Contractor dossier
9 projects on file, including joint ventures this contractor is part of.
Total projects
9
Total budget
₱230.6M
Average progress
91.5%
Completion rate
55.6%
Below 70%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 8 | ₱131.7M | 44.1 | 0 | 91.0% |
| Region XIII | 1 | ₱98.9M | 48.5 | 0 | 95.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Water Provision and Storage | 5 | ₱70.2M | 44.2 | 0 | 89.7% |
| Bridges | 2 | ₱56.7M | 46.0 | 0 | 89.8% |
| Flood Control and Drainage | 1 | ₱98.9M | 48.5 | 0 | 95.7% |
| Roads | 1 | ₱4.8M | 39.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25ND0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PROTECTING NRJ MALAYBALAY-BILAY ROAD CONNECTING EAST-WEST LATERAL ROAD, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | On-Going | ₱98.9M | 96% | Medium risk48 | —-0.027 |
| 2 | 24KK0020RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - CATUAN BR. (B01349MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD | Region X | Misamis Oriental 1st DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.060 |
| 3 | 25KC0092WIDENING OF PERMANENT BRIDGES - KALINGKING BR. (B01086MN) ALONG MISAMIS OR.- BUKIDNON-AGUSAN RD., MALITBOG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱27.3M | 80% | Medium risk46 | —-0.025 |
| 4 | 25KC0110CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM BARANGAY CROSSING, SANTA FE AND PALABUCAN, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱22.7M | 99% | Medium risk45 | —-0.031 |
| 5 | 23KC0067CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY POBLACION, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.059 |
| 6 | 25KC0127CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM BARANGAY SAN LUIS AND KALINGKING, MALITBOG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱22.9M | 50% | Medium risk44 | —-0.015 |
| 7 | 25KC0114CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM BARANGAY SAN LUIS, MALITBOG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.056 |
| 8 | 23KK0094CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BONIFACIO AQUINO, MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.056 |
| 9 | 23KC0144CONSTRUCTION OF BARANGAY ROAD IN BARANGAY SILOO, MALITBOG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱4.8M | 100% | Medium risk40 | —-0.040 |