | 82.7% |
| Region VI | 8 | ₱306.6M | 47.8 | 0 | 100.0% |
| Region X | 8 | ₱83.4M | 40.5 | 1 | 89.1% |
| Region II | 5 | ₱67.2M | 45.4 | 0 | 100.0% |
| Region IX | 4 | ₱417.5M | 71.6 | 0 | 83.9% |
| Region XII | 2 | ₱257.5M | 61.4 | 1 | 71.9% |
| Negros Island Region | 2 | ₱188.2M | 57.7 | 0 | 83.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱3.9B | 42.3 | 1 | 94.9% |
| Buildings and Facilities | 103 | ₱2B | 38.7 | 2 | 95.4% |
| Flood Control and Drainage | 83 | ₱6.5B | 53.6 | 2 | 93.3% |
| Bridges | 11 | ₱196.8M | 47.3 | 0 | 100.0% |
| OTHER | 5 | ₱431.5M | 69.6 | 1 | 85.8% |
| GAA 2025 OO-2 | 2 | ₱86.7M | 88.1 | 1 | 59.4% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.4 | 1 | 44.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25OA0005CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 8, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 64% | High risk89 | —-0.012 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24CL0050CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CL0049CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23CC0250CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K003+120 TO K003+420) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 24J00036CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 3 | Region IX | Region IX | On-Going | ₱138.6M | 93% | High risk75 | —-0.014 |
| 24OB0290CONSTRUCTION OF ROAD NETWORK CONNECTING THE NEW RFU-NCR BUILDING TO THE MAIN GATE OF CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 85% | High risk73 | —-0.001 |
| 23J00023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE (DOWNSTREAM-BOTHSIDE | Region IX | Region IX | Completed | ₱110.5M | 100% | High risk73 | —-0.062 |
| 23D00099CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 2 | Region IV-A | Region IV-A | Completed | ₱99.6M | 100% | High risk72 | —-0.027 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 24A00425BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BARANGAY MEDINA, DINGRAS, ILOCOS NORTE (PHASE IV) | Region I | Region I | Completed | ₱49.5M | 100% | High risk71 | —-0.034 |
| 25J00051PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1928+000.00 - K1928+032.00, K1928+032.00- K 1928+972.00 | Region IX | Region IX | On-Going | ₱72.2M | 43% | High risk71 | —-0.005 |
| 24CC0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | High risk69 | —-0.063 |
| 24A00426BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEMS ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱49.5M | 100% | High risk69 | —-0.061 |
| 25CC0179CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 99% | High risk69 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 23E00117SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 86% | High risk67 | Flagged0.004 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22OB0120REHABILITATION OF ROAD AT BRGY. IBAYO TIPAS, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk46 | —-0.097 |
| 177 | 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
| 178 | 19DK0134CONSTRUCTION OF MULTI-PURPOSE BUILDING (FOOD PROCESSING AND TRAINING CENTER) BARANGAY POBLACION, POLILLO, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.101 |
| 179 | 20OI0003CONST. OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENT AT MANARIGO, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱23.3M | 100% | Medium risk46 | —-0.086 |
| 180 | 23OI0031CONSTRUCTION OF FLOOD CONTROL STRUCTURES, MANARIGO CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱26.3M | 100% | Medium risk46 | —-0.086 |
| 181 | 19GA0209REHAB. OF AKLAN WEST ROAD (S00480PN) BRGY. KABULIHAN, MALAY, AKLAN | Region VI | Aklan DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.084 |
| 182 | 21OD0004REHABILITATION OF ROADS AND DRAINAGE ALONG PABAYA ST., (PHASE II), BRGY. MAPULANG LUPA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.097 |
| 183 | 22OC0062REHABILITATION/UPGRADING AND DRAINAGE IMPROVEMENT AT TRAMO II AND ITS VICINITY, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.086 |
| 184 | 20OB0197REHABILITATION OF DRAINAGE SYSTEM AT KARANGALAN VILLAGE BRGY. MANGGAHAN, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱20.8M | 100% | Medium risk46 | —-0.090 |
| 185 | 21OH0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TIKAS)-CONST. OF MULTI-PURPOSE FACILITY (AREA 3 HELIPAD FOR NIGHT OPERATIONS WITH ESTABLISHED HELICOPTER POINT IN SPACE) PSG COMPOUND, MALACA | National Capital Region | South Manila DEO | Completed | ₱12.7M | 100% | Medium risk46 | —-0.074 |
| 186 | 20OH0076OO1:ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED P | National Capital Region | South Manila DEO | Completed | ₱10.1M | 100% | Medium risk46 | —-0.095 |
| 187 | 20OH0022OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- | National Capital Region | South Manila DEO | Completed | ₱6.2M | 100% | Medium risk46 | —-0.099 |
| 188 | 21OG0010REHABILITATION OF ROAD AT BARANGAY SAN MARTIN DE PORRES, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱7.1M | 100% | Medium risk46 | —-0.099 |
| 189 | 21OH0016LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRA PROGRAM-REHAB OF ROADS AND ALLEYS, ZONE 88, PACO, MANILA | National Capital Region | South Manila DEO | Completed | ₱5.8M | 100% | Medium risk46 | —-0.099 |
| 190 | 20OH0129LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL | National Capital Region | South Manila DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.099 |
| 191 | 20OH0006OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- | National Capital Region | South Manila DEO | Completed | ₱9.1M | 100% | Medium risk46 | —-0.100 |
| 192 | 20OE0136REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS VG CRUZ ST - K0005 + 457.20 TO K0005 + 650.70 | National Capital Region | North Manila DEO | Completed | ₱5.6M | 100% | Medium risk46 | —-0.100 |
| 193 | 20OE0153PREVENTIVE MAINTENANCE - TERTIARY ROADS - MA. CLARA - K0008 + (-094.50) - K0008 + 733.50 | National Capital Region | North Manila DEO | Completed | ₱10.4M | 100% | Medium risk46 | —-0.100 |
| 194 | 20OH0113LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL | National Capital Region | South Manila DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.100 |
| 195 | 22OG0005REHABILITATION OF ROAD, BRGY. TEACHER'S VILLAGE WEST, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱8.8M | 100% | Medium risk46 | —-0.100 |
| 196 | 21OG0019REHABILITATION OF DRAINAGE SYSTEM, SCOUT YBARDOLAZA ST., QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱6.8M | 100% | Medium risk46 | —-0.089 |
| 197 | 23OB0036CONSTRUCTION OF BOX CULVERT RAINBOW STREET, BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱41.9M | 100% | Medium risk45 | —-0.085 |
| 198 | 20OG0105CONSTRUCTION OF 5-STOREY MULTI-PURPOSE BUILDING (LIVING QUARTERS), PHASE 2, CAMP AGUINALDO, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱28.1M | 100% | Medium risk45 | —-0.045 |
| 199 | 21A00063CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, BRGY. NATIVIDAD, NAGUILIAN, LA UNION | Region I | Region I | Completed | ₱29M | 100% | Medium risk45 | —-0.071 |
| 200 | 23KL0044CONSTRUCTION OF LAPAD, LAGUINDINGAN TO LOURDES ALUBIJID ROAD, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.096 |