Contractor dossier
171 projects on file, including joint ventures this contractor is part of.
Total projects
171
Total budget
₱6.5B
Average progress
99.2%
Completion rate
95.9%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
6
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 57 | ₱1.8B | 46.4 | 0 | 100.0% |
| Region IV-A | 53 | ₱1.9B | 52.7 | 1 | 100.0% |
| Region III | 16 | ₱602.7M | 50.2 | 0 | 100.0% |
| Region XI | 11 | ₱709.3M | 51.1 | 2 | 97.0% |
| Region XIII | 11 | ₱427.3M | 47.1 | 1 | 100.0% |
| Region VIII | 9 | ₱414.4M | 50.6 | 0 | 100.0% |
| Region XII | 7 | ₱482.4M | 45.6 | 1 | 85.7% |
| Region X | 5 | ₱43.9M | 20.3 | 0 | 100.0% |
| Negros Island Region | 1 | ₱13.9M | 64.7 | 0 | 100.0% |
| Region II | 1 | ₱44.7M | 57.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 50 | ₱1.9B | 49.5 | 1 | 100.0% |
| Roads | 49 | ₱1.8B | 47.8 | 0 | 99.5% |
| Buildings and Facilities | 37 | ₱1.2B | 41.3 | 2 | 100.0% |
| Bridges | 21 | ₱625.7M | 51.2 | 0 | 100.0% |
| OTHER | 12 | ₱572.7M | 63.1 | 1 | 91.7% |
| Bridges, Roads | 2 | ₱305.2M | 67.8 | 2 | 95.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18NC0067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, NRJ HUBANG-MANAGBAY-ALEGRIA DIVERSION ROAD WITH BRIDGE INCLUDING ROW 0+000.00 - 2+000.00, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱95M | 100% | High risk79 | —-0.008 |
| 17CD0160CONSTRUCTION OF SAN RAFAEL GOVERNMENT CENTER ANNEX BUILDING, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱47.4M | 100% | High risk76 | —-0.068 |
| 18ND0071CONSTRUCTION OF URBAN DRAINAGE/FLOOD CONTROL PROJECT (VILLA KANANGA-LIBERTAD), AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱29.2M | 100% | High risk74 | —-0.031 |
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 18DF0079ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, CRISANTO M DE LOS REYES AVE - K0055+753 - K0056+031, K0056+332 - K0057+505, K0059+033 - K0059+542, K0055+427 - K0056+031, | Region IV-A | Cavite 1st DEO | Completed | ₱92.4M | 100% | High risk73 | —-0.031 |
| 19DD0376ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0144 + 710 - K0146 + 403 | Region IV-A | Batangas 4th DEO | Completed | ₱52.6M | 100% | High risk71 | —-0.041 |
| 17CD0064CONCRETING OF ACCESS ROAD LEADING TO PNP - PHILIPPINE ARMY, RESETTLEMENT AND HOUSING PROJECT, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱47M | 100% | High risk70 | —-0.069 |
| 18DF0080LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUSINFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS,CONCRETING OF BARANGAY SAHUD ULAN - TRES CRUSES ROAD, KM. 41+236.29 - KM. 43+660,TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱91.6M | 100% | High risk69 | —-0.013 |
| 17CD0033IMPROVEMENT / REHABILITATION / REBLOCKING OF BRGY. FRANCISCO HOMES ROAD, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.070 |
| 17CD0081ASSET PRESERVATION OF NATIONAL ROADS CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SIBUL-BIAK NA BATO ROAD K0089+000 - K0090+066 | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | High risk69 | —-0.070 |
| 17DQ0023MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER,PHASE II, EAST SIDE,BRGY. SAMPALOC I, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALONG | Region IV-A | Cavite 3rd DEO | Completed | ₱46.7M | 100% | High risk69 | —-0.059 |
| 17CD0017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER (PHASE I - RIGHT SIDE), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱42.3M | 100% | High risk68 | —-0.062 |
| 17DF0005MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINA | Region IV-A | Cavite 1st DEO | Completed | ₱37.5M | 100% | High risk68 | —-0.060 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 17DQ0008MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA.16+343 - STA. 16+843, WEST SIDE. BRGY. SALITRAN III,DASMARINAS, CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱46.4M | 100% | High risk68 | —-0.059 |
| 17DQ0009MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, STA.16+843 - STA. 17+343, WEST SIDE. BRGY. SALITRAN III,DASMARINAS, CAVITE, 4TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱46.5M | 100% | High risk68 | —-0.059 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 16HM0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT CANGMUNAG, SAN JUAN, SIQUIJOR LONE DISTRICT | Negros Island Region | Siquijor DEO | Completed | ₱13.9M | 100% | High risk65 | —-0.038 |
| 21L00073CONSTRUCTION OF GRAVEL ROAD - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE F), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱130.7M | 100% | High risk63 | —-0.056 |
| 17DB0041CONST. AND MAINT. OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES - SECONDARY, P00117145LZ, KASUYAN BR. (B00006LZ) ALONG PALICO-BALAYAN-BATANGAS RD., CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱48.1M | 100% | High risk62 | —-0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 18DF0143CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT FLORENTINO JOYA ES,TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱30.8M | 100% | Medium risk48 | Flagged0.017 |
| 17NE0149CONSTRUCTION OF 2 STOREY SCIENCE LABORATORY @ TUBAJON NHS, SCHOOL ID. 304854, TUBAJON, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Terminated | ₱11.2M | 100% | Medium risk41 | Flagged0.014 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 17BH0175REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), CAMARAG | Region II | Isabela 4th DEO | Completed | ₱44.7M | 100% | Medium risk57 | Flagged0.009 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18KK0155CONSTRUCTION OF 2STY 4 LAB. SAN JUAN NHS, BALINGASAG, MIS. OR. | Region X | Misamis Oriental 1st DEO | Completed | ₱17.4M | 100% | Medium risk38 | —-0.046 |
| 152 | 18NA0044CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RING DIKE ALONG LAKE MAINIT (BRGY. LAPAZ, SANTIAGO SECTION), AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱20.8M | 100% | Medium risk38 | —-0.070 |
| 153 | 17OE0172CONSTRUCTION OF TWO STOREY SIXTEEN CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) BACOOD ELEMENTARY SCHOOL, STA. MESA, MANILA | National Capital Region | North Manila DEO | Completed | ₱43.2M | 100% | Medium risk37 | —-0.013 |
| 154 | 18NI0006CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-JCT. BACULIN ACCESS ROAD LEADING TO HARIP WHITE BEACH RESORT, BRGY. HARIP, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱18.7M | 100% | Medium risk37 | —-0.075 |
| 155 | 17OE0174CONSTRUCTION OF FOUR STOREY TWELVE CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) TIMOTEO PAEZ INTEGRATED SCHOOL, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱37.2M | 100% | Medium risk36 | —-0.010 |
| 156 | 17OE0002RENOVATION OF LYING-IN, ESPERANZA HEALTH CENTER AND LYING-IN, CITY OF MANILA | National Capital Region | North Manila DEO | Completed | ₱5.4M | 100% | Medium risk36 | —-0.030 |
| 157 | 17OE0050REHABILIATION OF BACOOD HEALTH CENTER BACOOD, STA. MESA | National Capital Region | North Manila DEO | Completed | ₱9.3M | 100% | Medium risk36 | —-0.029 |
| 158 | 17OE0171CONSTRUCTION OF TWO STOREY TEN CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) E. JACINTO ELEMENTARY SCHOOL, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱23.9M | 100% | Medium risk36 | —-0.016 |
| 159 | 16OA0079CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CL.RM. SCHOOL BLDG. NINOY AQUINO ES, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱20M | 100% | Medium risk34 | —-0.027 |
| 160 | 19CL0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS SAN ANTONIO-SUBIC ROAD, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47M | 100% | Medium risk34 | —-0.061 |
| 161 | 22CD0176CONCRETING OF ROAD AT PUROK 3,4,6,7,8 AND SITIO TULAY NA PATPAT IN BASUIT, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱38.6M | 100% | Medium risk34 | —-0.104 |
| 162 | 19CC0110CONSTRUCTION OF BARANGAY SAN ROQUE ROAD PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24M | 100% | Medium risk34 | —-0.104 |
| 163 | 22CD0104NETWORK DEVELOPMENT PROGRAM ROAD WIDENING SAN MIGUEL SIBUL RD, K0078+279 K0078+736 | Region III | Bulacan 2nd DEO | Completed | ₱30.4M | 100% | Medium risk33 | —-0.105 |
| 164 | 18ND0114CONSTRUCTION OF FOUR REGULAR WORKSHOP, TWO-STOREY (8 CLASSROOMS) SCHOOL BUILDING @ SAN VICENTE NATIONAL HIGH SCHOOL, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱18.1M | 100% | Medium risk32 | —-0.043 |
| 165 | 19CC0085RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES ATLAG BRIDGE (B01726LZ) ALONG BIGAA-PLARIDEL VIA BULACAN AND MALOLOS ROAD MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.6M | 100% | Medium risk31 | —-0.065 |
| 166 | 18CD0015CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA AT SAN MIGUEL RIVER BARDIAS SECTION, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.8M | 100% | Medium risk30 | —-0.093 |
| 167 | 18MC0137CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (STA. 45+952-STA. 46+280 (BOTH SIDES), BRGY. ALEGRIA, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱40.2M | 100% | Low risk26 | —-0.074 |
| 168 | 17KB0119CONSTRUCTION OF 1 UNIT, 2 STY - 4 CL SCHOOL BUILDING, NEW NONGNONGAN NHS-SAN NICOLAS ANNEX, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱9.7M | 100% | Low risk19 | —-0.023 |
| 169 | 17KB0072CONSTRUCTION OF 1 UNIT, 1 STY-2 CL SCHOOL BUILDING, LUMINTAO ES, LUMINTAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱6M | 100% | Low risk18 | —-0.023 |
| 170 | 17KB0132CONSTRUCTION OF 1 UNIT, 2 STY - 4 CLASSROOM SCHOOL BUILDING, BNSHI, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱8.9M | 100% | Low risk18 | —-0.023 |
| 171 | 18KB0005CONSTRUCTION OF SCHOOL BUILDING, LUMINTAO ES, BRGY LUMINTAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱1.9M | 100% | Low risk9 | —-0.094 |