Contractor dossier
171 projects on file, including joint ventures this contractor is part of.
Total projects
171
Total budget
₱6.5B
Average progress
99.2%
Completion rate
95.9%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
6
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 57 | ₱1.8B | 46.4 | 0 | 100.0% |
| Region IV-A | 53 | ₱1.9B | 52.7 | 1 | 100.0% |
| Region III | 16 | ₱602.7M | 50.2 | 0 | 100.0% |
| Region XI | 11 | ₱709.3M | 51.1 | 2 | 97.0% |
| Region XIII | 11 | ₱427.3M | 47.1 | 1 | 100.0% |
| Region VIII | 9 | ₱414.4M | 50.6 | 0 | 100.0% |
| Region XII | 7 | ₱482.4M | 45.6 | 1 | 85.7% |
| Region X | 5 | ₱43.9M | 20.3 | 0 | 100.0% |
| Negros Island Region | 1 | ₱13.9M | 64.7 | 0 | 100.0% |
| Region II | 1 | ₱44.7M | 57.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 50 | ₱1.9B | 49.5 | 1 | 100.0% |
| Roads | 49 | ₱1.8B | 47.8 | 0 | 99.5% |
| Buildings and Facilities | 37 | ₱1.2B | 41.3 | 2 | 100.0% |
| Bridges | 21 | ₱625.7M | 51.2 | 0 | 100.0% |
| OTHER | 12 | ₱572.7M | 63.1 | 1 | 91.7% |
| Bridges, Roads | 2 | ₱305.2M | 67.8 | 2 | 95.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18NC0067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, NRJ HUBANG-MANAGBAY-ALEGRIA DIVERSION ROAD WITH BRIDGE INCLUDING ROW 0+000.00 - 2+000.00, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱95M | 100% | High risk79 | —-0.008 |
| 17CD0160CONSTRUCTION OF SAN RAFAEL GOVERNMENT CENTER ANNEX BUILDING, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱47.4M | 100% | High risk76 | —-0.068 |
| 18ND0071CONSTRUCTION OF URBAN DRAINAGE/FLOOD CONTROL PROJECT (VILLA KANANGA-LIBERTAD), AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱29.2M | 100% | High risk74 | —-0.031 |
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 18DF0079ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, CRISANTO M DE LOS REYES AVE - K0055+753 - K0056+031, K0056+332 - K0057+505, K0059+033 - K0059+542, K0055+427 - K0056+031, | Region IV-A | Cavite 1st DEO | Completed | ₱92.4M | 100% | High risk73 | —-0.031 |
| 19DD0376ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0144 + 710 - K0146 + 403 | Region IV-A | Batangas 4th DEO | Completed | ₱52.6M | 100% | High risk71 | —-0.041 |
| 17CD0064CONCRETING OF ACCESS ROAD LEADING TO PNP - PHILIPPINE ARMY, RESETTLEMENT AND HOUSING PROJECT, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱47M | 100% | High risk70 | —-0.069 |
| 18DF0080LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUSINFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS,CONCRETING OF BARANGAY SAHUD ULAN - TRES CRUSES ROAD, KM. 41+236.29 - KM. 43+660,TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱91.6M | 100% | High risk69 | —-0.013 |
| 17CD0033IMPROVEMENT / REHABILITATION / REBLOCKING OF BRGY. FRANCISCO HOMES ROAD, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.070 |
| 17CD0081ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SIBUL-BIAK NA BATO ROAD K0089+000 - K0090+066 | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | High risk69 | —-0.070 |
| 17DQ0023MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER,PHASE II, EAST SIDE,BRGY. SAMPALOC I, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALONG | Region IV-A | Cavite 3rd DEO | Completed | ₱46.7M | 100% | High risk69 | —-0.059 |
| 17CD0017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER (PHASE I - RIGHT SIDE), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱42.3M | 100% | High risk68 | —-0.062 |
| 17DF0005MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINA | Region IV-A | Cavite 1st DEO | Completed | ₱37.5M | 100% | High risk68 | —-0.060 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 17DQ0008MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA.16+343 - STA. 16+843, WEST SIDE. BRGY. SALITRAN III,DASMARINAS, CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱46.4M | 100% | High risk68 | —-0.059 |
| 17DQ0009MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA.16+843 - STA. 17+343, WEST SIDE. BRGY. SALITRAN III,DASMARINAS, CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱46.5M | 100% | High risk68 | —-0.059 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 16HM0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CANGMUNAG, SAN JUAN, SIQUIJOR LONE DISTRICT | Negros Island Region | Siquijor DEO | Completed | ₱13.9M | 100% | High risk65 | —-0.038 |
| 21L00073CONSTRUCTION OF GRAVEL ROAD - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE F), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱130.7M | 100% | High risk63 | —-0.056 |
| 17DB0041CONST. AND MAINT. OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES - SECONDARY, P00117145LZ, KASUYAN BR. (B00006LZ) ALONG PALICO-BALAYAN-BATANGAS RD., CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱48.1M | 100% | High risk62 | —-0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 18DF0143CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT FLORENTINO JOYA ES,TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱30.8M | 100% | Medium risk48 | Flagged0.017 |
| 17NE0149CONSTRUCTION OF 2 STOREY SCIENCE LABORATORY @ TUBAJON NHS, SCHOOL ID. 304854, TUBAJON, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Terminated | ₱11.2M | 100% | Medium risk41 | Flagged0.014 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 17BH0175REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), CAMARAG | Region II | Isabela 4th DEO | Completed | ₱44.7M | 100% | Medium risk57 | Flagged0.009 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18OE0011ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:BANK IMPROVEMENT (STEEL SHEET PILES) ESTERO DE MAYPAJO STA. 0+305.96 TO STA. | National Capital Region | North Manila DEO | Completed | ₱23.1M | 100% | Medium risk46 | —-0.087 |
| 127 | 18OE0059ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE VITAS STA. 0+526.40 TO STA. 0+5 | National Capital Region | North Manila DEO | Completed | ₱23.3M | 100% | Medium risk46 | —-0.089 |
| 128 | 19OE0193LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE / PROTECTION WORKS - CONSTRUCTION / IMPROVEMENT OF MALACAÑANG DRAINAGE SYSTEM, MANILA | National Capital Region | North Manila DEO | Completed | ₱12.2M | 100% | Medium risk46 | —-0.101 |
| 129 | 18NC0051CONSTRUCTION OF BY-PASS DIVERSION ROADS OF ROSARIO-MARFIL-TAGBINA ROAD (PACKAGE A) INCLUDING ROW 0+481.50 - 3+151, ROSARIO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱95.3M | 100% | Medium risk46 | —-0.066 |
| 130 | 18NC0045CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, SAN FRANCISCO (NRJ HUBANG-STA. ANA-SAN ISIDRO) BY PASS ROAD (DAANG MAHARLIKA ALTERNATE ROUTE) INCLUDING ROW K0+000 - K2+000, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱95.2M | 100% | Medium risk46 | —-0.073 |
| 131 | 17CD0262CONSTRUCTION OF 4-STOREY, 12-CLASSROOM PRES. DIOSDADO MACAPAGAL MHS, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱30.6M | 100% | Medium risk46 | —-0.023 |
| 132 | 18OA0050REHABILITATION OF ROAD, CAMIA ST., BRGY. TANZA, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱12.1M | 100% | Medium risk45 | —-0.099 |
| 133 | 17OE0059LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING, P. GOMEZ ELEMENTARY SCHOOL, STA. CRUZ, MANILA, STA. CRUZ, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱12M | 100% | Medium risk45 | —-0.074 |
| 134 | 18DB0223CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING THREE (3) STOREY NINE (9) CLASSROOM AT JOCOBO ZOBEL ES (CALATAGAN ES) CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱24.1M | 100% | Medium risk45 | —-0.034 |
| 135 | 17OE0178CONSTRUCTION OF FOUR STOREY TWENTY CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) P. GOMEZ ELEMENTARY SCHOOL, STA. CRUZ, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱58.2M | 100% | Medium risk44 | —-0.015 |
| 136 | 22LB0232CONSTRUCTION OF DRAINAGE SYSTEM AT DIAMOND STREET, BARANGAY GOV. PACIANO BANGOY, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱6.9M | 100% | Medium risk44 | —-0.066 |
| 137 | 18LH0087CONSTRUCTION OF AQUATICS CENTER (PHASE 1) UP MINDANAO, MINTAL, TUGBOK DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱47.5M | 100% | Medium risk44 | —-0.043 |
| 138 | 17OE0186CONSTRUCTION OF FOUR-STOREY TWENTY FOUR CLASSROOM SCHOOL BUILDING A.V. HERNANDEZ ELEMENTARY SCHOOL, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱61.5M | 100% | Medium risk43 | —-0.005 |
| 139 | 17DF0091CONSTRUCTION OF 2 UNITS 2STY 4CL SCHOOL BUILDING AT TRECE MARTIRES CITY SENIOR HIGH SCHOOL | Region IV-A | Cavite 1st DEO | Completed | ₱18.2M | 100% | Medium risk43 | —-0.032 |
| 140 | 17DE0077CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 4 STY 12 CL AT PAHARANG NATIONAL HIGH SCHOOL, BATANGAS CITY (CAPITAL), BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱31.5M | 100% | Medium risk43 | —-0.003 |
| 141 | 19M00012ROAD WIDENING-COTABATO-MARBEL RD K1726+558-K1729+123, K1732+700-K1733+680, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱106.1M | 100% | Medium risk43 | —-0.070 |
| 142 | 17OE0193CONSTRUCTION OF FOUR STOREY SIXTEEN CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) P. GOMEZ ELEMENTARY SCHOOL, STA. CRUZ, MANILA | National Capital Region | North Manila DEO | Completed | ₱51.7M | 100% | Medium risk43 | —-0.008 |
| 143 | 17OE0200CONSTRUCTION OF FOUR STOREY SIXTEEN CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) ELPIDIO QUIRINO HIGH SCHOOL, STA. MESA, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱50.8M | 100% | Medium risk43 | —-0.016 |
| 144 | 18LF0071CONCRETING OF JUNCTION OLD MACOPA - SITIO MADSAYAP - SITIO DAHICAN FMR, BRGY. MACOPA, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱9.6M | 100% | Medium risk41 | —-0.024 |
| 145 | 17M00023ROAD UPGRADING (UNPAVED TO PAVED) ALONG PACO ROXAS-ARAKAN VALLEY ROAD, K1681+158 TO K1681+948, ( CHAINAGE 56777 TO CHAINAGE 57567), K1685+355 - K1685+480 (CHAINAGE 1794 - CHAINAGE 1919), ARAKAN-KATIPUNAN SECTION, COTABATO | Region XII | Region XII | Completed | ₱46.6M | 100% | Medium risk41 | —-0.053 |
| 146 | 17NE0149CONSTRUCTION OF 2 STOREY SCIENCE LABORATORY @ TUBAJON NHS, SCHOOL ID. 304854, TUBAJON, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Terminated | ₱11.2M | 100% | Medium risk41 | Flagged0.014 |
| 147 | 17OA0100CONST. OF 4 STOREY 16 CL.RM. SB TUGATOG NHS, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱53.4M | 100% | Medium risk41 | —-0.006 |
| 148 | 18NA0037ROAD WIDENING TERTIARY ROADS, PANDANON-MAGALLANES RD, K1217+100 - K1217+678, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱16.6M | 100% | Medium risk39 | —-0.088 |
| 149 | 18NA0028CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ-COMAGASCAS DEL PILAR-PIRADA LEADING TO TUNNEL ROAD, BRGY. DEL PILAR, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱18.6M | 100% | Medium risk39 | —-0.088 |
| 150 | 17MC0075WIDENING OF BRIDGE - DALAPUAY BR. (B00224MN), ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱30.3M | 100% | Medium risk38 | —-0.028 |