Opening the dossier…
Opening the dossier…
Contractor dossier
19 projects on file, including joint ventures this contractor is part of.
Total projects
19
Total budget
₱1.4B
Average progress
82.5%
Completion rate
63.2%
Below 70%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
1
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 9 | ₱353M | 46.8 | 0 | 100.0% |
| Region IV-B | 5 | ₱704.6M | 54.4 | 1 | 73.0% |
| Region IV-A | 3 | ₱144.7M | 64.5 | 0 | 36.2% |
| Region VII | 2 | ₱190.9M | 62.6 | 0 | 96.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 10 | ₱768.1M | 56.2 | 1 | 76.8% |
| Roads | 8 | ₱577.7M | 50.8 | 0 | 87.5% |
| Bridges | 1 | ₱47.4M | 43.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG YLANG-YLANG RIVER, BRGY. STA. ISABEL, KAWIT, CAVITE (P | Region IV-A | Cavite 1st DEO | On-Going | ₱48M | 0% | High risk72 | —-0.001 |
| 25DF0165CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG MALIMANGO RIVER, BRGY. BAGBAG I, ROSARIO, CAVITE (PHAS | Region IV-A | Cavite 1st DEO | On-Going | ₱48M | 31% | High risk72 | —-0.010 |
| 25E00205BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+240-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND | Region IV-B | Region IV-B | On-Going | ₱284.2M | 65% | High risk68 | Flagged0.001 |
| 23HO0154CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY BITOON, DUMANJUG, C | Region VII | Cebu 7th DEO | On-Going | ₱94.4M | 94% | High risk65 | —-0.014 |
| 25E00148COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, BRGY. AGMANIK, STA. FE, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.2M | 0% | High risk63 | —-0.011 |
| 23HO0139ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0169 + 482 - K0169 + 6 | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.083 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00205BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+240-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND | Region IV-B | Region IV-B | On-Going | ₱284.2M | 65% | High risk68 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DF0166CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG YLANG-YLANG RIVER, BRGY. STA. ISABEL, KAWIT, CAVITE (P | Region IV-A | Cavite 1st DEO | On-Going | ₱48M | 0% | High risk72 | —-0.001 |
| 2 | 25DF0165CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG MALIMANGO RIVER, BRGY. BAGBAG I, ROSARIO, CAVITE (PHAS | Region IV-A | Cavite 1st DEO | On-Going | ₱48M | 31% | High risk72 | —-0.010 |
| 3 | 25E00205BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+240-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND | Region IV-B | Region IV-B | On-Going | ₱284.2M | 65% | High risk68 | Flagged0.001 |
| 4 | 23HO0154CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY BITOON, DUMANJUG, C | Region VII | Cebu 7th DEO | On-Going | ₱94.4M | 94% | High risk65 | —-0.014 |
| 5 | 25E00148COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, BRGY. AGMANIK, STA. FE, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.2M | 0% | High risk63 | —-0.011 |
| 6 | 23HO0139ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0169 + 482 - K0169 + 6 | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.083 |
| 7 | 18EH0039PAVING OF UNPAVED ROAD OF LUBI - BINOOG ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱93.5M | 100% | Medium risk52 | —-0.081 |
| 8 | 24GL0128CONCRETING OF BRGY. CALAPI TO SITIO TALAPTAP FMR, BRGY. CALAPI, HINIGARAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱49.8M | 100% | Medium risk50 | —-0.034 |
| 9 | 24GN0067CONSTRUCTION OF ROAD, BRGY. CULO, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱49M | 100% | Medium risk49 | —-0.061 |
| 10 | 25DB0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL ALONG SANTIAGO RIVER, BARANGAY LUCSUHIN, CALATAGAN,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱48.8M | 77% | Medium risk49 | —-0.043 |
| 11 | 24GN0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK (PHASE 4), BARANGAY PATIC, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱48.5M | 100% | Medium risk48 | —-0.068 |
| 12 | 24GN0070CONSTRUCTION OF SHORELINE PROTECTION ALONG PATIC CREEK, BRGY. UTOD, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.066 |
| 13 | 24GN0069CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT, BRGY. UTOD, PULUPANDAN, NEGROS OCCIDENTAL (PHASE I) | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.066 |
| 14 | 24GN0071CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK (PHASE 3), BARANGAY PATIC, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.068 |
| 15 | 19E00061CONST./REPAIR/REHAB. OF FLOOD/RIVER CONTROL & DRAINAGE PROJECTS, PARPAGOHA REVETMENT, STA. 0+000.00 - STA. 0+297.00, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱49.2M | 100% | Medium risk45 | —-0.017 |
| 16 | 24GN0068CONSTRUCTION OF ROAD WITH SLOPE PROTECTION STRUCTURE, BRGY. CULO - BRGY. TAPONG, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.092 |
| 17 | 23HL0063ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS: BAYAWAN-KABANKALAN ROAD - K0112 + 000 - K0112 + 500, BAYAWAN CITY, | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱19.3M | 100% | Medium risk44 | —-0.090 |
| 18 | 24GL0131CONCRETING OF BRGY. SAN AGUSTIN FMR PHASE II, BRGY. SAN AGUSTIN, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱14.9M | 100% | Medium risk44 | —-0.041 |
| 19 | 20EH0066CONSTRUCTION OF NEW BRIDGES - DAVID BRIDGE ALONG ODIONGAN - EAST - WEST ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱47.4M | 100% | Medium risk44 | —-0.045 |