Opening the dossier…
Opening the dossier…
Contractor dossier
55 projects on file, including joint ventures this contractor is part of.
Total projects
55
Total budget
₱538M
Average progress
95.9%
Completion rate
87.3%
Average risk score
42.5
Medium risk on average, out of 100
Flagged as unusual
1
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 55 | ₱538M | 42.5 | 1 | 95.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 50 | ₱367.1M | 40.8 | 0 | 97.7% |
| Roads | 3 | ₱44.8M | 54.3 | 0 | 62.9% |
| OTHER | 1 | ₱77.2M | 78.4 | 1 | 100.0% |
| Flood Control and Drainage | 1 | ₱48.9M | 58.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17F00011MFO1-NATIONAL ROAD NETWORK SERVICES, ROAD UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS(HDM-4 PROJECT ANALYSIS) SAN PASCUAL-CLAVERIA ROAD, K025+900 TO K041+980 WITH EXCEPTIONS,BURIAS I | Region V | Region V | Completed | ₱77.2M | 100% | High risk78 | Flagged0.004 |
| 20FB0010LOCAL PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGUMBAYAN ELEMENTARY SCHOOL, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.099 |
| 18FB0243LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF ALBAY FARMER'S VILLAGE (MPB), BARANGAY CABANGAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.098 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17F00011MFO1-NATIONAL ROAD NETWORK SERVICES, ROAD UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS(HDM-4 PROJECT ANALYSIS) SAN PASCUAL-CLAVERIA ROAD, K025+900 TO K041+980 WITH EXCEPTIONS,BURIAS I | Region V | Region V | Completed | ₱77.2M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17F00011MFO1-NATIONAL ROAD NETWORK SERVICES, ROAD UPGRADING(UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS(HDM-4 PROJECT ANALYSIS) SAN PASCUAL-CLAVERIA ROAD, K025+900 TO K041+980 WITH EXCEPTIONS,BURIAS I | Region V | Region V | Completed | ₱77.2M | 100% | High risk78 | Flagged0.004 |
| 2 | 20FB0010LOCAL PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BAGUMBAYAN ELEMENTARY SCHOOL, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.099 |
| 3 | 18FB0243LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF ALBAY FARMER'S VILLAGE (MPB), BARANGAY CABANGAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.098 |
| 4 | 24FB0219CLUSTER 3 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - | Region V | Albay 2nd DEO | On-Going | ₱24.8M | 7% | Medium risk60 | —-0.041 |
| 5 | 25FL0071CONST OF MP BUILDING (COVERED COURT) AT BRGY. STA. ISABEL, BRGY. MANJUNLAD, BRGY. POROPANDAN, BRGY. | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 23% | Medium risk59 | —-0.034 |
| 6 | 20FB0065LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. LAMBA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | Medium risk59 | —-0.098 |
| 7 | 23FB0115SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BRGY. ILULUAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱48.9M | 100% | Medium risk59 | —-0.088 |
| 8 | 18FK0064LOCAL PROGRAM-CONST./REPARI/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROAD-CONCRETING OF GINANGRA BRGY. ROAD, MAGALLANES | Region V | Sorsogon DEO | Completed | ₱12.4M | 100% | Medium risk57 | —-0.100 |
| 9 | 18FJ0073CONSTRUCTION OF TWO (2) UNIT TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT NARO NHS | Region V | Masbate 3rd DEO | Completed | ₱23.3M | 100% | Medium risk55 | —-0.037 |
| 10 | 20FL0075CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. SAN ANTONIO, BARCELONA, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk54 | —-0.094 |
| 11 | 19FH0136CLUSTER 6 - REPAIR / REHABILITATION / CONSTRUCTION OF MULTI-PURPOSE BUILDING IN THE MUNICIPALITY OF BATO AND BARAS, CATANDUANES, BATO AND BARAS, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱14.6M | 100% | Medium risk53 | —-0.095 |
| 12 | 24FH0052BASIC INFRA PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BOTE, BATO, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱4.8M | 91% | Medium risk52 | —-0.053 |
| 13 | 24FH0051BASIC INFRA PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF EVACUATION CENTER, BARANGAY BATALAY, BATO, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱4.8M | 100% | Medium risk52 | —-0.058 |
| 14 | 19F00073CONSTRUCTION/COMPLETION OF EVACUATION CENTER, SITIO MAT-I, BRGY. STO DOMINGO, VINZONS, CAMARINES NORTE | Region V | Region V | On-Going | ₱5.1M | 73% | Medium risk52 | —-0.018 |
| 15 | 21FB0100LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) PHASE 3, BAGUMBAYAN ELEMENTARY SCHOOL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱3.8M | 100% | Medium risk47 | —-0.098 |
| 16 | 24FH0078BASIC INFRA. PROG. (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES, CONST. OF BRGY. ROADS AT PANANAOGAN, SITIO BITAOGAN, BRGY. MARINAWA, BRGY. BALONGBONG, & BRGY. SAN PEDRO, BATO, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱7.6M | 81% | Medium risk46 | —-0.063 |
| 17 | 18FM0046CONSTRUCTION OF TWO(2) STOREY - FOUR(4) CLASSROOM SCHOOL BUILDING AT ANTONIO LEE LLACER SR. INTEGRATED SCHOOL. | Region V | Masbate 1st DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.054 |
| 18 | 18FJ0064CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT NARO NHS (9.5M X 23.0M) | Region V | Masbate 3rd DEO | Completed | ₱9M | 100% | Medium risk46 | —-0.056 |
| 19 | 18FJ0066CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT NARO NHS (9.5M X 23.0M) | Region V | Masbate 3rd DEO | Completed | ₱9M | 100% | Medium risk46 | —-0.056 |
| 20 | 18FJ0065CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT NARO NHS (9.5M X 23.0M) | Region V | Masbate 3rd DEO | Completed | ₱9M | 100% | Medium risk46 | —-0.056 |
| 21 | 18FJ0067CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT NARO NHS (9.5M X 23.0M) | Region V | Masbate 3rd DEO | Completed | ₱9M | 100% | Medium risk46 | —-0.056 |
| 22 | 18FJ0063CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT GILOTONGAN ES (9.5M X 23.0M) | Region V | Masbate 3rd DEO | Completed | ₱9M | 100% | Medium risk46 | —-0.056 |
| 23 | 18FJ0093CONSTRUCTION OF THREE (3) UNITS ONE (1) STOREY TWO (2) CLASSROOM REGULAR WORKSHOP AT G. BALINGASAN NATIONAL HIGH SCHOOL, PLACER, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱10M | 100% | Medium risk46 | —-0.055 |
| 24 | 18FJ0091CONSTRUCTION OF THREE (3) UNITS ONE (1) STOREY TWO (2) CLASSROOM REGULAR WORKSHOP AT VIVENCIO P. CASAS MEMORIAL HIGH SCHOOL, PLACER, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱10M | 100% | Medium risk46 | —-0.055 |
| 25 | 18FJ0102CONSTRUCTION OF THREE (3) UNIT ONE (1) STOREY REGULAR WORKSHOP AT MATAGANGTANG HIGH SCHOOL, PLACER, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱10M | 100% | Medium risk46 | —-0.051 |