Contractor dossier
143 projects on file, including joint ventures this contractor is part of.
Total projects
143
Total budget
₱9.7B
Average progress
94.1%
Completion rate
81.1%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
11
7.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 100 | ₱6.3B | 42.6 | 1 | 98.5% |
| Region II | 16 | ₱1.6B | 57.9 | 5 | 67.6% |
| Region XI | 12 | ₱877.8M | 63.3 | 4 | 88.0% |
| Region I | 6 | ₱330.5M | 58.3 | 0 | 100.0% |
| Cordillera Administrative Region | 5 | ₱180.4M | 60.0 | 1 | 93.7% |
| Central Office | 2 | ₱286.1M | 75.3 | 0 | 100.0% |
| Region IV-A | 1 | ₱95.8M | 65.4 | 0 | 100.0% |
| National Capital Region | 1 | ₱57.9M | 55.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 54 | ₱3.2B | 45.7 | 1 | 95.2% |
| Flood Control and Drainage | 38 | ₱2.6B | 42.8 | 0 | 99.7% |
| Bridges | 31 | ₱2.5B | 47.7 | 3 | 89.5% |
| Buildings and Facilities | 7 | ₱196.1M | 42.9 | 0 | 100.0% |
| OTHER | 5 | ₱459.8M | 84.1 | 3 | 75.6% |
| Bridges, Roads | 4 | ₱338M | 50.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱376.5M | 92.7 | 3 | 58.5% |
| GAA 2025 SSP | 1 | ₱99M | 95.4 | 1 | 99.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0137CONSTRUCTION OF TARLAC CITY SOUTHWEST DIVERSION ROAD INCLUDING BRIDGE COMPONENT (PACKAGE Q), TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 99% | High risk95 | Flagged0.008 |
| 25PB0009ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, CAGAYAN-APAYAO RD (ILI-GUINAMGAMMAN-RIZAL SECT) - K0553 + (-303) - K0555 + 100 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱118.3M | 69% | High risk94 | Flagged0.014 |
| 25BC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - ULIMA BR. 2 ALONG JCT.-LOGAC-LASAM-GAGABUTAN RD | Region II | Cagayan 2nd DEO | On-Going | ₱143.3M | 65% | High risk93 | Flagged0.021 |
| 25B00053OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - NAMUAC BR. (B04427LZ) ALONG MANILA NORTH RD | Region II | Region II | On-Going | ₱114.9M | 41% | High risk92 | Flagged0.025 |
| 24LA0148CONSTRUCTION OF ROAD, BINABA - SAROG - MAMACAO - SABONG - LINIPUTAN - KITANG DAGAT - LINIPUTAN, LANTAWAN, BARANGAY NAPNAPAN, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.5M | 45% | High risk90 | Flagged0.085 |
| 24LA0131CONCRETING OF ROAD FROM NUEVO ILOCO-MAHAYAG, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱88.6M | 85% | High risk89 | Flagged0.070 |
| 24LA0150CONSTRUCTION OF ROAD, PUROK CAIMITO - SAN MIGUEL - MAPLAG - BARUNGKAG - BUKO-BUKO SA ANAY, PANTUKAN, DAVAO DE ORO (PHASE 1) | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 48% | High risk88 | Flagged0.075 |
| 17LA0016WIDENING OF LIBOTON BRIDGE B01687MN INCLUDING APPROACHES AND RROW, MONKAYO ALONG DAANG MAHARLIKA MN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱83.1M | 100% | High risk77 | —-0.013 |
| 19C00016NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD (PHASE I), PROVINCE OF TARLAC | Region III | Region III | Completed | ₱144.8M | 100% | High risk76 | —-0.009 |
| 19C00032CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-FLOOD CONTROL WORKS-DIKING/SLOPE PROTECTION/STRENGTHENING OF GUMAIN-PORAC RIVER AT LUBAO AND FLORIDABLANCA, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱142.7M | 100% | High risk75 | —-0.054 |
| 18C00048REHABILITATION OF CABIAO-SAN ISIDRO RING LEVEE, CABIAO AND SAN ISIDRO, NUEVA ECIJA | Central Office | Flood Control Management Cluster | Completed | ₱143.4M | 100% | High risk75 | —-0.056 |
| 17C00103CONSTRUCTION OF MISSING GAPS CONNECTING NR, INCLUDING ROW, CAPAS-BOTOLAN ROAD (ZAMBALES SECTION), INCLUDING ROW, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | Completed | ₱188M | 100% | High risk74 | —-0.017 |
| 24C00654CONVERGENCE & SPL. SUPPORT PROGRAM-SPL. ROAD FUND MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239 1. INSTALLATION OF ROAD SAFETY DEVICES & FACILITIES ALONG MNR (SO1366LZ) & 2. INSTALLATION OF ROAD SAFETY DEVICES & FACILITIES ALONG MNR (SO1366LZ) BRGY. | Region III | Region III | On-Going | ₱48M | 0% | High risk73 | —-0.014 |
| 17CM0001OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG SUBIC-PHILSECO ROAD, SUBIC, ZAMBALES. | Region III | Zambales 2nd DEO | Completed | ₱48.9M | 100% | High risk72 | —-0.061 |
| 24CN0016NETWORK DEVELOPMENT PROGRAM - OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, A. CASTAÑEDA -- MA AURORA - SN LUIS RD, K0196 + 124 - K0196 + 805, K0196 + 877 - K0196 + 886, K0206 + 500 - K0206 + 661.70, K0207 + 265 - K0207 + 352, K0210 + 254.30 ........... | Region III | Aurora DEO | Completed | ₱52M | 100% | High risk70 | —-0.063 |
| 23CN0009ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BALER-CASIGURAN RD (BALER-DINADIAWAN) - K0231+128 - K0231+701, K0288+(-106) - K0289+000 | Region III | Aurora DEO | Completed | ₱50.1M | 100% | High risk69 | —-0.066 |
| 24CN0015NETWORK DEVELOPMENT PROGRAM - OFF CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, NUEVA ECIJA - AURORA RD, K0205 + 997 - K0208 + 000, K0212 + 000 - K0214 + 909, K0214 + 940 - K0217 + 000 | Region III | Aurora DEO | Completed | ₱49.5M | 100% | High risk69 | —-0.064 |
| 17CM0005REHAB. OF SAN MARCELINO-SAN ANTONIO-SAN NARCISO RD. K0153+701-K0156+505, SAN MARCELINO, ZAM. | Region III | Zambales 2nd DEO | Completed | ₱39.2M | 100% | High risk69 | —-0.060 |
| 16CK0131NETWORK DEVT. IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG BAMBAN-POBLACION ROAD | Region III | Tarlac 2nd DEO | Completed | ₱20.6M | 100% | High risk69 | —-0.067 |
| 17AD0005CONSTRUCTION OF CANDON CITY SPORTS CENTER, BY-PASS ROAD, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱78.4M | 100% | High risk68 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LA0148CONSTRUCTION OF ROAD, BINABA - SAROG - MAMACAO - SABONG - LINIPUTAN - KITANG DAGAT - LINIPUTAN, LANTAWAN, BARANGAY NAPNAPAN, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.5M | 45% | High risk90 | Flagged0.085 |
| 24LA0150CONSTRUCTION OF ROAD, PUROK CAIMITO - SAN MIGUEL - MAPLAG - BARUNGKAG - BUKO-BUKO SA ANAY, PANTUKAN, DAVAO DE ORO (PHASE 1) | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 48% | High risk88 | Flagged0.075 |
| 24LA0131CONCRETING OF ROAD FROM NUEVO ILOCO-MAHAYAG, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱88.6M | 85% | High risk89 | Flagged0.070 |
| 25B00049OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - LUCBAN BR. (B04771LZ) ALONG MANILA NORTH RD | Region II | Region II | On-Going | ₱160.7M | 1% | High risk65 | Flagged0.027 |
| 25B00053OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - NAMUAC BR. (B04427LZ) ALONG MANILA NORTH RD | Region II | Region II | On-Going | ₱114.9M | 41% | High risk92 | Flagged0.025 |
| 25BC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - ULIMA BR. 2 ALONG JCT.-LOGAC-LASAM-GAGABUTAN RD | Region II | Cagayan 2nd DEO | On-Going | ₱143.3M | 65% | High risk93 | Flagged0.021 |
| 24LA0132CONCRETING OF ROAD AT BRGY. PANIBASAN - BRGY. GUBATAN - BRGY. ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱55.8M | 95% | Medium risk54 | Flagged0.019 |
| 25PB0009ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, CAGAYAN-APAYAO RD (ILI-GUINAMGAMMAN-RIZAL SECT) - K0553 + (-303) - K0555 + 100 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱118.3M | 69% | High risk94 | Flagged0.014 |
| 24B00105OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BANGAN BR. 1 (B01012LZ) ALONG MANILA NORTH RD | Region II | Region II | On-Going | ₱14.4M | 0% | Medium risk48 | Flagged0.013 |
| 25B00041OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALCALA-SANTO NIÑO-LASAM ROAD -PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱70.2M | 0% | Medium risk55 | Flagged0.011 |
| 25CJ0137CONSTRUCTION OF TARLAC CITY SOUTHWEST DIVERSION ROAD INCLUDING BRIDGE COMPONENT (PACKAGE Q), TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 99% | High risk95 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20CJ0049ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD - K0147 + 000 - K0147 + 527 | Region III | Tarlac DEO | Completed | ₱14.4M | 100% | Medium risk31 | —-0.102 |
| 127 | 18CJ0029CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, MONCADA SECTION, MONCADA, TARLAC | Region III | Tarlac DEO | Completed | ₱23.3M | 100% | Medium risk31 | —-0.087 |
| 128 | 20CF0044RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES CABABAO BR. (B01376LZ) ALONG DAANG MAHARLIKA (LZ) | Region III | Nueva Ecija 2nd DEO | Completed | ₱6.8M | 100% | Medium risk31 | —-0.065 |
| 129 | 19CA0063FLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PENTOR-BALSIK RIVER (TUCOP SECTION), STA. (-) 005+300 TO STA. (-) 005+692 | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | Medium risk30 | —-0.088 |
| 130 | 18CJ0067FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG SAN BARTOLOME RIVER, NAMBALAN SECTION, MAYANTOC, TARLAC | Region III | Tarlac DEO | Completed | ₱32.9M | 100% | Low risk30 | —-0.087 |
| 131 | 22CK0083REHABILITATION OF EXISTING DIKE ALONG BINABAKOD RIVER, PALUDPUD SECTION, D/S OF CHECK GATE, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱34.6M | 100% | Low risk29 | —-0.090 |
| 132 | 18CK0048REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (SAN ROQUE SECTION, RIGHT BANK), DOWNSTREAM OF RIO CHICO BRIDGE, LAPAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱37.2M | 100% | Low risk29 | —-0.092 |
| 133 | 18CJ0060FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/DESILTING OF UNGOT CREEK, TARLAC CITY (PHASE I) | Region III | Tarlac DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.089 |
| 134 | 18CK0086REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER, RIGHT BANK, BARANGAY ALFONSO SECTION, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.090 |
| 135 | 18CJ0061FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/DESILTING OF UNGOT CREEK, TARLAC CITY (PHASE II) | Region III | Tarlac DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.090 |
| 136 | 18CK0157REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG O'DONNELL RIVER (MARUGLO SECTION, RIGHT BANK), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱46.1M | 100% | Low risk29 | —-0.091 |
| 137 | 18CK0085REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER, RIGHT BANK, BARANGAY SAN NICOLAS SECTION, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.091 |
| 138 | 18CK0016REHAB/IMPT OF EXISTING DIKE ALONG PARUA RIVER (RIGHT BANK), U/S OF STA. RITA BRIDGE, CONCEPCION, TAR | Region III | Tarlac 2nd DEO | Completed | ₱22.6M | 100% | Low risk29 | —-0.092 |
| 139 | 18CK0027REHAB/IMPT OF EXISTING DIKE ALONG LUCUNG RIVER (ALFONSO SECT., LEFT BANK), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱27.9M | 100% | Low risk29 | —-0.092 |
| 140 | 20CK0028REHABILITATION/IMPROVEMENT OF EXISTING EARTH DIKE ALONG LUCUNG RIVER (ALFONSO SECTION, RIGHT BANK), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱21.4M | 100% | Low risk29 | —-0.092 |
| 141 | 18CN0150CONCRETING OF BUTAS NA BATO - DUMP SITE ROAD, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱7M | 100% | Low risk26 | —-0.046 |
| 142 | 17LA0364CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING AT PANTUKAN NHS, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱31.6M | 100% | Low risk19 | —-0.009 |
| 143 | 22CN0039CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CABITUCULAN EAST, MARIA AURORA, AURORA | Region III | Aurora DEO | Completed | ₱2.9M | 100% | Low risk18 | —-0.101 |