Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱8.5B
Average progress
90.8%
Completion rate
72.3%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
8
4.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 159 | ₱8.1B | 53.8 | 5 | 90.9% |
| Region I | 14 | ₱422M | 74.4 | 3 | 89.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 50 | ₱2.2B | 52.0 | 1 | 91.8% |
| Flood Control and Drainage | 41 | ₱2.1B | 59.2 | 1 | 95.7% |
| Buildings and Facilities | 37 | ₱1.7B | 48.7 | 2 | 82.5% |
| OTHER | 18 | ₱859.4M | 69.2 | 2 | 96.8% |
| Bridges | 17 | ₱838.2M | 51.3 | 0 | 93.9% |
| Bridges, Roads | 9 | ₱796.8M | 61.8 | 1 | 85.6% |
| GAA 2025 OO-1 | 1 | ₱26.9M | 93.4 | 1 | 23.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 25AA0092FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG DUDUKDUKEN SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0093FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG BUDBUDAK SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0281SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TADAO, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.051 |
| 25DG0040CONST. OF MULTI-PURPOSE BUILDING, CYCLING CENTER (PHASE 11), KAYBAGAL SOUTH, TAGAYTAY | Region IV-A | Cavite 2nd DEO | On-Going | ₱78.3M | 61% | High risk76 | —-0.023 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 17DQ0022MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG AMUNTAY RIVER, PHASE II, WEST SIDE, BRGY. SAN AGUSTIN II, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALO | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.060 |
| 17DQ0007MFO 2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA. 15+843 - 16+343, WEST SIDE, BRGY. SALITRAN III, DASMARINAS CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.059 |
| 25AA0135FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY TULNAGAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 85% | High risk71 | —-0.027 |
| 25AA0137FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY PRAGATA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 92% | High risk71 | —-0.029 |
| 25AA0480SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY NAGLICUAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 95% | High risk71 | —-0.030 |
| 25AA0479SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE, PHASE 2 | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.7M | 100% | High risk71 | —-0.037 |
| 25AA0136FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱37.6M | 100% | High risk71 | —-0.065 |
| 25AA0481SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, NAGSANGA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 95% | High risk71 | —-0.033 |
| 23DQ0067RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ELLO BR. (B02990LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD; ABUBUT BR. (B02904LZ) ALONG CAVITE-BATANGAS RD AND PAURUNGAN BR. (B02988LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD | Region IV-A | Cavite 3rd DEO | Completed | ₱82M | 100% | High risk71 | —-0.036 |
| 24AA0196SIPAG - FLOOD MITIGATION STRUCTURES PROTECTINGMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF SEAWALL, BARANGAY CARUAN, PASUQUIN,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.060 |
| 24AA0195SIPAG - FLOODMITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLICBUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAYDAVILA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49M | 95% | High risk70 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 19DF0132CONSTRUCTION OF 2 UNITS 4STY 20CL SCHOOL BUILDING AT LUIS Y. FERRER SHS - STA. CLARA ANNEX, CITY OF GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱118.6M | 100% | High risk61 | Flagged0.032 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 18DF0140CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT JULIANO C. BROSAS ES, GEN.TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.013 |
| 21D00020FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES -NASUGBU ROAD (EAST-WEST ROAD), INDANG SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱120.6M | 60% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20DG0009CONSTRUCTION OF CONCRETE ROAD-TAGAYTAY BYPASS ROAD, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.093 |
| 102 | 23DG0026CONST OF MPB-CONST OF MPB (GSO/NUTRITION OFFICE) BRGY KAYBAGAL SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱19.8M | 100% | Medium risk51 | —-0.102 |
| 103 | 22DF0197CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF DAANG HARI TO PAT | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 104 | 23DG0030CONST OF PUBLIC HEALTH FACILITY(TAG CITY HEALTH CENTER) BRGY KAYBAGAL SOUTH,TAGAYTAY CITY, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱19.6M | 100% | Medium risk51 | —-0.090 |
| 105 | 22DG0044CONST. OF CONCRETE ROAD - CONST. OF ROAD, BRGY. SAMBONG, TAGAYTAY CITY,CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.100 |
| 106 | 25DG0037CONST. (COMPLETION) OF BFP MAIN STATION, BRGY. PATUTONG MALAKI SOUTH, TAGAYTAY CITY, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱19.4M | 77% | Medium risk50 | —-0.058 |
| 107 | 22DG0056CONST OF MPB (BFP MAIN STATION) BRGY PATUTO SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱24.7M | 100% | Medium risk50 | —-0.101 |
| 108 | 22DG0060CONST OF CONCRETE ROAD-CONC OF THE EXISTING ROAD, MARINE BASE, GREGORIO LIM, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.101 |
| 109 | 22DG0074CONST. OF MULTI PURPOSE BUILDING - CONST. OF MULTI-PURPOSE FACILITY, GEN. E. AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱24.8M | 100% | Medium risk50 | —-0.091 |
| 110 | 20DQ0125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER, WEST SIDE, PHASE IV, B | Region IV-A | Cavite 3rd DEO | Completed | ₱48.2M | 100% | Medium risk50 | —-0.082 |
| 111 | 19DQ0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER, PHASE III, WEST SIDE, | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.082 |
| 112 | 18DQ0021ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER PHASE LL, EAST SIDE, BRGY | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.086 |
| 113 | 19DQ0019ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG AMUNTAY RIVER, PHASE III, EAST SIDE, | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.083 |
| 114 | 20DF0018ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF REVETMENT ALONG IMUS RIVE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 115 | 20DF0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF REVETMENT ALONG IMUS RIVE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 116 | 18DQ0106CONSTRUCTION OF FOUR(4) STOREY TWELVE (12) CLASSROOMS SCHOOL BUILDING AT NEW ERA NATIONAL HIGH SCHOOL, DASMARINAS CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱40.2M | 100% | Medium risk49 | —-0.049 |
| 117 | 18DQ0105CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT NEW ERA NATIONAL HIGH SCHOOL, DASMARINAS CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱40.1M | 100% | Medium risk49 | —-0.049 |
| 118 | 18DG0048LIP- NATIONAL ROADS - MAGALLANES DRIVE DIVERSION ROAD CONN. TAG. -BATS ART. HWAY AND TAG-MANILA VIA | Region IV-A | Cavite 2nd DEO | Completed | ₱46.7M | 100% | Medium risk49 | —-0.101 |
| 119 | 23DQ0137CONSTRUCTION OF BRIDGE LEADING TO THE CONTROLLED SANITARY LANDFILL OF THE CITY OF DASMARIÑAS, BARANGAY PALIPARAN II, CITY OF DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱44.5M | 100% | Medium risk48 | —-0.030 |
| 120 | 21DQ0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMS-BRIDGES-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LANGKAAN BR. 3 (B03057LZ) ALONG JUANITO R. REMULLA, SR. RD AND AGUINALDO BR. (B02908LZ) ALONG JUANITO R. REMULLA, SR. RD | Region IV-A | Cavite 3rd DEO | Completed | ₱45M | 100% | Medium risk48 | —-0.064 |
| 121 | 20DQ0057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGES - WIDENING OF PERMANENT BRIDGES - BUCAL BR. (B03054LZ) ALONG JUANITO R. REMULLA, SR. RD | Region IV-A | Cavite 3rd DEO | Completed | ₱39.4M | 100% | Medium risk48 | —-0.064 |
| 122 | 20DQ0058ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGES - WIDENING OF PERMANENT BRIDGES - LANGKAAN BR. 2 (B03056LZ) ALONG JUANITO R. REMULLA, SR. RD | Region IV-A | Cavite 3rd DEO | Completed | ₱43.9M | 100% | Medium risk48 | —-0.056 |
| 123 | 24DG0100NETWORK DEV'T-CONST OF BY-PASS & DIVERSION ROADS-TAGAYTAY-BY-PASS ROAD(SALABAN SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.9M | 97% | Medium risk48 | —-0.031 |
| 124 | 24DG0101NETWORK DEV'T-CONST OF BY-PASS & DIVERSION ROADS-TAGAYTAY BYPASS ROAD (BALAGBAG SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.9M | 100% | Medium risk48 | —-0.033 |
| 125 | 21DG0007CONST. OF CONCRETE BRIDGE - TAGAYTAY BYPASS ROAD (BALAGBAG SECTION), CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.065 |