Contractor dossier
234 projects on file, including joint ventures this contractor is part of.
Total projects
234
Total budget
₱21.2B
Average progress
92.3%
Completion rate
74.4%
Average risk score
56.1
Medium risk on average, out of 100
Flagged as unusual
29
12.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 92 | ₱6.3B | 58.1 | 10 | 93.7% |
| Region IV-B | 67 | ₱7.9B | 52.9 | 10 | 90.7% |
| Region III | 12 | ₱945.7M | 53.0 | 0 | 94.7% |
| Region II | 11 | ₱1.1B | 55.8 | 0 | 100.0% |
| Negros Island Region | 11 | ₱701.2M | 54.5 | 1 | 84.9% |
| Region VII | 7 | ₱1.3B | 65.5 | 5 | 82.5% |
| Region IV-A | 7 | ₱702.9M | 60.8 | 0 | 98.4% |
| Region XI | 6 | ₱539.6M | 57.3 | 0 | 90.0% |
| Region XII | 5 | ₱479.6M | 65.9 | 3 | 72.3% |
| Region XIII | 4 | ₱385.9M | 43.5 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱237.6M | 56.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱130.6M | 52.2 | 0 | 100.0% |
| Region VIII | 2 | ₱282.8M | 63.7 | 0 | 86.0% |
| Region X | 2 | ₱168.3M | 54.6 | 0 | 100.0% |
| Region I | 2 | ₱98M | 47.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 101 | ₱11.2B | 56.6 | 16 | 90.1% |
| Roads | 87 | ₱7.8B | 54.1 | 3 | 95.8% |
| Bridges | 21 | ₱695.7M | 53.6 | 2 | 89.5% |
| OTHER | 13 | ₱1.3B | 79.2 | 7 | 86.0% |
| Buildings and Facilities | 12 | ₱251.1M | 45.6 | 1 | 97.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24F00441CAPITAL OUTLAY - DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - LGU HOSPITALS-CAMARINES NORTE PROVINCIAL HOSPITAL, CAMARINES NORTE, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱39.4M | 93% | High risk85 | Flagged0.038 |
| 24F00383CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF CAMARINES NORTE PROVINCIAL HOSPITAL, DAET, CAMARINES NORTE | Region V | Region V | On-Going | ₱216.7M | 75% | High risk82 | Flagged0.022 |
| 24MC0045CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 46 + 900 - STA. 47 + 125 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 32% | High risk82 | Flagged0.035 |
| 24MC0043CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 45 + 642 - STA. 46 + 292 R/S (PHASE II), BARANGAY ALEGRIA, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 92% | High risk82 | Flagged0.018 |
| 24CL0163CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 10, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.1M | 97% | High risk82 | —-0.014 |
| 24MC0047CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 48 + 944 - STA. 49 + 284 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 38% | High risk81 | Flagged0.032 |
| 23HK0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. TALUNGON, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 17F00015MFO1-IMPROVEMENT/WIDENING OF NATIONAL ROADS-OTHER PRIMARY ROADS:ROLANDO A. ANDAYA HIGHWAY, K0336+496.00-K0341+637.00 WITH EXCEPTIONS, SIPOCOT, CAMARINES SUR PROVINCE | Region V | Region V | Completed | ₱130.7M | 100% | High risk81 | —-0.013 |
| 24CL0061CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 4, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.046 |
| 23H00046OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, BAGUMBAYAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱217.1M | 89% | High risk78 | Flagged0.043 |
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
| 24F00495ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱159.1M | 38% | High risk78 | Flagged0.018 |
| 16F00084DAET-TALOBATIB-BATOBALANI-PARACALE ROAD LEADING TO CALAGUAS ISLAND(MAHABANG BUHANGIN) PULANG DAGA BEACH & SENAKULO BEACH TO GUMAUS BEACH AND BULALAKAO BEACH, PARACALE, CAMARINES NORTE | Region V | Region V | Completed | ₱96.5M | 100% | High risk77 | —-0.022 |
| 17FF0020OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG LAGONOY-PRESENTACION ROAD (PAVING OF SHOULDER WITH DRAINAGE IMPROVEMENT AND ROAD SAFETY FEATURES) BINANUAHAN-BALIWAG SECTION, LAGONOY, CAMARINES SUR K0498+(-817)-K0498+870;K0499+360-K0501+532 | Region V | Camarines Sur 4th DEO | Completed | ₱46.4M | 100% | High risk76 | —-0.035 |
| 16F00085MAINTENANCE & CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURE, CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, DAET-LABO-TULAY NA LUPA ROAD INCLUDING CALABASA-TALOBATIB ROAD, LABO, CAMARINES NORTE | Region V | Region V | Completed | ₱72.4M | 100% | High risk76 | —-0.027 |
| 17FG0030INDV. PROJ. REHABILITATION/CONCRETE PAVING OF DAO STREET, STO. DOMINGO-LA PURISIMA ROAD, IRIGA CITY STA. 0+000 - STA. 1+317 | Region V | Camarines Sur 5th DEO | Completed | ₱18.1M | 100% | High risk76 | —-0.036 |
| 25F00077ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGA | Region V | Region V | On-Going | ₱237.4M | 92% | High risk75 | Flagged0.003 |
| 25F00251ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱153.5M | 0% | High risk73 | Flagged0.028 |
| 16F00149RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: BARIT RIVER (UPSTREAM CRESCINI BRIDGE), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱82.5M | 99% | High risk73 | Flagged0.058 |
| 25F00249ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 1), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱101.5M | 0% | High risk73 | Flagged0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
| 16F00149RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: BARIT RIVER (UPSTREAM CRESCINI BRIDGE), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱82.5M | 99% | High risk73 | Flagged0.058 |
| 23H00046OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, BAGUMBAYAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱217.1M | 89% | High risk78 | Flagged0.043 |
| 24F00441CAPITAL OUTLAY - DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - LGU HOSPITALS-CAMARINES NORTE PROVINCIAL HOSPITAL, CAMARINES NORTE, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱39.4M | 93% | High risk85 | Flagged0.038 |
| 23E00242SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- REPAIR/REHAB. OF DAMAGED/COLLAPSED FLOOD CONTROL STRUCTURE ALONG MOGPOG RIVER, BRGY. CANDAHON-POBLACION, MOGPOG, MARIND | Region IV-B | Region IV-B | On-Going | ₱93.1M | 78% | High risk67 | Flagged0.037 |
| 23E00243SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- REPAIR/REHAB. OF DAMAGED/COLLAPSED FLOOD CONTROL STRUCTURE ALONG LAPU-LAPU RIVER, BRGY. MAHARLIKA 1ST ZONE SECTION, STA. | Region IV-B | Region IV-B | On-Going | ₱96.5M | 83% | High risk66 | Flagged0.037 |
| 23E00241SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE/ESPLANADE ALONG MOGPOG RIVER, BRGY. CANDAHON SECTION, MOGPOG, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱96.5M | 86% | High risk66 | Flagged0.036 |
| 24MC0045CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 46 + 900 - STA. 47 + 125 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 32% | High risk82 | Flagged0.035 |
| 24MC0047CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 48 + 944 - STA. 49 + 284 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 38% | High risk81 | Flagged0.032 |
| 25F00251ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱153.5M | 0% | High risk73 | Flagged0.028 |
| 24F00383CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF CAMARINES NORTE PROVINCIAL HOSPITAL, DAET, CAMARINES NORTE | Region V | Region V | On-Going | ₱216.7M | 75% | High risk82 | Flagged0.022 |
| 25F00249ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 1), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱101.5M | 0% | High risk73 | Flagged0.019 |
| 24MC0043CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 45 + 642 - STA. 46 + 292 R/S (PHASE II), BARANGAY ALEGRIA, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 92% | High risk82 | Flagged0.018 |
| 24F00495ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱159.1M | 38% | High risk78 | Flagged0.018 |
| 23H00022OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VALLADOLID SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.7M | 67% | High risk67 | Flagged0.016 |
| 23H00023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURURE, GOTOZAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱215M | 64% | High risk67 | Flagged0.016 |
| 23HK0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. TALUNGON, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 24E00006BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱239.9M | 63% | High risk67 | Flagged0.011 |
| 25F00388CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, PALASPAS, DEL GALLE | Region V | Region V | On-Going | ₱178.2M | 4% | High risk72 | Flagged0.009 |
| 17FE0097CONSTRUCTION OF TWO (2) UNITS FOUR (4) STOREY TWENTY FOUR (24) CLASSROOM SENIOR HIGH SCHOOL BUILDING,(UNDER DEPED CY 2016 BEFF BATCH 11) CAMARINES SUR NATIONAL HIGH SCHOOL (LIBOTON ANNEX) , NAGA CITY,CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱102.5M | 100% | Medium risk53 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23CL0046CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PAMATAWAN RIVER, PHASE II, SAN MIGUEL, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.6M | 95% | High risk64 | —-0.030 |
| 77 | 23DQ0051CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING, PHASE 2, BARANGAY IBA SECTION, SILANG, CAVITE AND CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING GOVERNORS DRIVE (GMA SECTION), PHASE 2, GENERA | Region IV-A | Cavite 3rd DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.031 |
| 78 | 23DQ0053CONSTRUCTION OF BANK SLOPE STRUCTURE ALONG SAN ISIDRO RIVER, PHASE 1, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.068 |
| 79 | 23DQ0052CONSTRUCTION OF BANK SLOPE STRUCTURE ALONG SAN ISIDRO RIVER, PHASE 2, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.068 |
| 80 | 23CL0041CONSTRUCTION OF FLOOD CONTROL AT LAUIS RIVER, PHASE II, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 75% | High risk64 | —-0.021 |
| 81 | 25E00228SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ESTRELLA-BRGY. SAN JOSE, STA. 000+617-STA. 001+148.6, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 45% | High risk64 | —-0.023 |
| 82 | 18F00059ASSET PRESERVATION-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROAD, SAN FERNANDO NORTH ROAD, TICAO ISLAND, MASBATE | Region V | Region V | Completed | ₱65.9M | 100% | High risk63 | —-0.094 |
| 83 | 25E00229SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENTRESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG ESTRELLA, STA. 000+000-STA. 000+616.85, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱277.2M | 42% | High risk63 | —-0.018 |
| 84 | 24E00001NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0057+460-K0064+994 (INTERMITTENT SECTIONS), MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱148.2M | 40% | High risk62 | —-0.029 |
| 85 | 18F00091OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), K0376+006-K0377+540, CAMARINES SUR | Region V | Region V | Completed | ₱91.1M | 100% | High risk62 | —-0.082 |
| 86 | 22E00121CLUSTER 22: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE CIOLLAPSE AND LANDSLIDE ALONG TAYTAY-BANTULAN-STA. CRUZ PORT ROAD, 22.1: STA. 1+026-STA. 1+161 (R/S); 22.2: STA. 1+057-STA. 1+164 (L/S); 22.3: STA. | Region IV-B | Region IV-B | On-Going | ₱252.4M | 87% | High risk62 | Flagged0.008 |
| 87 | 23HK0089SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, BRGY. CAMBUILAO, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 83% | High risk62 | —-0.012 |
| 88 | 23HK0066SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. POLO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 69% | High risk62 | —-0.006 |
| 89 | 23HK0067SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. TUGAS, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 81% | High risk62 | —-0.011 |
| 90 | 24OC0099ASPHALT OVERLAY ALONG C5 EXTENSION WB, DISTRICT 1PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱92.6M | 100% | High risk62 | —-0.025 |
| 91 | 22LF0112SURIGAO DEL SUR BDRY.-DAVAO OR COASTAL RD.-K1692+580-K1692+720, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.061 |
| 92 | 23F00091CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF DIVERSION/BYPASS ROAD,(CORY AQUINO BOULEVARD | Region V | Region V | Completed | ₱67.5M | 100% | High risk61 | —-0.095 |
| 93 | 22FG0032REHAB./RECONST. ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE RD.K0498+800.00 - K0498+928.00;K0499+490.00 - K0499+561.00K0500+246.00 - K0500+268.00;K0500+456.00 - K0500+576.00 LAGONOY CAM SUR | Region V | Camarines Sur 4th DEO | Completed | ₱91.7M | 100% | High risk61 | —-0.089 |
| 94 | 22E00116CLUSTER 9: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PORT BARTON-KEMDENG ROAD, 9.1: STA. 0+218-STA. 0+250; 9.2: STA. 0+250-STA. 0+458; 9.3: STA. 0+458-STA. 0+485; 9.4: ST | Region IV-B | Region IV-B | Completed | ₱197M | 100% | High risk61 | —-0.041 |
| 95 | 17BB0021ASSET PRESERVAT'N OF NAT'L RDS-REHAB./RECONST. OF NAT'L RDS.W/ SLIPS,SLOPE COLLAPSE& LANDSLIDE-TERTIARY REHAB./MAJOR REPAIR OF RD.SLOPE PROTECTION STRUCT - JLLGR - K0707+035-K0707+282.30(L/S) TOK0710+437.90-K0710+452.70(B/S),BRGYS.LOGAC& BICUD,LAL-LO,CAG. | Region II | Cagayan 1st DEO | Completed | ₱46.2M | 100% | High risk60 | —-0.034 |
| 96 | 23PK0024ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS: MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD - K0428 + | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱95.5M | 100% | Medium risk60 | —-0.034 |
| 97 | 23F00125CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF CAMARINES NORTE MEDICAL CENTER, DAET, CAMARINES NORTE (PHASE 1), DAET, CAMARINES NORTE(2ND LEGISLA | Region V | Region V | On-Going | ₱39M | 73% | Medium risk60 | —-0.041 |
| 98 | 22LF0108SURIGAO DEL SUR BDRY.DAVAO OR COASTAL RD-K1515+105-K1515+205, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.062 |
| 99 | 22LF0110SURIGAO DEL SUR BDRY.-DAVAO OR COASTAL RD-K1525+720-K1525+860, BOSTON , DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.062 |
| 100 | 22LF0111SURIGAO DEL SUR BDRY.-DAVAO OR. COASTAL RD. K1536+680-K1536+740,K1536+780-K1536+840, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.063 |