Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱8.5B
Average progress
90.8%
Completion rate
72.3%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
8
4.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 159 | ₱8.1B | 53.8 | 5 | 90.9% |
| Region I | 14 | ₱422M | 74.4 | 3 | 89.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 50 | ₱2.2B | 52.0 | 1 | 91.8% |
| Flood Control and Drainage | 41 | ₱2.1B | 59.2 | 1 | 95.7% |
| Buildings and Facilities | 37 | ₱1.7B | 48.7 | 2 | 82.5% |
| OTHER | 18 | ₱859.4M | 69.2 | 2 | 96.8% |
| Bridges | 17 | ₱838.2M | 51.3 | 0 | 93.9% |
| Bridges, Roads | 9 | ₱796.8M | 61.8 | 1 | 85.6% |
| GAA 2025 OO-1 | 1 | ₱26.9M | 93.4 | 1 | 23.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 25AA0092FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG DUDUKDUKEN SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0093FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER WALL ALONG BUDBUDAK SECTION, BARANGAY CARUAN (TULNAGAN), PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.037 |
| 25AA0281SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TADAO, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.051 |
| 25DG0040CONST. OF MULTI-PURPOSE BUILDING, CYCLING CENTER (PHASE 11), KAYBAGAL SOUTH, TAGAYTAY | Region IV-A | Cavite 2nd DEO | On-Going | ₱78.3M | 61% | High risk76 | —-0.023 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 17DQ0022MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG AMUNTAY RIVER, PHASE II, WEST SIDE, BRGY. SAN AGUSTIN II, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALO | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.060 |
| 17DQ0007MFO 2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA. 15+843 - 16+343, WEST SIDE, BRGY. SALITRAN III, DASMARINAS CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.059 |
| 25AA0135FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY TULNAGAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.5M | 85% | High risk71 | —-0.027 |
| 25AA0137FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY PRAGATA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 92% | High risk71 | —-0.029 |
| 25AA0480SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY NAGLICUAN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 95% | High risk71 | —-0.030 |
| 25AA0479SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE, PHASE 2 | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.7M | 100% | High risk71 | —-0.037 |
| 25AA0136FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱37.6M | 100% | High risk71 | —-0.065 |
| 25AA0481SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, NAGSANGA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 95% | High risk71 | —-0.033 |
| 23DQ0067RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ELLO BR. (B02990LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD; ABUBUT BR. (B02904LZ) ALONG CAVITE-BATANGAS RD AND PAURUNGAN BR. (B02988LZ) ALONG BACOOR-DASMARIÑAS NATIONAL RD | Region IV-A | Cavite 3rd DEO | Completed | ₱82M | 100% | High risk71 | —-0.036 |
| 24AA0196SIPAG - FLOOD MITIGATION STRUCTURES PROTECTINGMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF SEAWALL, BARANGAY CARUAN, PASUQUIN,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.060 |
| 24AA0195SIPAG - FLOODMITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLICBUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, BARANGAYDAVILA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49M | 95% | High risk70 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Region IV-A | Cavite 2nd DEO | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
| 21D00028ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO-MAGALLANES -NASUGBU ROAD (EAST - WEST ROAD), PACKAGE 3, MAGALLANES-GEN. AGUINALDO SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱127M | 63% | High risk73 | Flagged0.039 |
| 19DF0132CONSTRUCTION OF 2 UNITS 4STY 20CL SCHOOL BUILDING AT LUIS Y. FERRER SHS - STA. CLARA ANNEX, CITY OF GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱118.6M | 100% | High risk61 | Flagged0.032 |
| 23AA0480CONSTRUCTION OF FLOOD MITIGATING STRUCTURES, US TULNAGAN BRIDGE, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.9M | 100% | High risk76 | Flagged0.027 |
| 25A00208ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0510 + 180 - K0510 + 194, K0514 + 911 - K0515 + 109, K0516 + 808 - K0516 + 839, K0516 + 901 - K0516 + 968, K0518 + 017 - K0518 + 042, K0519 + 279 - K0519 + 360, K0520 + 546 - K0520 + 579, K0520 + 615.60 - | Region I | Region I | On-Going | ₱26.9M | 23% | High risk93 | Flagged0.024 |
| 24AA0471CONCRETING OF PANGIL - DARUPIDIP FMR, BRGY.PANGIL AND BRGY. DARUPIDIP, PASUQUIN, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 69% | High risk73 | Flagged0.019 |
| 18DF0140CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT JULIANO C. BROSAS ES, GEN.TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.013 |
| 21D00020FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES -NASUGBU ROAD (EAST-WEST ROAD), INDANG SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱120.6M | 60% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 22DF0051ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF ROAD DIKE ALONG TIMALAN RIVER, BRGY. CABUCO PHASE IV, TREC | Region IV-A | Cavite 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.085 |
| 152 | 18DG0020ASSET PRESERVATION-REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS-MAR-MAG-AMUYONG ROAD, ALFONSO, CAV | Region IV-A | Cavite 2nd DEO | Completed | ₱27M | 100% | Medium risk46 | —-0.103 |
| 153 | 22DG0032CONST OF FLOOD CONTROL STRUCTURES ALONG ALEMANG RIVER (NAIC DIVERSION BRIDGE) NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱32.1M | 100% | Medium risk46 | —-0.087 |
| 154 | 22DQ0061ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CAVITE-BATANGAS RD - K0037 + 033.00 - K0037 + 745 | Region IV-A | Cavite 3rd DEO | Completed | ₱11.4M | 100% | Medium risk46 | —-0.100 |
| 155 | 18DF0140CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT JULIANO C. BROSAS ES, GEN.TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.013 |
| 156 | 18DF0011ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEM, CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. PASONG CAMACHILE | Region IV-A | Cavite 1st DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.087 |
| 157 | 25DB0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD IN BARANGAY CARLO | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 99% | Medium risk46 | —-0.072 |
| 158 | 23DG0064CONST OF CONC ROAD-CONC OF ROAD, LAUREL BATANGAS(AVOCADOHAN) TO BRGY. BAGONG TUBIG, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱11.9M | 100% | Medium risk46 | —-0.108 |
| 159 | 23DG0021CONST OF CONC ROAD-CONST OF ROAD, BRGY PATOTO-GUINHAWA BY PASS ROAD,BRGY PATUO,TAGAYTAY CITY12-1- | Region IV-A | Cavite 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.101 |
| 160 | 18DG0037LIP-LOCAL ROADS, CONC OF ROAD, BRGY. KAYMISAS, GEN.E. AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱6.6M | 100% | Medium risk46 | —-0.108 |
| 161 | 17DF0095CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT PASONG KAWAYAN II WEST ES, GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱31.7M | 100% | Medium risk46 | —-0.026 |
| 162 | 18DQ0140COMPLETION/ RENOVATION/ EXPANSION OF MAIN HOSPITAL, PAGAMUTANGBAYAN NG CARMONA, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱9.7M | 100% | Medium risk45 | —-0.057 |
| 163 | 17DQ0108CONSTRUCTION OF FOUR (4) STOREY TWENTY FOUR (24) CLASSROOM SCHOOLBUILDING AT GENERAL MARIANO ALVAREZ TECHNICAL HIGH SCHOOL, GENERALMARIANO ALVAREZ, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱46M | 100% | Medium risk44 | —-0.022 |
| 164 | 24DG0107CONCRETING OF BRGY. SAMBONG FMR, BRGY. SAMBONG, TAGAYTAY CITY, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱9.6M | 93% | Medium risk43 | —-0.011 |
| 165 | 17DG0036MFO1-REHB/RECON/UPGRDING OF DAMAGED PAVED NAT'L RD BASED ON PMS/HDM4 ALONG MAR-MAG-AMUYONG RD,MARAG | Region IV-A | Cavite 2nd DEO | Completed | ₱4.6M | 100% | Medium risk40 | —-0.067 |
| 166 | 25DB0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY SAN JOSE, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱1.9M | 0% | Low risk27 | —-0.031 |
| 167 | 25DB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY SABANG, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱1.9M | 0% | Low risk26 | —-0.029 |
| 168 | 18DG0010LIP-MULTI PURPOSE/ FACILITIES, CONST OF COVERED COURT, BRGY. BANABA CERCA, INDANG, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.2M | 100% | Low risk26 | —-0.104 |
| 169 | 24DB0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MALALAY, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱1.9M | 100% | Low risk26 | —-0.101 |
| 170 | 18DG0022LIP-MULTI-PURPOSE/FACILITIES, CONST. OF BRGY. HALL, BRGY. ESPERANZA IBABA, ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.5M | 100% | Low risk26 | —-0.100 |
| 171 | 20DG0022CONST OF MPB, BUCK ESTATE NHS, BRGY BUCK ESTATE, ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱4.5M | 100% | Low risk26 | —-0.104 |
| 172 | 25DB0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING IN BARANGAY BUCANA, NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱1.9M | 58% | Low risk26 | —-0.049 |
| 173 | 18DG0026LIP-LOCAL ROADS, BRGY. MARAHAN II, ALFONSO, CAVITE; | Region IV-A | Cavite 2nd DEO | Completed | ₱3.3M | 100% | Low risk24 | —-0.106 |