Opening the dossier…
Opening the dossier…
Contractor dossier
312 projects on file, including joint ventures this contractor is part of.
Total projects
312
Total budget
₱13.2B
Average progress
94.3%
Completion rate
84.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.9 | 0 | 97.4% |
| Region III | 75 | ₱2.8B | 37.2 | 0 | 96.7% |
| Region IV-A | 30 | ₱1.8B | 53.3 | 1 | 90.5% |
| Region XI | 26 | ₱461.6M | 31.7 | 0 | 100.0% |
| Region I | 18 | ₱1.1B | 57.2 | 2 | 77.5% |
| Region IV-B | 17 | ₱2.3B | 56.0 | 2 | 93.8% |
| Region VIII | 13 | ₱745.2M | 51.7 | 1 | 82.7% |
| Region VI | 8 | ₱306.6M | 47.8 | 0 | 100.0% |
| Region X | 8 | ₱83.4M | 40.5 | 1 | 89.1% |
| Region II | 5 | ₱67.2M | 45.4 | 0 | 100.0% |
| Region IX | 4 | ₱417.5M | 71.6 | 0 | 83.9% |
| Region XII | 2 | ₱257.5M | 61.4 | 1 | 71.9% |
| Negros Island Region | 2 | ₱188.2M | 57.7 | 0 | 83.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱3.9B | 42.3 | 1 | 94.9% |
| Buildings and Facilities | 103 | ₱2B | 38.7 | 2 | 95.4% |
| Flood Control and Drainage | 83 | ₱6.5B | 53.6 | 2 | 93.3% |
| Bridges | 11 | ₱196.8M | 47.3 | 0 | 100.0% |
| OTHER | 5 | ₱431.5M | 69.6 | 1 | 85.8% |
| GAA 2025 OO-2 | 2 | ₱86.7M | 88.1 | 1 | 59.4% |
| GAA 2025 SSP | 1 | ₱95.5M | 95.4 | 1 | 44.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25OA0005CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 8, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱49M | 64% | High risk89 | —-0.012 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24CL0050CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 8, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CL0049CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 7, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 98% | High risk82 | —-0.013 |
| 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23CC0250CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K003+120 TO K003+420) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 24J00036CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 3 | Region IX | Region IX | On-Going | ₱138.6M | 93% | High risk75 | —-0.014 |
| 24OB0290CONSTRUCTION OF ROAD NETWORK CONNECTING THE NEW RFU-NCR BUILDING TO THE MAIN GATE OF CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 85% | High risk73 | —-0.001 |
| 23J00023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE (DOWNSTREAM-BOTHSIDE | Region IX | Region IX | Completed | ₱110.5M | 100% | High risk73 | —-0.062 |
| 23D00099CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 2 | Region IV-A | Region IV-A | Completed | ₱99.6M | 100% | High risk72 | —-0.027 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 24A00425BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BARANGAY MEDINA, DINGRAS, ILOCOS NORTE (PHASE IV) | Region I | Region I | Completed | ₱49.5M | 100% | High risk71 | —-0.034 |
| 25J00051PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1928+000.00 - K1928+032.00, K1928+032.00- K 1928+972.00 | Region IX | Region IX | On-Going | ₱72.2M | 43% | High risk71 | —-0.005 |
| 24CC0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | High risk69 | —-0.063 |
| 24A00426BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEMS ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱49.5M | 100% | High risk69 | —-0.061 |
| 25CC0179CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG BALAGTAS RIVER, BARANGAY SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 99% | High risk69 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00040CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.9M | 0% | High risk76 | Flagged0.040 |
| 23M00090CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78 | Region XII | Region XII | On-Going | ₱135.5M | 44% | High risk76 | Flagged0.037 |
| 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 25DN0052CONSTRUCTION OF BARANGAY LUNSAD TO BARANGAY PILA-PILA COASTAL ROAD (PHASE 2), BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱95.5M | 44% | High risk95 | Flagged0.017 |
| 25A00533BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAGUPAN, PANGASINAN | Region I | Region I | On-Going | ₱57.8M | 0% | High risk71 | Flagged0.010 |
| 23E00117SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱221.9M | 86% | High risk67 | Flagged0.004 |
| 25AE0010CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, BARANGAY BULALAAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱37.7M | 55% | High risk87 | Flagged0.004 |
| 24KL0112CONRETING OF BRGY. TULA FMR, BRGY. TULA, ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk46 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 25KH0076CONSTRUCTION OF ACCESS ROAD, BARANGAY IPONAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.8M | 88% | Medium risk45 | —-0.056 |
| 202 | 22OB0220CONSTRUCTION OF MULTI-PURPOSE BUILDING (NHA), PHASE 3, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.7M | 100% | Medium risk45 | —-0.102 |
| 203 | 25KH0055REHABILITATION/IMPROVEMENT OF ROAD AT BARANGAY PATAG, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.8M | 39% | Medium risk45 | —-0.046 |
| 204 | 25KH0020REHABILITATION OF ROAD IN BARANGAY IPONAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱9.7M | 86% | Medium risk45 | —-0.056 |
| 205 | 20OI0093CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT POBLACION E/S, BRGY. POBLACION, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱24.7M | 100% | Medium risk44 | —-0.044 |
| 206 | 20LA0085CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, LAAK COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.086 |
| 207 | 20DK0008CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG UMIRAY RIVER, GENERAL NAKAR, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.087 |
| 208 | 23KA0137CONSTRUCTION OF LOCAL ROAD, PROPER MAINAGA, BARANGAY IBA, CABANGLASAN, BUKIDNONBARANGAY IBA, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱12.9M | 100% | Medium risk44 | —-0.088 |
| 209 | 20OC0127CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOMS WITH ROOF DECK, F. SERRANO SR. ELEMENTARY SCHOOL-DON BOSCOCITY OF PARAÑAQUE, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱24.2M | 100% | Medium risk44 | —-0.043 |
| 210 | 24E00239LGU HOSPITALS - PALUAN COMMUNITY HOSPITAL, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱38.4M | 22% | Medium risk44 | Flagged0.025 |
| 211 | 21LE0038CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MALAWAY FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.076 |
| 212 | 23KA0149CONSTRUCTION OF DRAINAGE STRUCTURE, MUNICIPAL FARMERS MARKET, POBLACION, CABANGLASAN, BUKIDNONPOBLACION, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.074 |
| 213 | 20CD0171CONSTRUCTION OF 2 STOREY 8 CLASSROOM APUGAN ELEMENTARY SCHOOL, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱23.9M | 100% | Medium risk43 | —-0.025 |
| 214 | 25AE0001PREVENTIVE MAINTENANCE-PRIMARY ROADS - MANILA NORTH ROAD - K0270+599 - K0271+221 | Region I | La Union 1st DEO | Completed | ₱19.8M | 100% | Medium risk43 | —-0.086 |
| 215 | 23EB0039CONSTRUCTION OF TANYAG FLOOD CONTROL STRUCTURE ALONG LUMINTAO RIVER, SITIO ALIPUNDO, STA. 0 + 000 - STA. 0 + 604, CALINTAAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49.2M | 100% | Medium risk43 | —-0.073 |
| 216 | 20GB0128CONSTRUCTION OF 2 UNITS 1 STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT APONG ELEMENTARY SCHOOL SIBALO | Region VI | Antique DEO | Completed | ₱9.8M | 100% | Medium risk42 | —-0.035 |
| 217 | 23EH0136CONSTRUCTION OF SAN ROQUE INTERIOR ROAD, BRGY. SAN ROQUE, ALCANTARA, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱49.5M | 100% | Medium risk42 | —-0.091 |
| 218 | 21CD0089REHABILITATION OF MULTI-PURPOSE BUILDING AT BARANGAY GAYA-GAYA, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱28.8M | 100% | Medium risk42 | —-0.100 |
| 219 | 22BA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLOPE COLLAPSE, AND LANDSLIDE: SAN VICENTE-SAVIDUG- CHAVAYAN-SUMNANGA-NAKANMUAN ROAD-K0018+630-K0018+856 | Region II | Batanes DEO | Completed | ₱21.5M | 100% | Medium risk41 | —-0.074 |
| 220 | 21LE0156CONCRETING OF BRGY. SAN ANTONIO TO BRGY. KINILIDAN FMR, BRGY. SAN ANTONIO, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.032 |
| 221 | 21LE0174CONCRETING OF JCT. NATIONAL HIGHWAY (SANGHAY)-TAYUAN BIO ROAD FMR, BRGY. SANGHAY, MALITA, DAVAO OCCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.032 |
| 222 | 22BA0015REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: TERTIARY ROADS: SAN VICENTE- SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD-K0006+192-K0006+490 | Region II | Batanes DEO | Completed | ₱9.8M | 100% | Medium risk41 | —-0.072 |
| 223 | 23CC0173ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PLARIDEL BYPASS RD - K0036+785 - K0037+053, K0040+000 - K0043+500, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱79.1M | 100% | Medium risk40 | —-0.096 |
| 224 | 22CD0090CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GAYA-GAYA, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.107 |
| 225 | 22BA0014REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: TERTIARY ROADS: SAN VICENTE-SAVIDUG- CHAVAYAN-SUMNANGA-NAKANMUAN ROAD-K0005+885- K0006+192 | Region II | Batanes DEO | Completed | ₱7.8M | 100% | Medium risk39 | —-0.072 |