Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱8.5B
Average progress
90.8%
Completion rate
72.3%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
8
4.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 159 | ₱8.1B | 53.8 | 5 | 90.9% |
| Region I | 14 | ₱422M | 74.4 | 3 | 89.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 50 | ₱2.2B | 52.0 | 1 | 91.8% |
| Flood Control and Drainage | 41 | ₱2.1B | 59.2 | 1 | 95.7% |
| Buildings and Facilities | 37 | ₱1.7B | 48.7 | 2 | 82.5% |
| OTHER | 18 | ₱859.4M | 69.2 | 2 | 96.8% |
| Bridges | 17 | ₱838.2M | 51.3 | 0 | 93.9% |
| Bridges, Roads | 9 | ₱796.8M | 61.8 | 1 | 85.6% |
| GAA 2025 OO-1 | 1 | ₱26.9M | 93.4 | 1 | 23.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 25AA0092FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG DUDUKDUKEN SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0093FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG BUDBUDAK SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0281SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TADAO, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.051 |
| 25DG0040CONST. OF MULTI-PURPOSE BUILDING, CYCLING CENTER (PHASE 11), KAYBAGAL SOUTH, TAGAYTAY | Region IV-A | Cavite 2nd DEO | On-Going | ₱78.3M | 61% | High risk76 | —-0.023 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 17DQ0022MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG AMUNTAY RIVER, PHASE II, WEST SIDE, BRGY. SAN AGUSTIN II, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALO | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.060 |
| 17DQ0007MFO 2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA. 15+843 - 16+343, WEST SIDE, BRGY. SALITRAN III, DASMARINAS CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.059 |
| 25AA0135FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY TULNAGAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 85% | High risk71 | —-0.027 |
| 25AA0137FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY PRAGATA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 92% | High risk71 | —-0.029 |
| 25AA0480SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY NAGLICUAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 95% | High risk71 | —-0.030 |
| 25AA0479SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE, PHASE 2 | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.7M | 100% | High risk71 | —-0.037 |
| 25AA0136FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱37.6M | 100% | High risk71 | —-0.065 |
| 25AA0481SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, NAGSANGA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 95% | High risk71 | —-0.033 |
| 23DQ0067RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ELLO BR. (B02990LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD; ABUBUT BR. (B02904LZ) ALONG CAVITE-BATANGAS RD AND PAURUNGAN BR. (B02988LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD | Region IV-A | Cavite 3rd DEO | Completed | ₱82M | 100% | High risk71 | —-0.036 |
| 24AA0196SIPAG - FLOOD MITIGATION STRUCTURES PROTECTINGMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF SEAWALL, BARANGAY CARUAN, PASUQUIN,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.060 |
| 24AA0195SIPAG - FLOODMITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLICBUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAYDAVILA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49M | 95% | High risk70 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 19DF0132CONSTRUCTION OF 2 UNITS 4STY 20CL SCHOOL BUILDING AT LUIS Y. FERRER SHS - STA. CLARA ANNEX, CITY OF GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱118.6M | 100% | High risk61 | Flagged0.032 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 18DF0140CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT JULIANO C. BROSAS ES, GEN.TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.013 |
| 21D00020FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES -NASUGBU ROAD (EAST-WEST ROAD), INDANG SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱120.6M | 60% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22DG0026CONST OF CONC BRIDGE-TAGAYTAY BYPASS ROAD (SICAT SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱67.5M | 100% | Medium risk54 | —-0.057 |
| 77 | 23DG0054CONST OF MPB-CONST OF MPB (HOSPITAL BLDG) MUNICIPALITY OF ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱49M | 92% | Medium risk54 | —-0.046 |
| 78 | 23DG0020CONST OF MPB (MUN HALL)(PHASE 2), BRGY MANGAS 2, ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱49M | 100% | Medium risk54 | —-0.092 |
| 79 | 24DQ0049REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JUANITO R. REMULLA, SR. RD - K0037 + 970 - K0038 + 721, K0039 + 016 - K0039 + 484 | Region IV-A | Cavite 3rd DEO | Completed | ₱56.6M | 100% | Medium risk54 | —-0.102 |
| 80 | 20DG0010CONST. OF MULTI-PURPOSE BUILDING MARINE BASE, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱47.7M | 100% | Medium risk54 | —-0.090 |
| 81 | 22DG0025CONSTRUCTION OF CONCRETE BRIDGE - TAGAYTAY BYPASS ROAD (GUINHAWA SECTION 2), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.043 |
| 82 | 21DG0012CONST OF CONCRETE ROAD-TAG BYPASS ROAD CAVITE (SALABAN SECTION II), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱81.9M | 100% | Medium risk54 | —-0.088 |
| 83 | 18DG0058LIP-NAT'L ROADS-ROAD OPENING/CONST OF TAGAYTAY BYPASS ROAD, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱67.7M | 100% | Medium risk54 | —-0.099 |
| 84 | 24DF0238ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSCARSADANG BAGO - MALAGASANG DIVERSION ROAD, CARSADANG BAGO SECTION, SEGMENT 5, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.9M | 30% | Medium risk54 | —-0.042 |
| 85 | 21DG0008CONST OF CONC ROAD-TAGAYTAY BY PASS ROAD (LUKSUHIN SECTION), ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱56.1M | 100% | Medium risk54 | —-0.089 |
| 86 | 21DG0009CONST OF CONCRETE ROAD-TAGAYTAY BYPASS ROAD (SICAT SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱66.6M | 100% | Medium risk54 | —-0.099 |
| 87 | 21DG0010CONST OF CONCRETE ROAD -TAGAYTAY BY PASS ROAD (ZAMBAL SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱56M | 100% | Medium risk53 | —-0.101 |
| 88 | 20DQ0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG AMUNTAY RIVER, WEST SIDE, BRGY. | Region IV-A | Cavite 3rd DEO | Completed | ₱86.8M | 100% | Medium risk53 | —-0.078 |
| 89 | 25DG0049CONST. OF MULTIPURPOSE BUILDING KAYBAGAL SOUTH, TAGAYTAY | Region IV-A | Cavite 2nd DEO | On-Going | ₱43M | 0% | Medium risk53 | —-0.030 |
| 90 | 22DG0071CONST OF MPB-CONST OF MPB (TAGAYTAY COMBAT SPORTS CENTER), BRGY KAYBAGAL SOUTH, TAGAYTAY CITY,CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱44.9M | 100% | Medium risk53 | —-0.099 |
| 91 | 20DF0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱68.7M | 100% | Medium risk53 | —-0.084 |
| 92 | 18DG0057CONST OF BY-PASS, TAGAYTAY BY PASS ROAD INCL. ROW AND BRIDGE, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱48.7M | 100% | Medium risk52 | —-0.081 |
| 93 | 20DG0046CONST OF PNP MPB(MAIN STATION)BRGY MENDEZ CROSSING EAST (SPUR ROAD) BRGY MENDEZ CROSSING EAST,TAG | Region IV-A | Cavite 2nd DEO | Completed | ₱39.2M | 100% | Medium risk52 | —-0.100 |
| 94 | 24DQ0048REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CAVITE-BATANGAS RD - K0036 + 900 - K0037 + 144, K0038 + 088 - K0038 + 985 | Region IV-A | Cavite 3rd DEO | Completed | ₱53.4M | 100% | Medium risk52 | —-0.105 |
| 95 | 23DG0051CONST OF MPB,TOWN PLAZA, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱41.6M | 100% | Medium risk51 | —-0.093 |
| 96 | 22DG0075CONST OF OTHER FACILITIES-CONST OF HEALTH FACILITY, BRGY POB 1-A,TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱34.3M | 72% | Medium risk51 | —-0.031 |
| 97 | 25DQ0020REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BACOOR-DASMARIÑAS NATIONAL RD - K0031 + 240 - K0031 + 533, K0032 + 300 - K0032 + 795 | Region IV-A | Cavite 3rd DEO | On-Going | ₱47.2M | 29% | Medium risk51 | —-0.053 |
| 98 | 19DG0009CONST OF DRAINAGE STRUCTURE ALONG ROAD-MAGALLANES DRIVE DIVERSION ROAD, TAGAYTAY CITY, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱48.4M | 100% | Medium risk51 | —-0.106 |
| 99 | 22DQ0039BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF JOSE ABAD SANTOS AVENUE AT BARANGAY SALITRAN III, CITY OF DASMARIÑAS, CAVITE; REHABILITA | Region IV-A | Cavite 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.099 |
| 100 | 18DG0056CONST OF NEW SALUYSOY BRIDGE, SAPA, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱46.8M | 100% | Medium risk51 | —-0.060 |