Contractor dossier
212 projects on file, including joint ventures this contractor is part of.
Total projects
212
Total budget
₱3.9B
Average progress
98.3%
Completion rate
91.0%
Average risk score
41.4
Medium risk on average, out of 100
Flagged as unusual
7
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 203 | ₱3.2B | 40.9 | 7 | 98.3% |
| Region VI | 9 | ₱662.4M | 53.2 | 0 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 85 | ₱521.7M | 31.3 | 0 | 100.0% |
| Roads | 81 | ₱2.5B | 46.9 | 0 | 98.6% |
| Bridges | 19 | ₱150.3M | 38.1 | 1 | 100.0% |
| Flood Control and Drainage | 7 | ₱154.4M | 38.0 | 0 | 100.0% |
| Water Provision and Storage | 7 | ₱27.1M | 28.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 6 | ₱302.3M | 93.1 | 2 | 72.9% |
| OTHER | 5 | ₱113M | 80.5 | 3 | 85.4% |
| GAA 2025 SSP | 1 | ₱35.5M | 94.9 | 1 | 96.1% |
| Bridges, Roads | 1 | ₱96.6M | 62.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25G00051CANDONI- GATUSLAO- BASAY BDRY. ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱101M | 77% | High risk95 | Flagged0.006 |
| 25GM0005RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN- HINOBAAN SECTION) - K0149+363 - K0150+577, K0154+027 - K0155+757, CAUAYAN AND SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱73.8M | 91% | High risk95 | —-0.006 |
| 25GM0016RECONSTRUCTION TO CONCRETE PAVEMENT - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGE PAVED ROADS- PAVED ROADS- PRIMARY ROADS ALONG KABANKALAN - BAIS RD - K0093+215 - K0093+393, K0096+400 - K0096+647, K0104+1013 - K0105+954, KABANKALAN CITY, NEG. OCC. | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱35.5M | 96% | High risk95 | Flagged0.006 |
| 25HK0042ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DUMAGUETE NORTH ROAD(DUMAGUETE-JCT-BAIS-KABANKALAN)-K0002+863-K0003+480,NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱39.8M | 19% | High risk93 | Flagged0.015 |
| 25G00023HIMAMAYLAN CITY- NEGROS ORIENTAL BOUNDARY- TAYASAN ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱28.7M | 92% | High risk92 | —-0.010 |
| 25GM0006OFF-CARRIAGEWAY IMPROVEMENT:PAVING OF SHOULDERS - BACOLOD SOUTH RD - K0084+568 - K0085+441, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱36.7M | 76% | High risk92 | —-0.002 |
| 25GL0137ROAD WIDENING - BACOLOD SOUTH RD - K0051 + 763 - K0052 + 047, K0062 + 519 - K0062 + 577 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱22.2M | 82% | High risk91 | —-0.005 |
| 25HK0086CONSTRUCTION OF THREE(3) STOREY FIFTEEN (15) CLASSROOMS SCHOOL BUILDING AT BATINGUEL ELEMENTARY SCHOOL, DUMAGUETE CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱46.2M | 27% | High risk86 | Flagged0.059 |
| 25RB0004CONSTRUCTION OF SCHOOL BUILDING, PALOYPOY INTEGRATED FARM SCHOOL, BRGY. BUENAVISTA, HIMAMAYLAN CITY NEG. OCC | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱5M | 100% | High risk85 | Flagged0.030 |
| 25RB0005CONSTRUCTION OF SCHOOL BUILDING, ANAHAW ELEMENTARY SCHOOL, BRGY.ANAHAW, HINIGARAN CITY NEG. OCC | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱5M | 100% | High risk83 | Flagged0.006 |
| 20HK0044ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES- WIDENING OF PANAMBALON BR. (B00089NR) ALONG DUMAGUETE NORTH RD. (DGTE.-JCT. BAIS-KABANKALAN), BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.034 |
| 19GL0033RECONSTRUCTION TO CONCRETE PAVEMENT - BINALBAGAN -ISABELA RD -K0062+ (-411) - K0062+ (-339), K0062+ (-339) - K0062+730, K0063+116 - K0063+999, K0066+529- K0066+680 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱37.3M | 100% | High risk74 | —-0.035 |
| 17RD0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO KABANKALAN AIRPORT, KABANKALAN CITY, NEG. OCC. | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱43.7M | 100% | High risk65 | —-0.059 |
| 17RD0009REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE BASED ON P | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱18.1M | 100% | High risk65 | —-0.059 |
| 16HL0149NETWORK DEV.-IMPV'T./WIDENING OF NAT'L.RDS.-DUMAGUEET SOUTH ROAD,K0105+445-K0106+506/K0105+445-K0106 | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱28.1M | 100% | High risk65 | —-0.059 |
| 17HL0001NETWORK DEV'T.-OFF-CARRIAGEWAY IMPV'T. INCLUDING DRAINAGE: DGTE. SOUTH RD. K0102+130-K0106+506/K0103 | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱24.2M | 100% | High risk65 | —-0.059 |
| 17HK0166ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS-MABINAY-AYUNGON ROAD K0095+(-600)-K0095+(-400), K0097+700-K0098+257, K0097+500-K0097+800, MABINAY, | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱8.9M | 100% | High risk65 | —-0.060 |
| 17RC0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG HINIGARAN-ISABELA ROAD K0059+270 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱6M | 100% | High risk65 | —-0.060 |
| 17RD0008ROAD UPGRADING (UINPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱8.2M | 100% | High risk64 | —-0.059 |
| 23G00045HIMAMAYLAN CITY- NEGROS ORIENTAL BOUNDARY- TAYASAN ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱96.6M | 100% | High risk63 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HK0086CONSTRUCTION OF THREE(3) STOREY FIFTEEN (15) CLASSROOMS SCHOOL BUILDING AT BATINGUEL ELEMENTARY SCHOOL, DUMAGUETE CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱46.2M | 27% | High risk86 | Flagged0.059 |
| 25RB0004CONSTRUCTION OF SCHOOL BUILDING, PALOYPOY INTEGRATED FARM SCHOOL, BRGY. BUENAVISTA, HIMAMAYLAN CITY NEG. OCC | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱5M | 100% | High risk85 | Flagged0.030 |
| 25HK0042ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DUMAGUETE NORTH ROAD(DUMAGUETE-JCT-BAIS-KABANKALAN)-K0002+863-K0003+480,NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱39.8M | 19% | High risk93 | Flagged0.015 |
| 17RG0100CONSTRUCTION OF CONCRETE BRIDGE (ALONG MANGOTO RIVER) SITIO LING-AB, BRGY. SAN MIGUEL, TANJAY CITY | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱16M | 100% | Medium risk51 | Flagged0.013 |
| 25G00051CANDONI- GATUSLAO- BASAY BDRY. ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱101M | 77% | High risk95 | Flagged0.006 |
| 25GM0016RECONSTRUCTION TO CONCRETE PAVEMENT - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGE PAVED ROADS- PAVED ROADS- PRIMARY ROADS ALONG KABANKALAN - BAIS RD - K0093+215 - K0093+393, K0096+400 - K0096+647, K0104+1013 - K0105+954, KABANKALAN CITY, NEG. OCC. | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱35.5M | 96% | High risk95 | Flagged0.006 |
| 25RB0005CONSTRUCTION OF SCHOOL BUILDING, ANAHAW ELEMENTARY SCHOOL, BRGY.ANAHAW, HINIGARAN CITY NEG. OCC | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱5M | 100% | High risk83 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18GM0114CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT SIPALAY CITY NHS, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk36 | —-0.045 |
| 152 | 18GL0129COMPLETION OF CLINICAL AND ANCILLARY SERVICES OF VALERIANO GATUSLAO DISTRICT HOSPITAL, HIMAMAYLAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱6.8M | 100% | Medium risk36 | —-0.043 |
| 153 | 18GM0104CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT TUYOM NHS (GUILJUNGAN NHS-TUYOM EXT.) , CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk36 | —-0.045 |
| 154 | 18GM0140CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT GUILJUNGAN NHS - TALACDAN EXT., CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk35 | —-0.045 |
| 155 | 18GM0180CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT BANTAYAN NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.047 |
| 156 | 18GM0193CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT BINICUIL NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9M | 100% | Medium risk35 | —-0.047 |
| 157 | 18GM0106CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT BINICUIL NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.047 |
| 158 | 18GM0118CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT BINICUIL NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.2M | 100% | Medium risk35 | —-0.045 |
| 159 | 18GM0084CONCRETING OF BRGY. BULWANGAN FMR, BRGY. BULWANGAN, HINOBA-AN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.039 |
| 160 | 16GM0095CONSTRUCTION OF CLASSROOMS (1 UNIT 3 STY 12CL) AT BILBAO UYBICO NATIONAL HIGH SCHOOL, HINOBA-AN, NEG | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱17.7M | 100% | Medium risk34 | —-0.022 |
| 161 | 17RD0168CONSTRUCTION OF CLASSROOMS (1UNIT 2STY 4CL) AT ANDULAUAN NATIONAL HIGH SCHOOL, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk33 | —-0.025 |
| 162 | 16HL0131CONST. AND MAINT. OF BRIDGES ALONG NAT'L ROADS- REHAB.. . MALAPAGYAO BRIDGE(B00450NR) ALONG STA. CAT | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱4.6M | 100% | Low risk29 | —-0.033 |
| 163 | 16HL0137CONSTRUCTION OF HANGING BRIDGE, SITIO AVOCADO, TALALAK, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱2M | 100% | Low risk29 | —-0.034 |
| 164 | 16HK0116REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, BALAYONG BRIDGE (B00454NR) ALONG STA.CAT-PAMPLONA-TANJAY C | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱4.7M | 100% | Low risk28 | —-0.034 |
| 165 | 16HK0115REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, CANG-ABOC BRIDGE (B00050NR) ALONG BAIS-KABANKALAN ROAD | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱3.7M | 100% | Low risk28 | —-0.035 |
| 166 | 16HK0119REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, SIBULAN BRIDGE (B00073NR) ALONG DUMAGUETE NORTH ROAD (DUMA | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱3M | 100% | Low risk28 | —-0.034 |
| 167 | 16HL0135CONSTRUCTION OF FOOTBRIDGE, BRGY. SAN JOSE, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱1.9M | 100% | Low risk27 | —-0.034 |
| 168 | 20HK0082LOCAL INFRASTRUCTURE PROGRAM: IMPROVEMENT OF CANIBOL PORT, BRGY. OKIOT, BAIS, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.088 |
| 169 | 22HL0046ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - STA. CATALINA BRIDGE (B00034NR) ALONG DUMAGUETE SOUTH ROAD, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.059 |
| 170 | 22HL0045ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - TIABANAN BRIDGE (B00045NR) ALONG DUMAGUETE SOUTH ROAD, BASAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.058 |
| 171 | 22HL0026ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - MAGLINTE BR. (B00012NR) ALONG DUMAGUETE SOUTH ROAD, ZAMBOANGUITA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱2M | 100% | Low risk24 | —-0.059 |
| 172 | 19GM0095MULTI PURPOSE COVERED COURT FOR PUROK CORDOVA, BARANGAY BOCANA, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱4.7M | 100% | Low risk24 | —-0.086 |
| 173 | 24GL0127CONSTRUCTION/REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTORS IN PUBLIC FACILITIES | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱2.9M | 100% | Low risk24 | —-0.050 |
| 174 | 25GL0022CONSTRUCTION (COMPLETION) OF ROAD AT BARANGAY PATICUI, HINIGARAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱3M | 100% | Low risk24 | —-0.089 |
| 175 | 19GM0085CONCRETING OF ROAD, BRGY. CAMINDANGAN, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.8M | 100% | Low risk23 | —-0.087 |