Contractor dossier
7 projects on file, including joint ventures this contractor is part of.
Total projects
7
Total budget
₱275.1M
Average progress
100.0%
Completion rate
100.0%
Average risk score
52.5
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 6 | ₱229.3M | 53.1 | 0 | 100.0% |
| Region XII | 1 | ₱45.8M | 49.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Water Provision and Storage | 2 | ₱186.2M | 56.9 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱68.5M | 56.5 | 0 | 100.0% |
| Bridges | 1 | ₱7.7M | 56.0 | 0 | 100.0% |
| Roads | 1 | ₱9.7M | 55.2 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱2.9M | 29.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 19J00080LOCAL PROGRAM WATER MANAGEMENT FACILITIES WATER SUPPLY CONSTRUCTION OF WATER SUPPLY, ISABELA CITY, BASILAN | Region IX | Region IX | Completed | ₱140.4M | 100% | High risk65 | —-0.008 |
| 2 | 18JH0006CONST. OF FLOOD CONTROL STRUCTURE ALONG BASILAN CIRCUMFERENTIAL ROAD (BCR) ISABELA-MALUSO ROAD SECTION K003+700-K004+800 | Region IX | Isabela City DEO | Completed | ₱48.3M | 100% | Medium risk58 | —-0.045 |
| 3 | 18JH0035CONSTRUCTION OF FOOTBRIDGE, BARANGAY MALAMAWI, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱7.7M | 100% | Medium risk56 | —-0.053 |
| 4 | 18JH0004SLOPE PROTECTION WORKS, GROUTED RIPRAP (ISABELA-MALUSO SECTION) K0008+156 -K0008 +356 | Region IX | Isabela City DEO | Completed | ₱9.7M | 100% | Medium risk55 | —-0.078 |
| 5 | 19JH0028CONSTRUCTION OF FLOOD CONTROL DRAINAGE AT ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱20.3M | 100% | Medium risk55 | —-0.056 |
| 6 | 17MH0076CONSTRUCTION OF VARIOUS WATER SUPPLY PROJECTS KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱45.8M | 100% | Medium risk49 | —-0.023 |
| 7 | 19JF0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, MONCHING, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱2.9M | 100% | Low risk30 | —-0.083 |