71 projects on file, including joint ventures this contractor is part of.
Total projects
71
Total budget
₱1.2B
Average progress
98.4%
Completion rate
87.3%
Average risk score
31.1
Medium risk on average, out of 100
Flagged as unusual
3
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 71 | ₱1.2B | 31.1 | 3 | 98.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 31 | ₱140.2M | 24.8 | 0 | 99.6% |
| Buildings and Facilities | 16 | ₱109.9M | 26.0 | 1 | 98.9% |
| Roads | 12 | ₱213.5M | 35.9 | 0 | 99.2% |
| Flood Control and Drainage | 10 | ₱672.9M | 50.9 | 1 | 92.9% |
| Water Provision and Storage | 2 | ₱19.4M | 39.5 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23E00091CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱120.3M | 100% | High risk63 | —-0.039 |
| 23E00078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱120.6M | 77% | High risk62 | Flagged0.018 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EF0119CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. BONO-BONO, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.9M | 100% | Medium risk36 | Flagged0.024 |
| 23E00078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱120.6M | 77% | High risk62 | Flagged0.018 |
| 23EF0070CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. BATO-BATO, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.6M | 100% | Medium risk40 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23E00091CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱120.3M | 100% | High risk63 | —-0.039 |
| 2 | 23E00078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱120.6M | 77% | High risk62 | Flagged0.018 |
| 3 | 20E00027ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD K0122+815 - K0126+342; K0126+542 - K0127+893, NARRA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱141.3M | 100% | Medium risk60 | —-0.049 |
| 4 | 22E00132CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, PHASE I, PUERTO PRINCESA NORTH ROAD, BRGY. SAN MANUEL TO OUTFALL, STA. 0+000-STA. 0+556.40, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk60 | —-0.040 |
| 5 | 22EG0066CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, IRAAN WATERWAYS, PHASE 3, LEFT BANK: 0+000-0+380; UPPER LEFT BANK: 0+389-0+503; RIGHT BANK: 0+107-0+364, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.039 |
| 6 | 23E00071CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURES- RC DIKE WITH STEEL SEET PILES ALONG PANACAN RIVER (BOTH SIDES), NARRA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk59 | —-0.040 |
| 7 | 23E00072CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS- CONST. OF RIVERBANK PROTECTION SRUCTURES- RC DIKE WITH STEEL SHEET PILES ALONG SALOGON RIVER (BOTH SIDES), BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk59 | —-0.036 |
| 8 | 25EF0039ROAD WIDENING-SECONDARY ROADS PUERTO PRINCESA SOUTH RD, K0216+530-K0216+693, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱7.1M | 100% | Medium risk52 | —-0.008 |
| 9 | 17EF0034REHAB/MAJOR REPAIR OF GUMINOBAT BR. (B00033PW) ALONG PPSR | Region IV-B | Palawan 2nd DEO | Completed | ₱6.4M | 100% | Medium risk49 | —-0.010 |
| 10 | 25EF0010CONST. OF COLBY RIVER FLOOD CONTROL STRUCTURE, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱19.3M | 52% | Medium risk41 | —-0.004 |
| 11 | 18EG0048CONSTRUCTION OF FLOOD CONTROL AND MITIGATION STRUCTURE ALONG BRGY. STA. MONICA, K0005+814.80 - K0006+304.80, PUERTO PRINCESA SOUTH ROAD, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.054 |
| 12 | 24EF0058CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAMARINIANA, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱9.9M | 100% | Medium risk41 | —-0.060 |
| 13 | 24EG0047CONSTRUCTION OF RIVER WATERWAY ENHANCEMENT STRUCTURE ALONG IRAWAN RIVER UPSTREAM (R/S), BARANGAY IRAWAN, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱17.4M | 100% | Medium risk40 | —-0.058 |
| 14 | 25EF0005REHAB/MAJOR REPAIR OF PERMANENT BRIDGES-MARANAN BR. (B00047PW) ALONG PPSR, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱10.8M | 87% | Medium risk40 | —-0.013 |
| 15 | 25EF0024CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUINLOGAN, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.9M | 91% | Medium risk40 | —-0.029 |
| 16 | 19EF0077WIDENING OF PERMANENT BRIDGES APO APORAWAN BR. (B00355PW) ALONG PUERTO PRINCESA SOUTH RD, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱23.3M | 100% | Medium risk40 | —-0.041 |
| 17 | 19EF0078RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES PINAGDUGUAN BR. 1 (B00357PW) ALONG PUERTO PRINCESA SOUTH RD, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱15.5M | 100% | Medium risk40 | —-0.037 |
| 18 | 18EF0064RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES IMULNOD BR. (B00075PW) ALONG QUEZON-ARAMAYWAN ROAD, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱11.3M | 100% | Medium risk40 | —-0.033 |
| 19 | 23EF0070CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. BATO-BATO, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.6M | 100% | Medium risk40 | Flagged0.008 |
| 20 | 18EF0063RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES GADSAN BR. (B00300PW) ALONG PALAWAN CIRCUMFERENTIAL ROAD, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.031 |
| 21 | 23EF0078CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF QUEZON, PROVINCE OF PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk39 | —-0.019 |
| 22 | 18EF0065RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MALALONG BR. (B00065PW) ALONG PUERTO PRINCESA SOUTH ROAD, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱7.4M | 100% | Medium risk39 | —-0.034 |
| 23 | 25EF0040ROAD WIDENING-SECONDARY ROADS PUERTO PRINCESA SOUTH RD, K0189+983-K0189+1272, BRGY. PANGOBILIAN, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱6.3M | 90% | Medium risk39 | —-0.036 |
| 24 | 24EF0056CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BARONG-BARONG, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.9M | 92% | Medium risk39 | —-0.016 |
| 25 | 20EF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING LABOG HOTSPRING, BRGY. LABOG, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱14.5M | 100% | Medium risk39 | —-0.066 |